Skip to main content

Hiren Jani

Store Keeper

Talent
BharūchMember since July 4, 2026
Udyog ERPMaterial ManagementWarehousing
·

Hire this person

Send a job offer directly to this candidate

Udyog ERPMaterial ManagementWarehousing

About

Total 15 years of experience in the field of materials management, warehousing of project materials. I am having experience of working on SAP-MM module & SMCS- Site Material control system module. maintaining receipts, issuing invoices, replenishing stocks, and removing defective or expired items from shelves.

Experience

Store Keeper - Pyramid Technoplast Pvt. Ltd.

(2023-04)

  • Receiving and unloading materials per inward documents. Verification of inward documents for correctness thereof.
  • Material loading and unloading with safe material handling practices.
  • Physical Verification of received material against invoice/packing list as per PO.
  • All Consumables, Accessories, Valve, Bolt & Nut, Mechanical, Electricals & Instrumentation.
  • Preparation of DMR(Daily Material Receipt)
  • Preparation of Purchase indent, Delivery Challan, eWay Generation, NRGP/RGP.
  • Preparing GRN and intimate Quality department for material in section .Stock Updating.
  • Issue of materials against proper material issue note, and Monthly Stock updating.
  • Arrange to material Transportation.
  • Working with Udyog ERP

Store Keeper I – Material Management - Petrofac International (UAE) LLC - UAE

(2019-04 - 2023-04)

  • Receiving and unloading Project materials per inward documents. Verification of inward documents for correctness thereof.
  • Material loading and unloading with safe material handling practices.
  • Segregation, Counting, Stacking, Tagging, Color coding various kinds of project materials.
  • Prepare shortage/Damage Report and take suitable forward action.
  • Preparing Note for intimation to Transporter and Note for Claim of Insurance in case of damage of material.
  • Physical Verification of received material against invoice/packing list as per PO.
  • Preparation of DMR(Daily Material Receipt)
  • All Consumables, All fittings, Structure, Handrails, Gratings, Equipment's, Piping, Electricals & Instrumentation.
  • Preparing IMIR(Incoming Material Inspection Report) and intimate EIL & Quality department for material inspection. Stock Updating.
  • Material / Equipment Spares preservation procedure to be followed as per vendor /manufacturer recommendation and maintain records thereof.
  • Preparation of SN-Shipment Notification, MRV-Material Receipt Voucher, MIVR-Material issue Voucher Request, MIV-Material issue Voucher OSD-Overage Shortage & Damage, MRS-Material Return Slip.
  • Inventory analysis in SMCS- Site Material control system module of stock items are available or not, then i check Physical availability.
  • Project material identification & segregation as per packing list.
  • Spares & extra material to be identified & listed out.
  • Records to be generated for spares.
  • All fittings and material & Mandatory-Commissioning spare items to be handed over to client.
  • Material handing over reports to be prepared.
  • Documentation control as per ISO standard.

Store officer - Essar Bulk Terminal Salaya Ltd (Through Atlas Manpower Consultancy Ltd.)

(2013-01 - 2019-03)

  • Correspondence to various departments, Vendor and Buyer
  • Physical Verification of received material against invoice / packing list as per PO.
  • Preparation of DMR (Daily Material Receipt)
  • Preparation of MRR(Material Receipt Report)
  • Finalization of GRN (Goods Receipt Notes)
  • Preparation and Finalization of MIR(Material Issue Report)
  • Inventory analysis in SAP–MM module of stock items are available or not, then I check Physical availability.
  • Project material identification & segregation as per packing list.
  • Spares & extra material to be identified & listed out.
  • Records to be generated for spares.
  • All fittings and material & spare items to be handed over to client.
  • Material handing over reports to be prepared.
  • Documentation control as per ISO standard.

Store Assistant - Essar Projects India Limited (Through Adecco India Ltd.) - Essar Oil Refinery Projects, Jamnagar

(2010-10 - 2012-12)

  • Receiving and unloading Project materials per inward documents. Verification of inward documents for correctness thereof.
  • Material loading and unloading with safe material handling practices.
  • Segregation, Counting, Stacking, Tagging, Color coding various kinds of project materials.
  • Prepare shortage/Damage Report and take suitable forward action.
  • Preparing Note for intimation to Transporter and Note for Claim of Insurance in case of damage of material.
  • Preparing GRN and intimate Quality department for material inspection. Stock Updating.
  • Material /Equipment preservation procedure to be followed as per vendor/manufacturer recommendation and maintain records thereof.
  • Issue of materials against proper material issue note, and stock updating.
  • Material Reconciliation. Regular House cleaning, Area demarcation
  • Documentation control as per ISO standard.

Store Assistant - UltraTech Cement Ltd. (Third Party Contract) - Narmada Cement, Jafrabad Works. Aditya Birla Group

(2007-12 - 2010-10)

  • Project material and shut down material receiving and issuing from issue section to department requirement.
  • Worked in Store Department.
  • Working with SAP (MM Module) as end user

Apprentice - GHCL Limited - Sutrapad (Veraval)

1 Year Apprenticeship in GHCL Limited

  • Training on Installation, Testing, Calibration and Commissioning of different instrument items.

Education

S.S.C. - G.S.E.B. (1999-03)

H.S.C. - G.H.S.E.B. (2001-04)

B.A. - Saurashtra University (2004-03)

M.A. - Saurashtra University (2009-04)

I.T.I. Instrument Mechanic - Instrument Mechanic - I.T.I. College Junagadh (2003-07)

Computer Basic - Zeal Computers Education (2007-07)

Skills

Store Keeper

Reviews

Related