Shakti Agrawal
Manager-Technical Services
Hire this person
Send a job offer directly to this candidate
About
To leverage my expertise in managing complete project activities for LNG, LCNG, and CNG Daughter Booster stations, encompassing plot selection and development, equipment selection based on load requirements, statutory approvals, installation, pre-commissioning, and start-up. I aim to contribute to successful EPC execution by ensuring operational excellence, regulatory compliance, and efficient operations and maintenance of LNG infrastructure, while upholding the highest standards of safety, quality, and reliability.
Experience
Manager-Technical Services at Think Gas Distribution Pvt Ltd. (2026-01 – Present)
- Design and develop station layouts based on demand forecasts, land documentation, and customer requirements.
- Define project scope, prepare technical proposals, and generate cost estimates for LNG dispensing and LCNG storage & regasification facilities.
- Review and validate PFDs, P&IDs, GA drawings, piping layouts, and equipment datasheets to ensure accuracy and compliance.
- Evaluate the technical feasibility of LNG dispensing systems within existing and proposed LCNG stations.
- Conduct site surveys, feasibility studies, and technical evaluations to support new project development.
- Draft technical specifications and engineering documentation in line with applicable codes, standards, and regulatory requirements.
- Facilitate technical bid clarifications with customers, consultants, and contractors to ensure alignment on project requirements.
- Assess contractor and vendor proposals through detailed technical comparisons and compliance evaluations.
- Contribute to vendor selection processes, participate in technical discussions, and support contract finalization activities.
- Collaborate with Civil, Mechanical, Electrical, Instrumentation, Procurement, and Operations teams to ensure seamless project execution.
- Lead weekly review meetings with vendors and stakeholders to track progress, address technical challenges, and drive timely resolutions.
- Monitor project milestones, ensuring strict adherence to schedules, quality standards, and deliverables.
- Provide support in project planning, budgeting, and resource allocation to optimize execution efficiency.
- Oversee compliance with engineering standards, project specifications, and safety regulations throughout all phases of execution.
- Develop installation and commissioning procedures, checklists, and operation manuals to guide project execution.
- Verify mechanical completion of systems prior to initiating pre-commissioning activities.
- Coordinate punch-point resolution and conduct system readiness reviews to ensure operational integrity.
- Support customer acceptance testing and oversee final project handover to ensure compliance and satisfaction.
- Ensure compliance with PESO regulations, OISD guidelines, PNGRB requirements, and relevant industry standards.
- Conduct quality inspections and verify compliance with approved engineering documents.
Deputy Manager-Technical and Projects at IMC Limited (2018-08 – 2026-01)
- Defined project requirements in line with statutory and regulatory standards, including PESO, PNGRB, and applicable technical specifications.
- Directed greenfield and brownfield expansion projects covering civil works, utility piping, electrical systems, equipment installation, and commissioning.
- Formulated equipment procurement strategies, prepared detailed equipment lists, identified subcontractors/vendors, and established evaluation criteria, selection schedules, and award strategies.
- Finalized procurement plans for long-lead equipment, factoring in lead times, construction sequences, and installation requirements.
- Established procedures for site installation, pre-commissioning, commissioning, and project handover.
- Prepared material planning and scheduling aligned with execution sequences.
- Developed site execution documentation including installation checklists, pre-commissioning records, commissioning reports, and project completion dossiers.
- Represented EPC execution status and milestones in project planning reviews, independent assessments, and customer progress meetings.
- Coordinated layout development with consultants and design teams to secure statutory approvals from PESO, District Magistrate, and local authorities.
- Reviewed civil and structural drawings to ensure foundation designs aligned with equipment specifications.
- Led technical discussions with customers, consultants, and contractors to resolve design and execution challenges.
- Conducted final reviews of engineering drawings, technical documents, and deliverables to ensure compliance with contract and project requirements.
- Verified Bills of Materials (BOM) to prevent shortages and maintain uninterrupted site execution.
- Performed site inspections to monitor civil works and recommended corrective actions where necessary.
- Managed material scheduling and logistics in line with construction sequences.
- Prepared installation procedures, commissioning protocols, operation manuals, and quality documentation.
- Planned and supervised heavy-haul transportation, unloading, and installation of LNG storage tanks and critical equipment.
- Executed installation and commissioning activities in compliance with customer specifications, PESO regulations, and PNGRB guidelines.
- Verified mechanical completion through systematic inspections and checklists before initiating pre-commissioning activities.
- Developed Standard Operating Procedures (SOPs) for erection, installation, commissioning, unloading, storage, and operation of LNG facilities, including tanks, vaporizers, pumps, and process skids.
- Managed statutory approvals from regulatory authorities such as the Pollution Control Board (CTE & CTO), Directorate of Industrial Safety & Health, District Magistrate, and PESO for construction and operational clearances.
- Led compliance activities under LNG/LCNG regulations, including Rule 18, Rule 19, Rule 33, Rule 43, and associated safety certification requirements.
- Handled multiple PESO applications and approvals for LNG/LCNG station construction, operations, and LNG transport tanker compliance.
- Ensured strict adherence to safety, quality, environmental, and statutory requirements throughout the project lifecycle.
Piping Design Engineer at Asmetech Engineers Pvt. Ltd. (2015-04 – 2018-07)
- Handled the tasks of collecting information, performing calculations, preparing sketches and original rough layouts to present design proposal.
- Responsible for providing solutions to different complex problems under general direction.
- Assigned the tasks of determining and developing approaches to solutions.
- Handled the responsibilities of designing portions or system components as well as modifies existing designs.
- Assigned the tasks of preparing piping drawings, layouts, isometric and 3D graphic presentation.
- Responsible for providing feedback on status and man-hours.
Piping Engineer at Gas Arabian Services (2014-04 – 2014-07)
- Review of Project specification and P&ID s.
- Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
- Assist Design Department in solving Piping Modification and Technical Problems in the Field.
- Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation and alignment.
- Carrying out final P&ID check of installed piping systems in the module.
Engineer-Technical and Projects ‘LNG’ at INOX India Limited (2011-07 – 2014-03)
- Review the List of BOQ, Process drawing and P&ID's released from Design dept. to Shop.
- Co-ordination with engineering department and client to resolve out engineering and material related issues.
- Ensuring and reviewing the inspection and quality test certificates for legal approvals.
- Handling Erection and commissioning of cryogenic equipments of LNG satellite station.
- Actively involved in technical support in preparation of Process deliverables like PFDs, P&IDs, and spool pipe drawings.
- Responsibility of applying of State and central approval for LNG Satellite Station.
- Managing commissioned installations for uninterrupted supply of LNG.
- Operation and Maintenance in LNG remote satellite station as a fuel supplier to Industry.
- Combined analysis for ongoing facility operations and troubleshooting with the existing problems being faced.
- Handling all the tankers and trailers loading in PLL premises and unloading at the customer premises.
Education
PGDM in Supply Chain Mangement – IMT-CDL, Ghaziabad (2022)
B. Tech in Petroleum Engineering – University of Petroleum & Energy Studies, Dehradun (2011)
Class 10th – Parwati Prema Jagati Saraswati Vihar, Nainital, Uttarakhand (2004)
Class 12th – Parwati Prema Jagati Saraswati Vihar, Nainital, Uttarakhand (2006)