Sijo
Production Executive (Production Manager)
About
Strong determination to work in a challenging environment by capitalizing on strong technical and interpersonal skills, which in turn fulfill the organization’s need and give an Excellent career growth. To join a renowned Institution to enhance my skills and knowledge and to work for the growth of the Institution.
Experience
Fitter Maintenance & Erection - M/s Dev Devashwar Vanaspathi & SriLakshmi Oil millsPvt Ltd.
(2002-04 - 2004-04)
- Equipment Erection, Maintenance & Fabrication on solvent extraction plant.
Supervisor & Machine operator - M/s S.M Enterprises (Marico Industries)
(2004-06 - 2005-10)
- Equipment Erection & Maintenance.
- Labour Management, Material Procurement.
- Supervisor & Machine operator.
- Maintenance & Operation of FFS machines.
- Maintenance & Operation of Seaming machines.
- Maintenance & Operation of Auto filling & bottle capping machines.
- Maintenance & Operation of Ink-Jet Printers.
- Monthly stock Audit & Finishing goods Quality checking.
- Maintenance & Operation of Air compressors.
- Maintenance & Operation of Oil blenders & Pumps.
Mechanical Maintenance Foreman - M/s Emirates Paper Mills
(2005-10 - 2008-11)
- Labour Management, Material Procurement.
- Maintenance of all Mechanical equipment’s in Paper mill.
- Grinding & Thermal Metal coating on MG Cylinder.
- Machine/ Structural Fabrication, Erection & commissioning.
- Maintenance & Operation of Bending, Shearing, Pressing, Boring, Surface grinding & Turning.
Maintenance Foreman - M/s Global steel Industries
(2008-11 - 2010-06)
Foreman - M/s Gammon India Ltd. - Tuticorin
(2010-07 - 2015-06)
Client: Costal Energen Pvt Ltd. Project Details: 2 x 600 MW Thermal power plant, Tuticorin. Project Amount: Rs.460 Crores.
- Labour Management, Machinery & Material Procurement.
- 275 Mtr Bi-flue Chimney Construction & Erection.
- Passenger Lifts, Material Lifts, Material Hoists, Batching Plants, Chiller plants Maintenance.
- Erection of flue cans with Strand Jacks.
- Cladding of flue can with Stainless steel.
- Erection of Main beams and Staircases.
- Maintain Maintenance schedules as per manufacture operation manual.
- Maintain daily, weekly & monthly checklist of equipment’s to avoid trouble shoots.
- Safety tool box meeting before starting work.
- Update all data’s on Erp.
- Conduct all Maintenance works on Placer boom, Concrete pump, Transit mixers, Batching plants, cranes, utility vehicles Trucks as per schedule and maintain the same in ERP.
- Accounting of sub-contractor bills.
- Doing innovative and profitable ideas for cost-effective at site.
Sr.Foreman.( Plant In Charge) - M/s Gammon India Ltd. - Chennai, Tamilnadu
(2015-06 - 2020-09)
Client: M/s NTPC Tamilnadu Energy Company Limited. Project Details: 2 x 600 MW Vallur Thermal Power Project, (3×500MW)Chennai, Tamilnadu. Project Amount: Rs.476 Crores.
- Labour Management, Machinery & Material Procurement.
- 275 Mtr Single-flue Chimney Construction & Erection.
- Operation and Maintenance of Passenger Lifts, Material Lifts, Material Hoists, Batching Plants, Chiller plants.
- Rope suspended plat forms Erection & Maintenance.
- Erection of Main beams and Staircases.
- Maintain Maintenance schedules as per manufacture operation manual.
- Maintain daily, weekly & monthly checklist of equipment’s to avoid trouble shoots.
- Safety tool box meeting before starting work.
- Update all data’s on Expedion.
- Monitoring Safety of Workers at all levels.
- Coordinating with site and HO.
- Monitor the progress of work with respect to the Master Program.
- Conduct all Maintenance works on Placer boom, Concrete pump, Transit mixers, Batching plants, cranes, utility vehicles Trucks as per schedule and maintain the same in ERP.
- Accounting of sub-contractor bills.
- Doing innovative and profitable ideas for cost-effective at site.
Production Executive.(Production Manager) - S.M.Enterprises (Dedicated 3P unit of Marico LTD)
(2020-09)
Client: Marico Limited. Production Details: Blow, Print, Fill of 48 SKU`s and Brand. Production Capacity: Blowing -2.5 Cr, Print-2.5Cr, Fill-2.5 Cr.
- Overall, handling the process.
- Planning for meet the service level.
- Maintain and review the OEE (Overall Equipment Effectiveness)
- Staff/Labor arrangement and management.
- Machine, Spares and material procurement.
- Conducting internal audits and training for team.
- Innovative and profitable kaizens for cost and quality effective.
- Achieving the service targets of production.
- Adopt and update technology to achieve better outputs with minimal manpower.
- Maintain the production-related documentation.
- Maintain spares list and bargain with vendors for a best price & quality.
- Attend to unexpected breakdowns immediately and completely on time without affecting Production.
Education
D.M.E - Janardan Rai Nagar Rajasthan Vidyapeeth University (2017)
ITI - Govt ITI Malampuzha Palakkad (2002)
S.S.L.C - P M G M Hr., Sec, School, Palakkad. (1997)