Jordan Jarvie
OFFSHORE ROPE ACCESS TECHNICIAN | IRATA L1
Hire this person
Send a job offer directly to this candidate
About
Time-served formwork carpenter and structural tradesman with 10 years' continuous experience on high-tempo civil, commercial and rail construction projects across the UK and Australia, now IRATA Level 1 qualified and OPITO offshore-compliant (BOSIET w/ CA-EBS, MIST). Proven record delivering structural fit-out, shuttering, steel fixing and concrete works to tight tolerances under strict safety controls, including confined-space and elevated-structure environments. Accustomed to 11-12 hour shifts, night rotations and remote/FIFO-style postings with minimal supervision.
Seeking to transition into an entry-level Offshore Rope Access Technician role on North Sea installations, bringing proven height-safety discipline and structural trade skill to a rope access crew.
Experience
Formworker — Shuttering at Statom Group (2026-05 – Present)
- Forming and stripping PERI wall systems, slab edges and box-outs on a live, access-restricted secure site — working to strict permit and safety controls.
- Maintaining structural accuracy and finish quality under continuous inspection conditions.
Formworker at Trimlyon Construction (2025-01 – 2026-03)
- Structural formwork on a major bridge upgrade — forming and stripping headstocks, assembling elevated walkways over water, decks and parapets/barriers.
- Completed a month-long night-shift rotation on live structural works — sustained output and safety discipline in low-visibility, elevated conditions.
Shuttering Joiner / Formworker at KMBD Construction (2024-08 – 2024-12)
- Structural formwork on two lift shafts as part of a live railway upgrade — PERI shutters and conventional formwork to structural concrete.
- 11-hour shifts including weekend working to hold the project programme on a safety-critical, operational rail site.
Formworker at Zoomwave Construction (2023-01 – 2024-08)
- Structural formwork across multiple underground and surface work sites on a major infrastructure project (Albert St, Boggo Road, Woolloongabba).
- Forming structural walls (timber/ply and PERI systems), setting up decks for pour, and supporting concrete placement and steel fixing — underground and surface environments with strict access and safety controls.
Joiner at Advance Construction (2022-01 – 2022-12)
- General structural/site joinery: shuttering foundations, erecting site hoarding/fencing, structural internal fit-out.
Formworker at SVG Construction (2021-01 – 2021-12)
- Full-cycle structural formwork on a 16-storey apartment tower, start to finish — jump-form system, suspended decks, walls and columns at height.
- Consistent, efficient delivery on a high-rise programme with continuous elevated-structure work.
Formworker / Concreter at Non Stop Group (2020-02 – 2020-12)
- Structural formwork, steel fixing and concrete placement across footpaths, culvert bridges, curved retaining walls, exposed driveways, slabs and structural walls on a major civil project.
- Worked in a 4-man crew where every member carried full structural and safety accountability — output held to a consistently high standard.
Formworker at Corrib Formwork (2019-07 – 2019-11)
- Erecting and stripping timber/ply columns, edge board and structural bracing on a commercial site — 12-hour shifts.
Formworker at KFC Construction (2019-04 – 2019-07)
- First hands-on concrete placement experience — forming, pouring and finishing structural walls and suspended decks on civil/residential sites using bull float and edging tools.
Formworker at Mid City Group / Westconnex (2018-11 – 2019-04)
- Structural formwork on the M4/M5 Westconnex motorway tunnel project — forming pits, kerb and gutter in a live tunnel environment.
Apprentice Fitter at Pride Shopfitting (2015-06 – 2018-09)
- Time-served apprenticeship in structural fit-out: counters, showcases, display units, shopfronts, floor coverings, fixtures and doors.
Education
SVQ 3 in Formwork Carpentry