Geane Farias
Industrial Engineer | Continuous Improvement | Operational Excellence | Process Improvement
Hire this person
Send a job offer directly to this candidate
About
Industrial Engineer with hands-on experience in manufacturing, continuous improvement and process optimisation across chemical and food production environments. Experienced in Lean/5S implementation, root cause analysis, KPI and downtime analysis, process standardisation, visual management, material flow and practical shop-floor improvement. Proven experience developing SOPs and work instructions, leading structured improvement activities and working cross-functionally with Production, Quality, Maintenance, Engineering, EHS, Planning and Receiving.
Delivered measurable improvements including a 50% increase in an established production output target and approximately one hour of productive time recovered per shift through packaging-process redesign. Currently completing an MBA in Project Management.
Experience
Operations & Quality Support at SuperValu (2025-11 – Present)
Support daily operations in a food production environment with a focus on quality, process consistency, standardisation and operational efficiency.
- Developed clearer visual SOPs and work instructions, translating complex corporate product specifications into practical step-by-step standards for the operational team.
- Support employee training, inventory and material availability while identifying practical opportunities to improve workflow, workplace organisation and day-to-day processes.
Production Supervisor | Process & Continuous Improvement at Pulvitec Group - Pidilite (2021-07 – 2022-02)
Led and supported manufacturing operations with a strong focus on process performance, continuous improvement, equipment reliability and operational efficiency across multiple production lines.
- Monitored daily and hour-by-hour KPIs including planned versus actual output, productivity, downtime and causes of production losses; developed Excel reporting using formulas, VLOOKUP and charts to improve performance visibility.
- Analysed production capability with operators and process data, contributing to an increase in the established output target from 100 to 150 boxes per shift (50%).
- Worked cross-functionally with Production, Quality, Maintenance and Planning to investigate recurring process and equipment issues using 5 Why and Fishbone/Ishikawa and to follow corrective actions.
- Coordinated regular reviews with Maintenance covering work orders, downtime, recurring failures and lost production, supporting equipment-improvement and reliability decisions.
- Supported factory trials for an equipment automation improvement after extrusion, collecting operational observations, monitoring trial performance and providing process feedback to Engineering.
- Supported practical improvements involving material flow, production readiness, inventory accuracy, labour utilisation and workplace organisation.
- Supported non-conformance investigations and implementation of process changes, including updated work instructions, operator training and follow-up to sustain revised standards.
- Used Protheus/Microsiga ERP for production-order activities, material requisitions, stock checks and production planning support.
Production Team Leader | Continuous Improvement & Lean 5S at Pulvitec Group - Pidilite (2019-08 – 2021-07)
- Initiated and implemented a multi-area Lean 5S programme across Production, Laboratory, Receiving and Factory Administration, securing management approval and establishing visual standards, structured audits and 5W2H action tracking.
- Selected and trained six 5S facilitators and established weekly implementation audits followed by twice-monthly sustainment reviews, working with area leaders to identify and track improvement actions.
- Developed SOPs and work instructions from process observation through operator and Quality consultation, practical testing, management review, implementation and documented employee training.
- Created visual management standards including production-line identification, material locations, workstation organisation, floor demarcation, checklists and accessible machine-level work instructions.
- Improved material flow and production readiness by restructuring material requisition and staging practices, defining delivery windows and establishing a designated staging area.
- Reorganised packaging preparation across three production lines, recovering approximately one hour of productive time per shift; also introduced pre-weighing practices to improve material control and operator utilisation.
- Participated in the ISO 9001 internal audit team and collaborated with Production, Quality, Maintenance, Planning, EHS and Receiving to implement and sustain operational improvements.
Industrial Engineering Internship at Pulvitec Group - Pidilite (2016-12 – 2018-05)
- Supported manufacturing and continuous improvement activities including 5S, inventory control, material requisitions and process observation across production operations.
- Contributed to filling-line and workplace-organisation improvements using Fishbone/Ishikawa and 5W2H in collaboration with operational teams.
Education
MBA in Project Management – Universidade de São Paulo (USP)
Bachelor's Degree in Industrial Engineering – Centro Universitário Sant'Anna


