Sales Executive - AIRCEL SHOW ROOM
(2013-01 - 2014-12)
- working in aircel sim finance and sales executive.
- often described as friendly, collaborative and a good place to learn, especially for roles in customer service sales and technical support.
- involves travel with in the city and requires hitting challenging targets.
- focus on developing client relationship.
Assembly Operator - INDO SHELL CAST Pvt Ltd
(2015-01 - 2015-12)
- casting with shell moulding parts assembly.
- ensured proper identification and labeling of products.
- prepared job materials by pulling, cutting, folding assembly.
- operated hand - held bar code scanner to track raw materials and production.
- followed instruction from lead or department supervisor to complete daily tasks.
Assembly Operator - L&T VALVES Pvt Ltd.
(2016-01 - 2017-03)
- bearing and bearing seals into the valve body assembly.
- insert the disc into the body and align the disc hub center with the body housing center assembly.
- shack insertion assembly.
- followed instruction from lead or department supervisor to complete daily tasks.
Assembly Operator - JANATICS INDIA Pvt Ltd
(2018-04 - 2018-05)
- dimensional inspection linear transducers are used for precise measurement to components.
- functional testing inspection station ensure parts meet dimension criteria ; other wise, they are rejected to a scrap rack.
- pressure & leakage testing.
- automation in inspection check for correct assembly and functionality.
Assembly Operator - GILBARCO VEEDER ROOT Pvt Ltd
(2018-06 - 2023-08)
- assembly process involve installing the starting kiosk station assembly to final station assembly process flow fluely.
- domestic and export export latitude model key steps include anchoring the unit, connecting hydraulic electronic, assembling terminals checks.
- dispenser the pump installation and leakage teating.
- final station assembly installing canopy lights, hose retrievers and configuring modules.
- pump packing.
Assembly Operator - RANSAR -1 (Unit Of C.R.I. Pumps Pvt Ltd)
(2023-01 - 2024-08)
- 4"inch motor (export) oil filling station assembly.
- ensure proper identification and tag of products.
- pulling job materials in store.
- 4"inch sub assembly upper housing process fluely ceramic pressing, clamp assembly, cable cutting, cable rolling.
- followed instruction supervisor to complete daily tasks.
Quality Control - CHOLA PUMPS (Unit Of C.R.I. Pumps Pvt Ltd)
(2024-09)
- visual & dimension inspection checking for surface flows, rust prevention casting quality, correct components labelling and verification against design drawing check.
- checking for leaks hydrostatics testing.
- ensure the pump meets specifications.
- shaft run out alignment verifying no eccentricity and ensuing proper coupling alignment.
- surface pump in process inspection, process flow testing report feeding and paint coating thickness ensure mixing ratio.
- ensure sub assembly components painting, stud assembly visual checked & UD clearing
- pdi inspection pump packing all models packing process & BOM verifing.
- ensure problem solving, root cause analysis corrective action QMS standards.
- reports and documents filling.
- monitored 5S practice quality work station.