Skip to main content
Alexander Michael Kerr

Alexander Michael Kerr

Production Discipline Coach for BP International in Azerbaijan.

Talent
DunfermlineMember since April 7, 2026
Oil and Gas OperationsPlant CommissioningProduction Technician CoachingProcess IsolationHAZOP AnalysisControl Room OperationsElectrical SystemsInstrumentationMachinery MaintenancePAT TestingProcedure Writing and ReviewTeam SupervisionTraining and AssessmentABBYY CMSS SystemTDC 2000 & PMX ConsolesICSS GraphicsMulti-Skilled TechnicianEthylene ProductionMaintenance Management
·

Hire this person

Send a job offer directly to this candidate

Oil and Gas OperationsPlant CommissioningProduction Technician CoachingProcess IsolationHAZOP Analysis

About

Experienced operations and production technician with extensive offshore and onshore industrial background spanning over 40 years. Expertise in oil and gas production, plant commissioning, operations coaching, and multi-skilled technical maintenance. Proven track record in leading teams, developing procedures, and managing complex industrial projects across Europe and Azerbaijan.

Experience

Volunteer Patient Transfer Driver at St Johns (2024-06 – Present)

Volunteer Patient Transfer Driver for St Johns, taking dialysis patients to and from hospital to their homes.

  • Transport dialysis patients to and from hospital

Single handed Maintenance/Handyman at Pharmacy Group (Fife and Edinburgh) (2021-01-06 – 2022-01-23)

Single handed Maintenance/Handyman for 11 Pharmacies throughout Fife and Edinburgh.

  • Respond, plan, purchase and carry out all maintenance, breakdown and repair to all associated equipment and buildings within the group
  • PAT testing all existing and new electrical appliances

Early Retirement at BP (2017-10-13 – 2021-12-06)

Early retirement from BP and waiting for the right opportunity to utilize my experience and skills.

Production Discipline Coach at BP Shah Deniz 2 Project (2012-01-01 – 2017-10-12)

Transferred from Shah Deniz Gas Plant to Shah Deniz 2 project team. Participated in HAZOPs and assisted with set-up of infrastructure on brownfield site. Promoted to Production Discipline Coach.

  • Coaching and assessing of Shah Deniz 2 trainee technicians
  • Coordinating Production Technician Coaches/Assessors
  • Writing and reviewing start-up procedures, SOGs and WBTs for the Shah Deniz 2 plant

Operations Coach/Assessor at BP Shah Deniz Gas Terminal (2004-08-01 – 2011-12-31)

Assigned to BP Shah Deniz Gas Terminal, Baku, Azerbaijan as Operations Coach/Assessor. Worked from offices in Sutton, Surrey and ABB offices St Neots for ICSS graphics building until mobilized to Baku in October 2005 for construction and commissioning duties on 28/28 rota.

  • Took part in pre-commissioning, commissioning, start-up
  • Coached on the Gas/Gas Condensate plant as Technician Coach/Competency Assessor for national technicians
  • Target for 100% plant nationalization
  • Supervised national technicians and identified potential supervisory candidates for progression
  • Competent BP Production Technician Coach, Production Technician Assessor, Area Authority, Process Isolation Assessor, Process Isolation Coach, Isolating Authority Process/Control and Performing Authority

Operations Technician at BP North West Hutton Platform (2001-07-01 – 2004-07-31)

Recruited to BP as an Operations Technician and assigned to the North West Hutton platform. Trained initially on oil production and then operating between the control room and the plant.

  • Active participation in decommissioning of the platform
  • Involved in all operational aspects of the shut down and decommissioning of a major oil producing platform
  • Worked until the period of being on the second last helicopter before the platform was abandoned for deconstruction

Production Technician at Janice F.P.U. (1998-09-01 – 2001-07-31)

Joined the Janice F.P.U. at South Shields during the conversion stage as Production Technician. Attended required courses and set up the Control Room in readiness for sail out.

  • Wrote and reviewed start up and operating procedures
  • Devised and set up a Process and Control Inhibit Monitoring System
  • Set up a Fire and Gas Inhibit Monitoring System
  • Worked in the Aberdeen office on Emergency Procedures
  • Set up a Process Isolation course for all operations Personnel
  • Alternated between the Control Room and Field as required

Lead Operations Technician at Maersk Curlew F.P.S.O. (1997-06-01 – 1998-09-30)

Joined the Maersk Curlew F.P.S.O. during the commissioning stage as Lead Operations Technician.

  • Attended all relevant courses required for the position
  • Wrote and reviewed operating procedures prior to sail out in September 1997
  • Operated in the field and Control Room during commissioning, first oil and gas compression start-up

Multi-Skilled Production Technician at Trafalgar House Offshore Services (1995-07-01 – 1997-06-30)

Joined Trafalgar House Offshore Services as a Multi-Skilled Production Technician on the BP Harding jack up Production and Drilling Platform in Norway prior to the wet-tow for commissioning.

  • Outside production and control room duties
  • Using an ABB CMSS System

Trainee Multi-Skilled Operations Technician at Exxon Chemical (1984-05-01 – 1995-06-30)

Joined Exxon Chemical at the Fife Ethylene Plant, Mossmorran, Fife as a Trainee Multi-Skilled Operations Technician. First year spent in training centre learning Ethylene Production Process, Electrical, Instrument, Machinery and Metals skills.

  • Punch listing and commissioning of the Cold Ends Section of the plant
  • Based at Braefoot Bay Marine Terminal for two years learning and operating ship loading post, field technician post and control room using TDC 2000 & PMX multi-screen consoles
  • Transferred back to Mossmorran to learn Sulphinol and Feed Treatment, Furnaces, Refrigeration, Boilers & Demin Water, Fractionation, Quench and Compression, Waste Water and the Furnace Console
  • Field sampling of various process streams and laboratory analysis work
  • Worked 4 days on, 4 days off, 12 hour shifts for 24 weeks, then 39 hour week for 6 weeks in the maintenance department

Process Operator at Glaxochem Ltd (1979-02-01 – 1984-04-30)

Joined Glaxochem Ltd, Montrose as a Process Operator. Worked in the following departments - Steroid Production, Solvent Recovery, Cephalexin and Fine Chemicals Departments.

  • High degree of cleanliness required as Quality Control was very strict since these were Final Stages Products
  • Safety was a very high priority as highly flammable solvents, bottled gases and acids were used in production

Fire Ground Support Staff at Offshore Fire Training Centre (1978-01-01 – 1979-02-28)

Employed as Fire Ground Support Staff at the Offshore Fire Training Centre, Montrose.

  • Setting up of fire ground exercises
  • Assisting instructors during exercises

Junior Electrical Mechanic / Leading Control Electrical Mechanic at Royal Navy (1971-11-01 – 1977-06-30)

Joined Royal Navy as Junior Electrical Mechanic. Left Royal Navy as Leading Control Electrical Mechanic.

  • Worked on Missile Guidance Systems
  • Broadcast Systems
  • D C Generation & Distribution
  • Navigation and General Electrical Fault Finding & Maintenance

Education

– Montrose Academy (1968-01-01 – 1971-06-30)

Reviews