Skip to main content
Mawume Buatsi

Mawume Buatsi

Power Plant Operations and Construction

Talent
AccraMember since June 16, 2026
·

Hire this person

Send a job offer directly to this candidate

Experience

Construction Manager — Genser Energy Ghana Limited, Western Region, Ghana Oct 2025 – Present

Chirano Integrated Power Programme: 22 MW CCGT expansion, 161 kV outdoor substation, and 11.7 km 161 kV overhead transmission line.

  • Direct on-site construction of three concurrent projects converting three simple-cycle Solar Titan T130 gas turbines to combined cycle via heat recovery steam generators and a 22 MW steam turbine, lifting plant gross output and integrating with existing generation.
  • Manage multiple EPC contractors and subcontractors across civil, mechanical, electrical, instrumentation, and transmission line disciplines, with weekly executive reporting on schedule, cost, quality, and risk.
  • Develop and maintain detailed construction schedules using critical path methodology; track variance and re-baseline as required to protect commissioning milestones.
  • Administer EPC and supply contracts, including non-conformance management, design-change governance, payment certification, and claims mitigation.
  • Serve as primary liaison with GridCo (utility interconnection), ECG, Asante Gold/Bibiani, the Forestry Commission, and local authorities, securing crossings, way-leaves, and right-of-way clearance for the transmission corridor.
  • Enforce HSE programme aligned to OSHA, NESC, and ISO 45001, including high-voltage safety protocols, energised line work procedures, toolbox talks, and hazard assessments — currently maintaining a zero-incident record across the programme.
  • Coordinate quality assurance and quality control: review contractor submittals, witness critical equipment testing, manage RFIs, and oversee as-built documentation and commissioning hand-over to operations.

Plant Manager — Genser Energy Ghana Limited, Chirano (August 2024 – June 2025) & Edikan (July 2025 – September 2025) Plants, Ghana

Aug 2024 – Sep 2025

Responsibility for 33 MW simple-cycle gas turbine plants supplying captive power to Asante Gold Chirano and Perseus Mining Edikan gold mines.

  • Held full operational, HSE, and budget accountability for two thermal power plants totalling 66 MW of installed capacity, ensuring continuous power supply under client power purchase agreements.
  • Led plant teams covering operations, maintenance, reliability, procurement, and HSE; conducted performance appraisals, training, and rotational shift planning.
  • Implemented proactive maintenance programmes through CMMS-driven planning and scheduling, maximising plant uptime and equipment reliability across Solar Titan T130 gas turbine fleets.
  • Developed and managed plant operating budgets, tracking expenditure, forecasting variances, and identifying cost-saving and energy-efficiency opportunities.
  • Approved permits-to-work and chaired investigations into operational incidents, working with the Reliability Team on root cause failure analysis and corrective and preventive actions.
  • Managed client relationships, regulatory reporting, and engagement with local communities, the Minerals Commission, and environmental compliance authorities.
  • Supported EPC project closeout activities — punch list resolution, warranty management, red-line and as-built drawing review, and QA/QC sign-off.

Operations Superintendent — Genser Energy Ghana Limited, Chirano Plant, Ghana Sep 2023 – Jul 2024

Operations leadership for the newly commissioned 33 MW (2× 16.5 MW Solar Titan T130) simple-cycle plant supplying Asante Gold Chirano.

  • Led 24/7 shift operations of gas turbine generation assets, including start-up, synchronisation, loading, and load-following to meet client demand profiles.
  • Acted as Plant Manager during absences; reviewed and recommended permits-to-work for approval and maintained regulatory documentation.
  • Drove process safety compliance — Process Safety Information (P&IDs, safe operating limits), Process Hazard Analysis, Management of Change, Mechanical Integrity, and Pre-Startup Safety Reviews.
  • Partnered with the Reliability Team on predictive and preventive maintenance to eliminate catastrophic failures and reduce unplanned outages.
  • Developed Standard Operating Procedures, emergency response plans, and operator training programmes; performed process troubleshooting to resolve production bottlenecks.

