Joseph Raynard
Post Contracts Manager
Hire this person
Send a job offer directly to this candidate
About
Experienced Post contracts manager in traditional building and timber framed housing construction.
Experience
Post Contracts Manager at Seddon Construction (2024-04 – Present)
- Responsible for reported defect inspections which are recorded on Clixifix system, updating Clixifix when possible
- Prehandover reporting before keys are exchanged with the client
- End of twelve month defect reporting and requesting making good certificates from the client
- Responsible for NHBC, LABC resolution attendances on behalf of the company
- Assisting Aftercare in closing down issues, at the time of writing there are only 97 open defects across eight live sites under warranty
New Home Quality Inspector at Eccleston Homes (2023-03 – 2024-04)
- Responsible for pre handover inspections to various sites across the Northwest of England
- Assisting Aftercare with home visits for defect reporting and resolution with various contractors
- Responsible for attending NHBC, LABC resolutions with home owners at times when required
- Responsible for quality assurance visits to eight on going sites for the company
Assistant Site Manager at SEP Construction (2021-09 – 2023-03)
Employed with SEP Construction since 2021-04-01. Responsible for constructing, programming purchasing materials, health and safety on site at Southport Road development Southport. The site consists of twenty five three and four bedroom properties with eleven one bedroom apartments. The project is a mixed site for two clients consisting of Onward Homes and Shape Engineering.
Assistant Site Manager at Bellway Homes NW (2017-04 – 2020-12)
- Comfortable with a fast paced job and able to handle the workload whilst ensuring quality standards do not drop
- Responsible for constructing, programming, purchasing materials, health and safety, customer demonstrations and customer care on site
- Monitoring programmes to ensure only one trade per plot
- Completed nine properties before leaving Bellway, leaving two remaining at CML stage 2020-12-23
Assistant Site Manager at Countryside Properties (2011-08 – 2017-04)
Employed with Countryside Properties from August 2011 to 2017-04-03. Trained in the construction of timber framed units with company training and guidance from the site manager. On site at Norris Green Village. Training included constructing units, programming works, health and safety on site, site welfare, first aid, purchasing and customer care.
Norris Green
Village was a development of over 900 units which consisted of two, three, four and three story units for sale and housing association. Involved on this site for three years on and off. Also involved on Stephenson Grove Rainhill, Queen Mary and Gateacre Park. Good knowledge of timber frame units as involved in a lot of their construction at great pace. Completed the four units at sales within ten weeks. Achieved the lowest customer care inspection score on a plot with 13 items of paint only on a three bedroom unit.
Education
– Campion School Liverpool (1980 – 1986)