Skip to main content

Neil PATRICK McINERNEY

PROJECT Manager

Talent
Daffodil Farm, Quarnford, Buxton, SK17 0TEMember since September 28, 2026
Project ManagementMS ProjectCost ControlRisk ManagementStakeholder ManagementNEC3 Contract ManagementSAP SystemCatiaMechanical EngineeringMethod StatementsRisk AssessmentsHAZOP StudiesBudget ControlProcurementDesign ReviewsExcel
·

Hire this person

Send a job offer directly to this candidate

Project ManagementMS ProjectCost ControlRisk ManagementStakeholder Management

About

Following my latest career within the Pharmaceutical industry and my BEng (Hons) in mechanical engineering, I now feel that with my extensive industrial experience I now have the ideal basis in which I can now plan for a long-term career. My diverse engineering knowledge and background is what I feel is my strongest point for any industry, allowing me to draw information from all areas. I currently have recognised status within the ImechE, but I am not yet a full member.

This is my next goal for completion, to become a full member of the chartered institute. Previously held SC clearance which lapsed in 2021.

Experience

PROJECT Manager - Rolls Royce - Home working & Rolls Royce Deby Sites

(2023-06)

As a project manager, I am responsible for each project from cradle to grave Overseeing the design, installations, and commissioning through to final handover.

  • Utilised project management MS project to plan, manage and track 5-10 projects simultaneously
  • Define the project proposals and determined time, quality, safety and costs to scope
  • Utilising the integral flow processes to plan and delivery each project
  • Managed the construction teams to ensure project completed with 100% client satisfaction
  • Monitor progress across each site to ensure adherence to design, scope and costs
  • Logged and utilised excel spreadsheets data, providing information for power point presentation for progress meetings

PROJECT Manager - GSK - Home working & GSK Ulverston Site

(2020-06 - 2023-06)

As a project manager, I am responsible for each project from cradle to grave Overseeing the design, installations and commissioning through to final handover. Stakeholder management is key to keep each project on track to program and budget. The site is currently being refurbishing and down sized to make the site more efficient. Projects values vary from small 50k – 1.5M.

  • Good team player Co-ordinating tasks between the project team, design Teams and the site contractors to ensure projects are managed effectively and safely
  • Being involved in the preparation of project documents such as scope documents project estimates, change control, P6 programs and costs reporting for each project
  • Familiar with NEC3 type contracts
  • Support in raising of Purchase orders for each project utilising SAP system

PROJECT Manager - CH2ML - Rolls Royce Derby

(2015-11 - 2020-11)

As part of the infrastructure project team which is currently supporting the Rolls Royce site licences upgrades. I have been managing projects for security upgrades, welfare facility upgrades, oversee the design, build and install of a new change room facility for one of the active workshops another large project was the chemical transfer pipe work project which interfaces between a new build and existing facility.

  • Key task on Rolls Royce site is the Ensure safe Delivery of each construction project to an approved scope of work which is set out within client specifications
  • Managing the costs and reporting progress to ensure safe delivery correct quality grade all while keeping to the committed spend profile
  • Each project is managed and controlled through the Rolls Royce project process

PROJECT MANAGER - Morson International - Sellafield Site

(2011-08 - 2015-10)

My current role is base at Sellafield site managing various projects across site. A couple of large projects which I have over seen are electric overhead crane refurbishment project, B259 ventilation refurbishment project this within separation area.

  • Responsibilities include the design & plant delivery by Project Engineers, contractors, co-ordinating activities between the design , project, operational & commissioning teams
  • Being involved in the preparation of project documents including Project planning, cost control, risk management, method statements, risk assessments, scope documents Quality plans and SSOW
  • Part of the time is working alongside contract teams to ensure each project is managed effectively and safely on time and budget
  • Input into the procurement of items for each project when required participate in Hazops, design reviews
  • Assist in the life time planning along with project status updates via weekly reporting to head of projects
  • NEC3 contract management for major projects ranging from 1.2-4.5 million pounds ensure targets are met on time and budget with no issues
  • Each of the Projects have followed the sellafield gated process

PROJECT MANAGER - Priory Design - Trawsfynydd, Wales

(2011-03 - 2011-07)

Project management and engineering work at trawsfynydd North Wales Magnox site. Co-ordinating tasks between design Team and Traws on site contractors ensure contractors are managed effectively and safe.

