Skip to main content
Ayaz Baig

Ayaz Baig

Experienced – Lead Mechanical Engineer

Talent
LondonMember since October 10, 2026
Reliability-Centered Maintenance (RCM)Asset Management
·

Hire this person

Send a job offer directly to this candidate

Reliability-Centered Maintenance (RCM)Asset Management

About

Senior Maintenance & Reliability Professional with over 28 years of distinguished experience across the Oil Refining, Petrochemical, Fertilizer, and Chemical sectors. A subject matter expert in Asset Management and Integrity within high-hazard, COMAH-regulated environments. Proven track record in leading large-scale commissioning, brownfield construction, and plant revamps in collaboration with global EPC contractors and OEMs.

Expert in implementing Reliability-Centered Maintenance (RCM), defect elimination, and optimization initiatives aligned with international safety standards. A strategic leader of multicultural teams, dedicated to delivering high-performance engineering solutions that maximize Asset Availability and operational excellence. Currently part of the Asset Management function at OQ RPI & Plastics in Sohar, Oman, delivering high-value maintenance and reliability support across complex processing units.

Experience

Lead Engineer Asset Management – OQ Central Department at OQ Refineries & Petroleum Industries Company (OQ RPI & P) (2025-05 – Present)

At present involves in following.

  • Delivering high level technical & strategic support for critical mechanical interventions, across refineries and petrochemical maintenance field units.
  • Developing a Maintenance Strategic Sourcing framework to standardize Mechanical Maintenance delivery across all OQ Oman facilities, optimizing Asset Availability and service-level consistency.
  • Implementing a complex-wide Lubrication Rationalization project to consolidate OEM grades, ensuring 100% lubricant availability and asset reliability while maximizing cost effectiveness through inventory optimization.
  • Review and Aligning Spare Parts Inventory with optimal stock levels to maximize Asset Availability while minimizing financial carrying costs.
  • Reviewing Mechanical Operating Procedures (SOP) to ensure alignment with modern safety and Maintainability standards.
  • To ensure Reliability-Cantered PM, optimizing critical Preventive Maintenance schedules to improve system reliability and reduce unplanned downtime.
  • Systematizing toolroom infrastructure across OQ RPI&P to enhance Mean Time to Repair (MTTR) through improved logistical readiness.
  • Standardizing specialized maintenance tooling details to ensure cross-complex availability for critical path activities.

Team Lead Maintenance – OQ Polymer Unit at OQ Refineries & Petroleum Industries Company (OQ RPI & P) (2023-06 – 2025-04)

To provide a safe and reliable, plant operation with minimum down time. I was involved to carry out Routine PMs and CMs thru a team of supervisors & technicians, at 03 lines of poly propylene units. This also includes maintenance overhauling of M/s Coperion-Extruder & Pelletizer machines with M/s RENK & Flender-Gearboxes. M/s Zeppelin Rotary Feeders, M/s Burckhardt reciprocating compressors, M/s Hofer (Neuman Esser) N2 high pressure Diaphragm compressor, M/s AERZEN - Pellet conveying Screw compressors, M/s Sundyne-Recycle Gas (Centrifugal) Compressor and multiple centrifugal pumps including Brayen and Lobb (SPX) Catalyst pumps.

Sulzer

Pumps

  • TAM & SDs: Attended multiple SDs & 02 TAMs.

Team Lead Maintenance – OQ Sohar Refinery at OQ Refineries & Petroleum Industries Company (OQ RPI & P) (2015-10 – 2023-04)

My core activities were to provide safe & reliable maintenance services for a reliable plant operation with a minimum downtime. I was involved in Routine PMs and CMs activities thru a team of supervisors & technicians. This Refinery processes heavy crude oil, & its units include CDU, VDU, DCU, HCU, ISOM, HGU and SRU.

Also, involved for the same refinery’s construction and commission / startup support. Major activities include HGU Steam Reformer Catalyst tubes and convection steam coil replacement. DCU coke drum skirt’s external crack repairs, coke furnace coils’ periodic pigging activity.

CDU furnaces Radiant & Convention tubes replacement, HCU reactor catalyst replacement. Uty Boiler firebox burner modification & internal refractory repair.

  • TAM & SDs: Experienced Multiple SDs and 02 TAMs.

Unit Manager Maintenance – FFC Bin Qaim Plant, Karachi at FAUJI FERTILIZER BIN QASIM LTD (FFC) (1997-07 – 2008-02)

Formerly known as FFBL, located near Karachi, Pakistan. This complex consists of an Old 1965 built relocated Bechtel Ammonia plant, new STEMI carbon Urea plant and M/s Jacob designed DAP plant. Joined FFC-BQ as trainee engineer and remained involved in its construction and commission supervision support.

  • Primary Reformer revamp with catalyst tubes as well as convection section coils /bank replacement.
  • Ammonia converter basket replacement
  • Secondary Reformer refractory replacement,
  • Waste heat Boilers replacement
  • TAM & SDs: Attended Multiple TAMs & multiple SDs.

Unit Manager Maintenance – FFC Bin Qaim Plant, Karachi at FAUJI FERTILIZER BIN QASIM LTD (FFC) (2011-07 – 2015-07)

Formerly known as FFBL, located near Karachi, Pakistan. This complex consists of an Old 1965 built relocated Bechtel Ammonia plant, new STEMI carbon Urea plant and M/s Jacob designed DAP plant. Joined FFC-BQ as trainee engineer and remained involved in its construction and commission supervision support.

  • Primary Reformer revamp with catalyst tubes as well as convection section coils /bank replacement.
  • Ammonia converter basket replacement
  • Secondary Reformer refractory replacement,
  • Waste heat Boilers replacement
  • TAM & SDs: Attended Multiple TAMs & multiple SDs.

Unit Manager Mechanical at Pakistan Maroc Phosphore S.A. (2008-03 – 2011-06)

DEPUTATION at Josf Lafar - MOROCCO. Deputed for more than 03 years in Pakistan Maroc Phosphore, S.A is a Joint venture of OCP Group Morocco and FFC Pakistan. It comprises M/s MECS, USA designed Sulfuric Acid &

• M/s Jacob designed Phosphoric Acid Plants. Have contribution in construction and commissioning support for Sulfuric &

• Phosphoric acid plant – Developed the Mechanical Maintenance team. Have in depth experience of maintenance of Sulfuric &

• Phosphoric acid plants, Sea water basin, Sulfuric &

• Phosphoric acid supply lines, Slurry pumps, Sulfur TANKS, Phosphoric acid axial flow centrifugal reactor pumps, agitators, phosphoric rock storage.

  • TAM & SDs: Attended 01 TAMs, multiple planned and un-planned SDs

Construction Engineer at VIP Contractor (1994-11 – 1995-04)

Worked as Project Construction and commissioning of Hamdard (WAQF) Pakistan herbal product manufacturing plant.

Construction Engineer at VIP Contractor (1996-07 – 1997-04)

Worked as Project Construction and commissioning of Hamdard (WAQF) Pakistan herbal product manufacturing plant.

TRAINEE ENGINEER QA at TOYOTA IMC-Pakistan (1995-05 – 1996-05)

Worked as trainee QC Engineer in Toyota Car assembly plant Pakistan.

Education

B.E. in Mechanical – NED University of Engg. & Tech. Karachi (1994)

Skills

ExperiencedLead Mechanical Engineer

Reviews