
عبدالباري الجبوري
Environmental and Pollution Engineering Technical
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
Supervised OSP fiber optic infrastructure works, including road excavation, trenching, duct/direct-lay installation, and concrete reinstatement. Supervised excavation activities using Bobcat machinery and ensured compliance with approved route specifications, drawings, and required dimensions. Monitored the installation and positioning of fiber optic ducts and infrastructure in preparation for cable deployment.
الخبرة
OSP Fiber Optic Site Engineer & Infrastructure Supervisor at EarthLink telecommunications (2026-05 – 2026-08)
- Supervised OSP fiber optic infrastructure works, including road excavation, trenching, duct/direct-lay installation, and concrete reinstatement.
- Supervised excavation activities using Bobcat machinery and ensured compliance with approved route specifications, drawings, and required dimensions.
- Monitored the installation and positioning of fiber optic ducts and infrastructure in preparation for cable deployment.
- Executed and monitored fiber optic routes based on approved drawings and As-Built plans using QField.
- Conducted site inspections and verified actual field conditions against approved designs and project requirements.
- Supervised the construction and installation of pole foundations, including reinforcement steel installation and foundation preparation.
- Supervised the installation and positioning of FDA (Fiber Distribution Access) and FDT (Fiber Distribution Terminal) units.
- Coordinated with civil contractors, field crews, and fiber optic teams to ensure smooth project execution and site readiness.
- Monitored contractors and site teams to ensure compliance with project specifications, quality standards, and HSE requirements.
- Followed up on daily site activities, work progress, and construction quality.
- Identified site issues and coordinated corrective actions to maintain project progress and quality.
- Verified completed works against approved drawings, specifications, and project requirements.
Environmental Laboratory Engineer at Baiji Refinery (2025-05 – 2025-09)
- Conducted environmental monitoring and laboratory activities within the refinery environment.
- Collected and prepared environmental samples according to established sampling procedures and laboratory requirements.
- Performed laboratory analysis and testing of environmental samples using appropriate laboratory methods and equipment.
- Monitored environmental parameters to assess compliance with applicable environmental standards and requirements.
- Recorded, reviewed, and maintained accurate laboratory results, measurements, and technical documentation.
- Assisted in identifying potential environmental impacts associated with refinery operations.
- Ensured proper handling, labeling, storage, and preparation of environmental samples.
- Followed laboratory safety procedures and environmental health and safety requirements.
- Maintained laboratory equipment and ensured proper operating conditions and measurement accuracy.
- Prepared technical reports and documented laboratory findings for environmental monitoring activities.
- Coordinated with environmental and operational teams regarding sampling, testing, and environmental observations.
Solar Energy Site Engineer & Installation Supervisor at Sayyid Al-Asaar Shopping Complex (2024-01 – 2025-01)
- Supervised the complete installation and commissioning of solar photovoltaic (PV) systems at a commercial facility.
- Oversaw the installation of solar panels, mounting structures, DC/AC cabling, protection systems, and related electrical components.
- Supervised the installation, configuration, and commissioning of solar inverters.
- Programmed and configured inverters according to system requirements and operating parameters.
- Conducted inspections and quality checks throughout the installation process to ensure compliance with technical specifications and project standards.
- Verified proper panel alignment, mounting, cable routing, connections, grounding, and overall system installation quality.
- Performed system testing and commissioning to ensure safe, stable, and efficient operation.
- Monitored electrical and mechanical installation works and identified defects or deviations during implementation.
- Coordinated with technicians and installation teams to ensure proper execution and timely completion of the project.
- Ensured compliance with electrical safety requirements, installation standards, and manufacturer specifications.
- Verified system performance after commissioning and ensured the solar system was fully operational.
التعليم
Bachelor's degree in Environmental and Pollution Engineering Technical – Northern Technical University / Kirkuk Technical College Engineering


