Construction Manager - De Line'O Construction - KGN road works, Atul industrial site, Gujarat, India
(2024-12)
- Construction for fire wall and transformer foundation, Process building
- Construction of industrial internal PQC road work and Integrated Strom RCC work
- Boiler foundation and switch yard development
- Storage tank foundation and cast in-situ pipe rack
Assistant Construction Manager - Laabh Industries - Halol, Gujarat, India
(2023-12 - 2024-11)
Industrial and infrastructure project
- Construction for dock level and weigh bridges & factory shed 11875sqmt
- Gabion wall 6mt high and 150rmt
- Floor trimix work and semi mirror polishing 11875 sqmt
Civil Superintendent - Gulf Asia Contracting Co. - Borouge 4 Project, Al Ruwais, UAE
(2023-02 - 2023-10)
Construction for ethane cracker plant
- Precast of pipe rack Column with corbel. 270 nos
- RCC road works and campus developing 270000.00 sqmt
- Underground utility works and earth woks
Senior Civil Engineer Sub Contract - De Line'O Construction - Metro Rail project Infrastructure, Gujarat, India
(2017-08 - 2022-12)
- Temporary road work, temporary structure, heavy load transportation and logistics follow-up, road safety provisions
Construction Senior Civil Engineer - Reliance Industries Ltd - HMD, Gujarat, India
(2011-02 - 2017-06)
Worked for Coal based Combine Power Plant (CCPP) and SBR-PBR plant construction
- Piling works 600mm to 900 dia. 3500nos, Chimney foundation mass concrete 425cumt concrete. Fire proof brick work and FRP on structure
- Boiler foundation, cooling towers, pipe rack, coal storage and conveyer system, infrastructure, and UG utilities
- PQC road work 15km, canal work & diversion, high mask tower
- SBR PBR plant RCC pipe rack 3 floor 860 rmt 4.5 meter wide
- Shut down civil work in cracker plant and PTA plant
- Proficiency in maintain and manage DPR, Rate analysis, RA bills, RFI, Safety logbook, Construction material and as built test and quality logbook
Coordinator Civil Engineer - FARA'A Construction co. - UAE
(2010-06 - 2011-01)
Performing for WMB roads, RCC roads, and storm drain works
- Steel structure exaction and 2 floors Deck slab 7500 sqmt
- Strom drain line work 3.5km including earthwork, 1.2mt. dia. Hume pipe
- Precast wall installation G-+1 floor building, deck slab 5400.00sqmt
- WBM road work for industrial approach road and side shoulder placing 600rmt
Senior Civil In charge - ALDAR Laing'O Rourke co. - Abu Dhabi, UAE
(2007-06 - 2009-01)
Al Raha Beach Development and infrastructure project
- Interchange bridges 1.4km length including earth work to hard barrier
- Road diversion and sign board work at high traffic road Dubai to Abu Dhabi
Civil Site Engineer F/M - CCC Const. Co. - Qatar Gas-II, Qatar
(2005-06 - 2007-01)
Worked at Qatar gas-II an expansion project
- Precast pipe rack length 765 rmt, width 4.5mt inc. precast foundation 340 nos
- Construction of storage tank foundation and plant foundations
- WBM road works and interchange. Cable trenches drain concrete pits bituminous waterproofing, equipment platform, utility buildings, maintenance
Senior Civil Engineer - DGDC LTD. - Surat SEZ, Industrial Gujarat, India
(2000-06 - 2005-01)
- WMB road work 22.75km, sewer drain work and access for fire and emergency
- Surat municipal corporation hospital (SMIMER) Hospital building construction
- Developing 75000sqmt green land developing. Essar BPO building construction
- Construction of 19200sqmt industrial building G+2 floor ht. 11.2mt. At Sachin Industrial park