Operation Shift In-charge at Vedanta Alumina Limited

Talent
RaigarhMember since May 21, 2026
Erection and CommissioningProcess ControlCapacity UtilizationArea HousekeepingStacker ReclaimerVibro FeederTraveling TripperWater Treatment PlantAlumina Calcination ProcessHydrate FiltrationPump ChangeoverVenturi DryingFluid Bed FurnaceAir Slide ConveyorFurnace Seal PotMixing SealFluidizing Bed CoolerBag FilterProduction Planning and ManagementDrawing StudyProcess OptimizationManpower ManagementMs-OfficeTeam WorkTechnical Problem Solving
·

Hire this person

Send a job offer directly to this candidate

Erection and CommissioningProcess ControlCapacity UtilizationArea HousekeepingStacker Reclaimer

About

Result-driven and dedicated process professional with more than 12 years in erection, commissioning, O&M, process and production with Power, Steel, Oil&Gas, & Alumina Refinery with Jindal, Bhusan, IOCL, and Vedanta companies. Proven capabilities in managing diverse range of plant activities such as execution of strategic plans, process & equipment, capacity utilization, process control and implementation of 5S and area Housekeeping.

Experience

Operation Shift In-charge - VAAMAN ENGINEERS (India) LTD - Vedanta Alumina Limited Lanjigarh

(2025-12)

Currently working in Operation & Maintenance of 3x3300TPD of calciner-3,4&5 at Vedanta Alumina Limited Lanjigarh (Alumina Refinery in Calciner Area)

Operation Shift In-charge - PRADHAN ASSOCIATES PRIVATE LIMITED - Vedanta Alumina Limited Lanjigarh

(2022-04 - 2025-10)

3.6 years experience in Commissioning assistance and Operation & Maintenance of 3x3300TPD of calciner-3 at Vedanta Alumina Limited Lanjigarh (Alumina Refinery in Calciner Area)

Site In-charge - SPIG COOLING TOWER (I) PVT LTD - IOCL Haldia Refinery, Haldia, W.B.

(2018-06 - 2021-12)

3.5 years experience in Project & Commissioning of BS-VI PROJECT IOCL Haldia Refinery in the package of Cooling Tower

Site Engineer - Bengal Tools Limited - GSECL Wanakabori, Gujarat

(2018-01 - 2018-05)

5 month experience in Project of 1X800 MW Thermal Power Plant in Coal handling plant

Sr. Engineer - M.K.ENTERPRISES - BHUSHAN POWER & STEEL LIMITED Thelkoloi, Sambalpur, Odisha

(2017-05 - 2017-12)

8 month experience of industrial Extension Project & Commissioning of SMS-2 & SMS-1 in Raw Material handling System

Sr. Engineer - SANGHA ERECTORS PVT.LTD. - NMDC Nagarnar Jagadalpur, C.G.

(2015-05 - 2017-01)

1 year 8 month experience of industrial experience Project of 3.0 MTPA integrated steel plant in Package-01 Raw Material Handling System under BHARAT HEAVY ELECTRICAL LIMITED and Project 3.0MTPA integrated steel plant in Package10, Power & Blowing Station in CW Pipe Line Under THERMAX INSTRUMENTATION

Quality Engineer - ADVANCE ENGINEERING & CONSTRUCTION COMPANY - NMDC Nagarnar Jagadalpur, C.G.

(2014-04 - 2015-03)

1 year experience of industrial experience Project of 3.0 MTPA integrated steel plant in Package-10, 2x40MW Boiler Power & Blowing Station under THERMAX INSTRUMENTATION LIMITED

Trainee Engineer - M/S Sonali Structurals & Mechanicals - JINDAL POWER LTD. Tamnar, Raigarh, C.G.

(2012-06 - 2014-04)

1 year & 10 months experience of industrial experience in Commissioning assistance of 4X600 MW OPJSTPP in Coal Handling Plant under THYSSENKRUPP INDUSTRIES INDIA PVT.LTD.