Construction Superintendent — Genser Energy Ghana Limited, Chirano Plant, Ghana Nov 2022 – Sep 2023

Construction of the 33 MW Chirano simple-cycle plant (2× 16.5 MW Solar Titan T130) for Asante Gold Chirano Gold Mines.

  • Planned and directed all subcontractor construction activities through to mechanical completion and commissioning, delivering within specification, schedule, and budget.
  • Studied specifications, contracts, and drawings to develop construction procedures covering safety, quality, staffing, and subcontractor requirements for each phase.
  • Inspected works in progress to ensure workmanship and materials conformed to specifications; clarified design discrepancies with engineering; analysed and resolved site problems.
  • Enforced Genser Energy's HSE Management Plan, established a safety-first climate, and approved subcontractor work-completion submissions for payment.
  • Reviewed construction progress reports, daily punch lists, materials usage, and cost data; adjusted construction schedules as needed to maintain commissioning milestones.

Operations Superintendent — Genser Energy Burkina Faso S.A., Bombore, Burkina Faso May 2022 – Nov 2022

International secondment: 14 MW diesel-powered thermal power plant (expandable to 21 MW) at the Bombore gold mine.

  • Led operations team and assisted Plant Manager in establishing 24/7 operations of the new plant, including SOP development, operator training, and emergency response planning.
  • Reviewed Authorised-for-Construction drawings, P&IDs, and commissioning checklists; managed punch list closeout and warranty issues post-commissioning.
  • Established safety protocols, environmental compliance procedures, and process optimisation initiatives to drive energy efficiency and cost reduction.
  • Acted as Plant Manager during absences and maintained regulatory documentation in line with Burkinabé regulations.

Operations Superintendent — Genser Energy Ghana Limited, Chirano Power Plant, Ghana Oct 2021 – Nov 2022

Operations of an existing 30 MW IGCC plant supplying Chirano Gold Mines, prior to the 33 MW simple-cycle expansion.

  • Provided operational leadership for the engineers and mechanics team, ensuring safe, reliable, and efficient power generation under the client PPA.
  • Investigated operational incidents with the Reliability Team using Root Cause Failure Analysis; implemented corrective and preventive actions.
  • Managed Process Safety Information, Management of Change, and Pre-Startup Safety Review compliance.
  • Contributed to procurement and logistics agreements for spares and consumables, ensuring availability of materials for planned outages and mandatory inspections.
  • Supervised the Operations Team, implemented training programmes, and coordinated rotational shift scheduling.

Construction Superintendent (Acting) — Genser Energy Ghana Limited, Edikan, Ghana Dec 2020 – Aug 2021

Construction of the 33 MW Edikan simple-cycle plant (2× 16.5 MW Solar Titan T130) for Perseus Mining Edikan Gold Mines.

  • Directed subcontractor construction activities, planning each phase against contract specifications, drawings, schedule, safety, quality, and resourcing requirements.
  • Enforced HSE management plan and client (GSWL) safety policies, including high-voltage safety, LOTO, and permit-to-work systems.
  • Reviewed and approved subcontractor work for payment; clarified design discrepancies with engineering; supported procurement on materials inspection and quality acceptance.
  • Delivered the project within specification and budget, contributing to the company's track record of on-time, on-budget power plant delivery.

Construction Superintendent (Acting) — Genser Energy Ghana Limited, Wassa, Ghana Dec 2019 – Nov 2020

Construction of the 33 MW Wassa simple-cycle plant (2× 16.5 MW Solar Titan T130) for Golden Star Wassa Limited gold mines.

