Bramansyah Badar Islami
Certified Procurement Officer | Sertifikat Ahli Kepabeanan
Sewa orang ini
Kirim tawaran pekerjaan langsung ke kandidat ini
Tentang
Purchasing supervisor with good in ordering process and project management, have 3 years experience in procurement function (vendor management and purchasing). Good in ordering activities such as, sourching strategy, estimated project cost, tender management, contract negotiation, and planning cost reducing. Has good project management from PT GESITS (Electric Vehicle Manufacture) to controlling progress project new models and evaluation project in supplier.
Mechanical engineering graduate with interest in supply chain management, design & manufacture, and renewable energy.
Pengalaman
Purchasing Supervisor at PT Inti Pantja Press Industri (2023-08 – Present)
PT Inti Pantja Press Industri (IPPI) is a company that operates in the automotive manufacturing sector, especially in the press and welding sector, IPPI is part of Astra Motor III (Asmo III).
- Responsible for the end to end ordering process in accordance with purchasing procedures (new assets and new product projects, repair and maintenance of building and machine, and consumables).
- Lead tender of new asset and new product project, and prepare a project cost breakdown estimate for the negotiation process with a value of more than 1 Billion.
- Responsible for sales and purchase cooperation contracts with suppliers including negotiating contracts for purchases over 500 million with a Service Level Agreement (SLA) of 14 working days.
- Planning activities Cost Reduction with spend analysis for consumables and spare parts succeeded in achieving a cost reduction of 172 million per month, and by estimating breakdown costs for new product and building projects succeeded in achieving a cost reduction of 20% per project from the estimated user request.
- Development of E-Procurement Phase 1 to simplify routine purchases (Materials, components, consumables, bolts, nuts, office stationery) reduce 38% Service Level Agreement (SLA) from 5.7 working days to 3.5 working days.
Procurement Staff at PT WIKA Industri Manufaktur (2022-06 – 2023-08)
PT WIKA Industri Manufaktur WIMA is a company engaged in assembling electric vehicles with the GESITS brand. WIMA is a subsidiary of PT Wijaya Karya.
- Make a purchase order from the PPIC team for the production needs of the Gesits G1 model for 1 month.
- Make a schedule for the delivery of components from suppliers for the production of the Gesits G1 model for 1 month.
- Monitoring the delivery of supplier components for the production of the Gesits G1 model for 1 month.
- Discussions with suppliers regarding process and delivery problems at suppliers.
- Review and negotiate price increases proposed by suppliers for components of the Gesits G1 model.
- Making Bill of Materials, prototypes and N3 for new three-wheeled products together with the engineering team and PPIC.
Final Project Program at PT. Ontiyus Karya Mulia (2020-10 – 2021-08)
PT Ontiyus Karya Mulia is a company engaged in manufacturing, especially casting and machining, The products such as household appliances and automotive components.
- Success planning and designing runner of cross-flow turbine, mold, and core of mold for manufacturing of sand casting in 2 month.
- Manufacturing molding and core of molding using simple tools and conventional machines in 7 months.
- Producing 3 runner of cross-flow turbine using sand casting method in 1 week.
- Conducted a three-point bending test of 15 specimens of cast material with a bending stress of 110 – 170 Mpa.
- Testing the power and torque of the runner by varying the water discharge and nozzle gate with power result of 150 – 250 rpm and a torque of 25 – 40 N.
Mechanic Internship at PT Arpeni Pratama Ocean Line Tbk. (2020-02 – 2020-03)
PT. APOL is a company engaged in shipping, especially shipping of coal that is sent to PLTU with national and international reach.
- Checking ship unloader which is done every 3 times a week, maintenance by giving grease to wire rope every day and replacement of the wire rope which is done every 2 months.
- Checking wheel loader which is done every 2 times a week, observation of maintenance by Caterpillar and giving oil every 1 months.
Pendidikan
S1 in Mechanical Engineering – Universitas Negeri Semarang (2017 – 2021)


