Estimator - King infrastructure
(2026-01 - 2026-06)
- Analyze documents, specifications, proposals, addendum's in preparation for pricing.
- Reviewing project site prior to price preparation
- Obtain prices from suppliers and subcontractor.
- Attend Site meeting if required.
- Request Bonding and COI.
- Doing takeoff via bluebeem if required.
Estimator (Part Time) - All PAVE
(2025-10 - 2026-01)
- Analyze documents, specifications, proposals, addendum's in preparation for pricing.
- Reviewing project site prior to price preparation.
- Performs quantity take-off from construction drawings using tally system or planSwift 10.
- Obtain pricing from suppliers, subcontractors and incorporate into estimate.
Construction Estimator (Contract) - Bond Paving & Construction
(2025-06 - 2025-08)
- Analyze documents, specifications, proposals, addendum's in preparation for pricing.
- Reviewing project site prior to price preparation.
- Performs quantity take-off from construction drawings using tally system or planSwift 10.
- Obtain pricing from suppliers, subcontractors and incorporate into estimate.
- Landscaping and Play Ground Areas.
Estimator (Contract) - Bousada Flooring
(2024-09 - 2025-05)
- Analyze documents, specifications, proposals and addendum's in preparation for pricing.
- Reviewing project site prior to price preparation.
- Performs quantity take-off from construction drawings using planswift.
- Obtain pricing from suppliers and incorporate into estimate.
Estimator (Contract) - C. Valley Group
(2024-04 - 2024-08)
- Analyze documents, specifications, proposals, addendum's in preparation for pricing.
- Reviewing project site prior to price preparation.
- Performs quantity take-off from construction drawings using Blue Beam.
- Work under pressure to meet dead line.
- Attend Site meetings.
Estimation Engineer - My Concrete/Ontario System Stucco
(2023-11 - 2024-04)
- Analyze documents, specifications and proposals in preparation for pricing.
- Interpret Structural , civil and Architectural drawing to do takeoff on Con. , Rebar, Excavation and Stucco.
- Review addendums and amend the quantities if required.
- Obtain prices from suppliers.
- Send RFI if any discrepancies in the drawings.
- Review the estimate with the owner before submission.
- Work under pressure to meet dead line.
Estimator - Perella Flooring
(2022-06 - 2023-09)
- Analyze documents, specifications, proposals and addendum's in preparation for pricing.
- Reviewing project site prior to price preparation.
- Performs quantity take-off from construction drawings using planswift.
- Obtain pricing from suppliers and incorporate into estimate.
Estimator / Project Manager - IPAC PAVING
(2020-01 - 2022-04)
- Analyze documents, specifications, proposals, addendum's in preparation for pricing.
- Reviewing project site prior to price preparation.
- Performs quantity take-off from construction drawings using tally system or planSwift 10.
- Obtain pricing from suppliers, subcontractors and incorporate into estimate.
Jr. Estimator/ Jr. Project Manager - IPAC PAVING
(2018-06 - 2019-12)
- Analyze documents, specifications, proposals, addendum's in preparation for pricing.
- Reviewing project site prior to price preparation.
- Performs quantity take-off from construction drawings using tally system or planSwift 10.
- Obtain pricing from suppliers, subcontractors and incorporate into estimate.
Quantity Surveyor/ Chief Estimator - Kahale Technical Group
(2013 - 2016)
Project: Combined Cycle Power Plant II, consists of 2x250 MW Gas Turbines, 1x250 MW Steam Turbine, two HRSGs and all associated BOP equipment & piping.
- Quantity surveyor for variety of works such as: piping insulation, HVAC duct,structural steel, Rebar, Concrete and underground piping works.
- Drafting duties using AutoCAD .
Cheif Estimator - Suriana General Contracting
(2009 - 2013)
Project: Syrian international University for Science and Technology.
- Renovating Exterior and Interior Finishes such as : Plaster, Paint, Marble, Drywall, Concrete, Rebar and tiles.
- Created accurate cost estimate by analyzing tender offers and negotiating contract prices with suppliers for commercial and residential projects
- Ensured bidding quality by verifying and finalizing bid documents in close coordination with chief estimator
- Provided accurate assessment of projected costs by estimating cost of material, labor, and equipment for residential and commercial projects
- Found cost effective solution by assisting Project Manager in tender preparations
Senior Estimator - Sameer Mokbel & Partners General Contracting
(2007 - 2009)
Project: villa housing compound consist of 107 villas –Private villa- Health club –main gatefire Fighting Pipes – drainage manhole – water supply and storm water- From Scratch.
- From Scratch: Excavation, Backfilling, Plaster, Paint, marble and tiles.
- Ensured construction plans met guidelines by analyzing and including outstanding contract requirements and deliverables
- Updated project and saved material costs by estimating construction costs based on revised design specifications
- Provided an accurate assessment of projected costs by using PlanSwift software
- Monitored project efficiency by submitting monthly report to the Project Manager
- Provided an accurate assessment of projected costs by using MS Project for residential and commercial projects