
Nawwar Mahmood
SENIOR PLANNING ENGINEER | Power Generation & Oil & Gas | Planning, Scheduling & Project Controls
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
Planning Engineer with extensive experience in power generation and Oil & Gas projects. Skilled in Primavera P6 and MS Project, WBS development, baseline schedule preparation, Level 1-4 scheduling, critical-path review, and progress forecasting. Practical experience applying earned value management indicators, preparing S-curves and look-ahead plans, and monitoring schedule variances.
Coordinates with engineering, contractors, vendors, and site teams to identify constraints and contribute to recovery planning. Additional experience includes construction progress monitoring, gas-turbine maintenance, and outage planning.
الخبرة
Production Planning Engineer at Fabyab Packaging Solutions (2026-03 – Present)
- Manage production and capacity planning for a newly established plant, aligning material readiness, delivery priorities, and resource availability.
- Monitor plan-versus-actual performance, identify production constraints, and coordinate priorities across production, procurement, warehouse, maintenance, and management.
Resident Team & Projects Planner at Baker Hughes Contractor (ME) (2024-08 – 2026-03)
- Developed WBS and baseline schedules using Primavera P6; updated schedules, reviewed critical paths and total float, and monitored progress against the baseline.
- Prepared schedules and progress reports, including S-curves, planned-versus-actual comparisons, look-ahead plans, and manpower histograms.
- Applied earned value management (EVM) indicators to monitor project performance, assess variances, and support progress reporting.
- Coordinated material readiness, procurement follow-up, resource requirements, spare-parts logistics, and vendor mobilization with Baker Hughes and BGC teams.
- Tracked schedule delays, field constraints, and material availability; contributed to recovery planning by coordinating priorities and proposing corrective actions with site teams.
- Contributed to a site-preparation survey at North Rumaila NGL, verifying site conditions and readiness for gas-turbine module replacement activities.
- Received a BGC / Baker Hughes Certificate of Appreciation for contribution and strong HSE commitment during the DP315 IBC C Scrubbers' Internals Upgrade project.
Senior Planning Engineer at International Free Company (IFC) (2024-01 – 2024-05)
- Coordinated planning across multiple projects, updated Primavera P6 schedules, reviewed critical activities and schedule performance, and issued weekly reports highlighting risks, variances, constraints, forecasts, and corrective actions.
Planning Manager at Mass Group Holding (2014-12 – 2024-01)
- Managed gas-turbine maintenance and outage planning, coordinating schedules, work priorities, resources, and execution interfaces with plant operations and maintenance teams and GE field-service personnel.
- Performed site-survey and technical-evaluation activities related to GE works at Basmaya Power Plant, documenting site conditions and assessment findings.
- Managed punch-list and warranty-item trackers for the Erbil Combined Cycle Power Plant Extension and drove closure through multidisciplinary coordination and periodic close-out meetings.
- Coordinated technical-action follow-up for GE gas-turbine units across MGH plants in Erbil, Sulaymaniyah, and Duhok.
- Implemented and administered Mainsaver and Microsoft Navision CMMS workflows supporting preventive and corrective maintenance plans, work-order scheduling and control, equipment history, and periodic reporting.
Planning Engineer & DCC Responsible at Mass Group Holding (2013-02 – 2014-12)
- Monitored construction progress and reviewed contractor schedule updates, including activity total float, as part of the owner's team for the power plant extension.
- Coordinated interfaces with contractor, engineering, and vendor teams; managed controlled project records, transmittals, revisions, and technical documentation.
Planning Engineer at Mass Group Holding (2012-05 – 2013-02)
- Prepared and updated gas-turbine inspection and maintenance schedules and planned, followed up, and closed preventive/corrective work orders using Mainsaver CMMS.
- Consolidated gas-turbine maintenance schedules for three MGH power plants using MS Project and coordinated with plant maintenance teams and the Central Maintenance Department.
Contract Engineer at Iraqi Elite Company (2011-01 – 2012-05)
- Supported tender and prequalification preparation, including technical proposals, tender schedules, planning inputs, accommodation-camp layouts, and HSE plans.
Inspection Engineer at Ministry of Electricity (2009-03 – 2010-12)
- Conducted technical site visits to power-plant projects, reviewed test reports and inspection activities, verified field progress, and prepared formal visit reports for MOE / Projects Directorate management.
Planning Engineer / Assistant Manager at International Free Company (IFC) (2005 – 2009)
- Prepared master project schedules using Primavera and detailed site schedules using MS Project; monitored site execution, issued daily progress reports, and coordinated work with other departments.
- Prepared engineering designs and layouts using AutoCAD, including the Phase II pipeway design for South Baghdad Gas Power Station-2 serving eight gas-turbine units.
التعليم
Higher Diploma in Metallurgy Engineering – University of Technology, Baghdad (2004)
B.Sc. in Mechanical Engineering (Metallurgy) – University of Technology, Baghdad (2002)
