Lewati ke konten utama
Dullah Hafid

Dullah Hafid

Admin Site, Document Control, Progress Control

Talenta
BandungAnggota sejak 21 Juli 2026
Document ControlProgress Control
·

Sewa orang ini

Kirim tawaran pekerjaan langsung ke kandidat ini

Document ControlProgress Control

Tentang

Looking Project Construction Prepare Bidding Document for Styrofoam Factory at Cilegon City Coordination with project manager about Management site & pre_eliminary Site Project

Pengalaman

Admin Site, Document Control, Progress Control at PT. Kolega Dwi Semesta (2023-12 – Present)

  • Looking Project Construction
  • Prepare Bidding Document for Styrofoam Factory at Cilegon City
  • Coordination with project manager about Management site & pre_eliminary Site Project
  • Prepare & Handle Daily, Weekly, Monthly Report & Progress Report (Kurva-S)
  • Report to Operational Director

Marketing Project, Admin Project at PT. Sinar Bulan Teknologi Inovasi (2022-01 – 2023-11)

Project: Renovation Building House, Location: Dago Resort Bandung.

  • Looking Project Construction & Supplayer Material Building
  • Administrasi Site, Coordinator on site
  • Prepare & Handle Daily, Weekly, Monthly Report & Progress Report (Kurva-S)
  • Report to Director

Admin Site, Document Control, Progress Control at PT. Damanito Teknologi Rekatama (Management Consultan) (2017-02 – 2021-12)

Department: Technical Department. Project: Biodiesel & Pretreatment Factory 1500 tpd. Owner: PT. Johnlin Agro Raya, Tanah Bumbu Kalimantan Selatan (Johnlin Group).

  • Distribution All Document to Owner dan Maincont
  • Administrasi on site
  • Prepare & Handle Daily, Weekly, Monthly Report & Progress Report (Kurva-S)
  • Report to Project Manager

Admin Site & Progress Control at PT. Oversindo Services (Engineering, Procurement & Construction) (2014-08 – 2017-01)

Department: Technical Department.

  • GCNM Apartment Shangri-LA Sudirman Jakarta, Client: Hyundai E&C – NKE JO
  • LNG Tangguh Expansion (Train #3), Bintuni Papua, Client: CSTS
  • Banyu Urip (EPC-1) project, Exxon Mobil Cepu Limited EMCL, Cepu – Bojonegoro. Client: Tripatra – Samsung Consortium
  • Expansion of unloading area WWT, Weighing bridge, Pipe bridge – PT. Archroma Indonesia, Cilegon-Banten. Client & Consultant: PT. Archroma Indonesia – PT. Indo Swissatama (Consultant)
  • Prepare Bidding Document Project
  • Prepare Document Drawing
  • Administrasi & document control on site
  • Finally report to Site Project manager

Marketing Project & Document Control at PT. Daekyeong Plantec (Engineering & Construction) (2014-03 – 2014-08)

Department: Technical.

  • Aceh Palm Oil Plant (Pidie Jaya Aceh), Client: Hankook Boiler & Technology
  • CCP Roll Shop Wall (Steel Mill Plant), Client: KS_Posco Cilegon
  • Prepare Bidding Document Project
  • Prepare Document Drawing
  • Finally report to Technical Director

Administrasi & PPIC at PT. Cipta Dimensi Baja Nusantara (Engineering & Fabrication) (2013-10 – 2014-02)

Department: Technical.

  • Bandung Elctronic Center Building
  • Plaza Summarecon Bekasi
  • Gudang Pakan Ternak Balaraja
  • Summarecon bekasi
  • Prepare Estimate Steel Structure, part steel
  • Prepare Document Drawing
  • Finally Report to PPIC Manager

Pendidikan

DIII in Machine Technic – Politeknik Industri & Niaga Bandung (2002-09)

Machine Technic – STM Krakatau Steel Cilegon

– SMPN 3 Cilegon

Keterampilan

Admin SiteDocument ControlProgress Control

Ulasan