Lead I - Software Engineering at US Technology international PVT LTD (2026-01 – Present)
Senior Technical Lead at HCL Technologies Limited (2022-11 – 2026-01)
Sr System Administrator at Mitsubishi Power India PVT LTD (2016-09 – 2022-09)
- Upgraded and manage vCenter, vSphere from 6.5 to 8.0
- Designed and implementation Veeam back server
- Configured and manage different OEM NAS box including on-site locations (Synology, Western Digital, QNAP, Seagate)
- Steelhead, SonicWALL, Aruba, DLINK, Net gear switches, Cisco 5k/6k/7k series router configuration
- Involved in manual test execution which was in various testing phases like Functional, Phase and Regression Testing
- Participated in the defect review with development team creation of test scenarios and development of manual test cases
- Develop and execute IT strategies that align with business goals
- Information systems auditing, monitoring, controlling, and assessment process
- Handling vulnerability management associated with Capital One assets connected to the network
- Ensure high availability, scalability, and security of IT infrastructure
- Configured NAS box and managing including site locations
- Endpoint security tools monitor, manage and configuration
- Restore the server from the crashed state
- Network cabling passive and active devices configuration and manage
- Cisco 2500 series AP controller, Ruckus zonal controller configuration and mange
- Responsible for day-to-day administration duties Active Directory object maintenance, troubleshooting, and repair tasks on Active Directory, Domain Controllers, DNS, user authentication, and other operational systems as needed
- Coordinates the development and maintenance of the Risk awareness programs on Operational, Information and Security risk management areas; accountable for facilitating risk awareness communication and training
- IT Procurement - Perform technical evaluations of hardware & software. Vendor finalization. Processes purchase requisitions change orders and requests for quotes to the Procurement team. Performs cost analysis and volume planning for major projects (e.g., BOQ, materials, components, equipment, and services)
- Project completion as per planning
Sr System Administrator at Arka Innovations (2008-10 – 2016-08)
- Installed and configured HP DL GEN 9/10, Dell Family 15/ 16/17, Lenovo 15/ 16 series servers