2022 – (Current) MEP Project Engineer, Water Flow Ltd.
- Prepared working and Shop drawings and cost estimates for Plumbing,
drainage Waste vent systems.: Using Autodesk Revit and AutoCAD
- Prepared weekly budgets for the project where cashflow statements werused to track on the cost of the project and issued the relevant advises tthe client.
- Ensured that all the procurements were done on time.
- Prepared As-built drawings for completed MEP projects designed by
Engineers.
- Liaising with the project Team in solving Site issues and ensuring that no there was no delay for works.
- Provided technical advice to the Skilled Plumbing sub-contractor on issues relating to construction.
- Planning, coordinating and managing the various Site activities
- Valuing completed works and arranging for payments
- Preparing contract documents, including bills of quantities with the architect and/or the client(s.
- Analyzing outcomes and writing detailed progress reports for understanding the progress of the project and advising the Subcontractor appropriately.
Assisting in approval of all projects final payments certificates.
- Formulating, implementing and reviewing policy on tendering and procurement procedures, financial and contract administration of building construction and maintenance contracts.
- Carrying out quality and cost control and standards for all construction projects.
- Conduct cost analysis and Cost planning from already completed projects and undertaking cost analysis for repair and maintenance project work
- Assist in carrying out Monthly valuations on site and site remeasurements
- Conducting feasibility studies to estimate materials, time and labour costs.
- Assisting in Preparation of variation orders and final accounts.
- Maintaining awareness of the different or multiple ongoing projects.
- Verifying and validating of projects costing.
- Arranging and organizing for Pre-work meeting with all the workers so that they gain an in-depth Understanding for the implications of health and safety regulations.
- Working closely with the bid/proposal team and with the project implementation team/engineering team when the project becomes live.
- Preparing, managing and monitoring the sectional budgets.
- Allocating work to subcontractors
- Providing direction, control and coordination of quantity surveying.
2021 -2022; Construction Site Manager, Iris Architects Ltd.
- Worked as a Construction Site Manager ensuring that all the works are done as per specification on working drawings and within budget and stipulated time.
- Prepared weekly budgets for the project where cashflow statements were used to track on the cost of the project and issued the relevant advises to the client.
- Ensured that all the procurements were done on time.
- Liaising with the project engineer on detailing of the structural drawings in regard to buildability.
- Liaising with the project Architect on Site issues and ensuring that no there was no delay for works.
- Analyzing outcomes and writing detailed progress reports for understanding the progress of the project and advising the Subcontractor appropriately.
- Assisting in Preparation of variation orders and final accounts.
- Verifying and validating of projects costing.
- Carrying out quality and cost control and standards for all construction projects.
2018 (April to July): Construction Project Manager, Intern Nidcon Builders Ltd
- Surveying: Taking of final finish levels for both civil and proposed concrete works
- Material Scheduling: Estimated the material required for the proposed work and forwarded to the MC for Procurement
- Setting Out: Took building measurements from the working drawings by transposing them on the proposed site for implementation while at the same time reconciling them for constructability purposes.
- Material Testing: Mobilizing the preparation of material samples for testing and approval by the consulting Engineers.
- Site Inspection/Meetings: Represented the Site engineer during Site meetings and Inspections.
- Drawing Interpretation: Interpreted the working drawings for the technicians.
- Directing, coordinating the various Technicians in consultation with the
Sub-contractors on what had to be done at any given time throughout the project phase.
- Site Draughtsman for the Main Contractor: Updated the working drawing as change were made by the Design Team that were be submitted AsBuild
Drawings
Site Supervision: Assisted the Site engineer in supervising the various works at the site e.g concrete works e.t.c
2016-2018; Construction Project Manager, Intern Dicom Ltd
- Surveying: Taking of final finish levels for both civil and proposed concrete works
- Material Scheduling: Estimated the material required for the proposed work and forwarded to the MC for Procurement
- Setting Out: Took building measurements from the working drawings by transposing them on the proposed site for implementation while at the same time reconciling them for constructability purposes.
- Material Testing: Mobilizing the preparation of material samples for testing and approval by the consulting Engineers.
- Site Inspection/Meetings: Represented the Site engineer during Site meetings and Inspections.
- Drawing Interpretation: Interpreted the working drawings for the technicians.
- Directing, coordinating the various Technicians in consultation with the
Sub-contractors on what had to be done at any given time throughout the project phase.
- Site Draughtsman for the Main Contractor: Updated the working drawing as change were made by the Design Team that were be submitted AsBuild
Drawings
Site Supervision: Assisted the Site engineer in supervising the various works at the site e.g concrete works e.t.c