Vakhtang Modebadze
Engineering and Project Management professional
Hire this person
Send a job offer directly to this candidate
About
Engineering and Project Management professional with 16+ years of experience delivering high-voltage transmission, substation, industrial, and infrastructure projects. Experienced in project supervision, construction management, stakeholder coordination, contract administration, and HSE compliance. Proven track record of delivering donor-funded and utility-scale projects safely, on schedule, and within budget.
Holds
Bachelor's and Master's degrees in Engineering and Management, with additional business management training in the USA.
Experience
Substation and OHL Expert/Site Supervisor at Fichtner Georgia (2023-01 – Present)
I am actively involved in the design phase of projects, reviewing, commenting on, and approving design documentation to ensure compliance with project requirements, technical specifications, and applicable standards. My responsibilities include continuous on-site supervision of construction activities, monitoring contractors' and subcontractors' daily work, and ensuring that all activities are performed in accordance with approved designs, quality standards, and project schedules. I conduct site inspections, review and sign inspection records and related documentation, and verify that delivered equipment and materials comply with contractual and technical requirements.
I prepare daily progress reports, document site activities and observations, and communicate project status, issues, and recommendations to the Project Manager.
- 220kV SS “Ozurgeti” construction
- 220kV SS “Lajanuri” construction
- 500kV SS “Akhaltsikhe” extension
- 500kV OHL “Tskaltubo-Akhaltsikhe” construction
- 110kV OHL “Stori-New Telavi” construction
Maintenance Chief Engineer at ATC - Aerostructure Technologies Cyclone (2020-05 – 2022-12)
I was responsible for overseeing all preventive maintenance activities within the factory, including manufacturing machinery, HVAC systems, chillers, freezers, air compressors, medium- and low-voltage electrical distribution equipment, and diesel generators. My duties included developing and implementing preventive maintenance plans in accordance with manufacturers' recommendations and maintenance manuals, while ensuring their timely and effective execution. I was also responsible for preparing and managing the maintenance budget based on planned and completed maintenance activities.
In addition, I led the maintenance team, coordinated daily maintenance operations, ensured compliance with safety and operational standards, and provided regular performance and maintenance reports to senior management.
Senior Engineer at the Department of International project Planning ang Technical Supervision at Georgian State Electrosystem (GSE) (2010-09 – 2020-07)
During my employment with the Transmission Network Operator, I was responsible for managing and supervising the execution of electrical infrastructure projects, including the installation of high-voltage equipment in substations and the construction of lattice towers for overhead transmission lines. I also oversaw civil works associated with these projects, including the construction of concrete foundations for electrical equipment and steel structures. My responsibilities included preparing and maintaining weekly project progress reports using MS Project for senior management and contractors, while ensuring effective communication and strong working relationships among all stakeholders.
I provided on-site support during project implementation by coordinating teams, streamlining work processes, and actively participating in both civil and electrical construction activities. In addition, I assisted in the preparation of project scopes of work, engineering estimates, and the review of technical calculations and engineering drawings. I coordinated the development of operating single-line diagrams, equipment layouts, schematics, wiring diagrams, and other project deliverables to ensure compliance with project requirements and industry standards.
Through effective leadership and project management, I successfully delivered several major projects on schedule, including:
- Kakheti High Voltage grid development project, (consultant FICHTNER, Donor funded).
- CSG1 and PSG1 (BP pump stations) grid power supply project. (subcontractor Worley Parson)
- 110kv OHL “Khudoni” rehabilitation project (contractor Salini Impregilo)
- 35kv S/S “Shindisi” rehabilitation project
- 220/110kv S/S ”Teleti” construction project
Education
Business Management Certificate in Business Management – Penn Foster Career School (Scranton, PA, USA) (2009-07 – 2010-05)
Master’s degree in Power engineering economics management – Georgian Technical University (Tbilisi, Geo) (2006-09 – 2008-06)
Bachelor’s degree in Engineering Sciences – Georgian Technical University (Tbilisi, Geo) (2002-09 – 2006-09)