  • Being involved in the preparation of project documents such as method statements, risk assessments, scope of works, quality plans, Hazops & pre job briefs
  • Assist in the life time planning along with project progress reporting

PROJECT ENGINEER - National Nuclear Laboratory - Sellafield/Risley

(2010-08 - 2011-03)

Project management and engineering with NNL based at Sellafield, Overseeing the design and installations of new equipment into the B13 building and also being involved in some a number of decommissioning tasks. My current role is of a similar one to that previously held at BTC & B38. The tasks are to meet current deadline and budgets. Most of the work involves me working on multiple sites and with multiple contractors.

  • Writing technical specifications including scopes documents, technical specs, method statements, risk assessments and plant modification proposals
  • Checking drawings against material list & the design

MECHANICAL ENGINEER - Nexia Solutions - Sellafield/Risley

(2008-04 - 2009-02)

As part of the project team my role as mechanical engineer with Nexia Solution based at Sellafield, Overseeing the design and installations of new equipment into the BTC building. My current role is of a similar one to that previously held at B38 although encompassing more responsibility due to smaller teams and tighter time constraints. The building is currently refurbishing the laboratories with new equipment; there are several location within its active areas with all being run simultaneously.

The tasks are to meet current deadline and budgets. Most of the work involves me working on multiple sites and with multiple contractors.

  • Writing technical specifications including scopes of work, technical specs, method statements, plant modification proposals
  • Checking design drawings, prepare material list and procurement of materials

PROJECT ENGINEER - British Nuclear Group (BNFL) - Sellafield/Risley

(2004-01 - 2008-04)

Project management and engineering at Sellafield, Risley on decommissioning projects mainly for B38 and associated buildings. Excellent working knowledge of working within the active area of B38 and associated buildings and controlling projects on a day to day basis. Currently working on the installation of new and refurbished services within B38, including guaranteed compressed air systems, Nitrogen systems and cooling water.

These project have been large modular type installations involving vast runs of pipe work and control systems.

  • Manufacturing of complex pipe runs, full systems, large testing rigs and specialist equipment
  • Excavation of contaminated land and the controlled installation or new ground works, this included the removal and protection of old services running through the site
  • Continually helping to develop the NTWP programs, monthly programs, basis of estimates and scoping documentation for new and up and coming work
  • Good knowledge of BNFL working procedures and standards from design to execution
  • Good knowledge of the FEL process, risk management, man management, budget controlling, Strategy management and implementation
  • Excellent experience of working between sites and progressing more than one work stream at once
  • Experience in writing risk assessments, method statements, Attending HAZOP studies, Felgate reviews, design reviews weekly planning meetings

DESIGN ENGINEER - INBIS GROUP PLC - Bradden Industrial Estate, Isle of Man

(2001-01 - 2004-01)

My basic experience within Airbus UK projects is involved in working on A380 with parts such as the ribs, intercostals, spreader plates and associated items. Other design work for BAE Systems projects have included Eurofighter ECS systems, Flight Test Systems, including temperature sensors and associated brackets, Pipes, wiring and connectors. Most recently I have been involved with lightning strike equipment and systems.

The Nimrod MRA4 project provided experience on designs of hydraulic pipe work & there installations and the emergency crew escape system. Composite design experience has been applied on project to investigate prototype door types for railway carriages. All projects utilising Catia system.

Design work has covered work from conception to production with coverage of most if not all components within a modern day aircraft.

ENGINEERING MANAGER - Fish Engineering - Gateway

(1999-01 - 2000-01)