نبذة

im interested to working of the GE

الخبرة

 Company: Industrial assembly company / ETTERKIB / Sonalgaz group subsidiary.

Grade:Electrical Installation Team Leader. December 2008 to February 2010.

Location: Power plant gas Turbine Larbaa (4 x 139.9 Mw) and AIS substation (60 / 22OKV).

-Role and responsibilities (Electrical assembly of the AIS substation):

  • Responsible for the daily activity of the staff (13 people).
  • Installation of the circuit breakers, which are used to switch off the current.
  • Installation of disconnectors, which are used to isolate a part of the substation.
  • Installation of integrated earthing devices (similar to disconnectors), surge arrester.
  • Installation of power transformers 220/60/30 kv and 30 / 10kv.
  • Mounting of measuring transformers (Current Transformers, Voltage Transformers, Measurement Units).
  • Installation of busbars.

- Role and responsibilities (Electrical installation of the power Plant ):

  • Assembly of the coaxial ducts of each turbine.

-Installation, installation and connection of AIRO lighting fixtures and

Main transformer, filling and auxiliaries.

-Installation of disconnector, T.T and TC, surge arrester of the station of each turbine.

-Mounting of supports and installation of batteries for each turbine.

التعليم

II- Studies:

A- Secondary education:

Degree: BAC Electro technique.Year: 92/93.

Location: Cherchell Technical College.

B- University studies:

Degree: Diploma of Applied University Studies in Electrotechniques.

Year: 99