  • Planned and directed construction activities of subcontractors and supervisors through mechanical completion and pre-commissioning.
  • Studied specifications, contracts, and drawings to plan procedures covering schedule, safety, quality, staffing, and subcontractor requirements.
  • Enforced HSE Management Plan and GSWL safety policies on site; inspected workmanship and materials for conformance to specifications.
  • Reviewed construction progress reports, daily punch lists, and cost tracking; approved subcontractor payment applications.

Shift Charge Engineer — Genser Energy Ghana Limited, Damang, Ghana Nov 2016 – Nov 2019

27.5 MW simple-cycle gas turbine power plant supplying Damang Gold Mine.

  • Acted as Senior Authorised / Control Person under the safety rules — switching, isolation, and the issuance and cancellation of permits-to-work and safety documents.
  • Supervised operating staff to ensure plant operation aligned with agreed operating procedures and the highest mechanical and electrical safety standards.
  • Monitored and operated the power plant in accordance with prudent industry practice; logged operational data and prepared incident reports.
  • Supported development and updating of as-built drawings, P&IDs, and operating manuals; provided input on procurement of consumables and spares.

Project Engineer — Mechanical — Genser Energy Ghana Limited, Tarkwa, Ghana Jan 2016 – Sep 2016

30 MW simple-cycle gas turbine power plant project, Tarkwa.

  • Designed and modified piping for fuel forwarding, fuel unloading, plant air, and fire suppression systems.
  • Supervised all piping and mechanical installation works during construction in line with manufacturers' recommendations.
  • Coordinated with subcontractors on tools, equipment, and deadlines; supported procurement on sourcing of mechanical equipment.
  • Prepared weekly and monthly project progress reports for management.

Shift Charge Engineer — Genser Energy Ghana Limited, Unilever Tema CHP, Ghana Sep 2012 – Dec 2015

5.5 MW combined heat and power (cogeneration) plant supplying steam and electricity to Unilever Ghana.

  • Operated and monitored the CHP plant, acting as Senior Authorised / Control Person for switching, isolation, and permit-to-work issuance under the safety rules.
  • Supported development of as-built drawings, P&IDs, and operating manuals reflecting current plant condition.
  • Provided technical input to Purchase and Service Order Agreements for operations consumables and spares.
  • Maintained the highest mechanical and electrical safety standards across all shift activities and prepared incident and operations reports.

Assistant Project Engineer (Acting) — Genser Energy Ghana Limited, Chirano IGCC, Ghana Feb 2014 – Dec 2014

30 MW Integrated Gasification Combined Cycle (IGCC) power plant — concurrent assignment during shift charge engineer role.

  • Supervised mechanical installation works at the cooling tower, steam turbine generator, and heat recovery steam generator sections.
  • Supervised tube expansion works on the heat recovery steam generators.
  • Produced mechanical component and pipe layout drawings using AutoCAD and SolidWorks; prepared bills of material and payment certificates.
  • Negotiated subcontractor contracts and supervised construction works on site.

Graduate Trainee Engineer — Genser Energy Ghana Limited, Unilever Tema CHP, Ghana Oct 2011 – Aug 2012

  • Supervised site activities and ensured equipment installation was completed safely and on schedule.
  • Took field readings during commissioning; monitored plant equipment during start-up and steady-state operation.
  • Executed shift charge engineer instructions during operations and undertook preventive and corrective maintenance on plant equipment.

Industrial Attachment Trainee — Akosombo Hydroelectric Power Station (VRA), Akosombo, Ghana Jun 2010 – Jul 2010

  • Eight-week industrial training covering hydroelectric turbines, compressors, and auxiliary equipment used in large-scale power generation; received testimonial on completion.

Education

Bachelor of Science (BSc) in Mechanical Engineering — Kwame Nkrumah University of Science and Technology, Kumasi, Ghana

Graduated Jun 2011

Relevant coursework: Thermodynamics, Thermofluids, Heat Transfer, Mechanical Design, Materials Engineering.

Microsoft Project Management Certification — Coursera, Online, Ongoing

Reviews