Langkau ke kandungan utama
David Dass

David Dass

Technical & Project Director(Electrical/Mechanical

Bakat
Seremban, Negeri SembilanAhli sejak 4 Jun 2024
·

Sewa orang ini

Hantar tawaran kerja terus kepada calon ini

Tentang

Over 29years experience in Engineering (Electrical, Mechanical and Automation ) in various field, Manufacturing , Operations , R&D ,Project Management ,Supply chain Telecommunication. I'm also having vast experience , ISO, 6 sigma green and black belter, automation system, lean manufacturing and production manufacturing excellence with strong leadership practices.

Moreover, I'm also Invented and have Patented globally a New Technology In Energy Converter which can use for Wind turbine, Hydro Turbine, and EV (Patent Rights validity until 2034).

Pengalaman

CURRENT WORKING JOB SCOPE As Technical and Project Director Electrical /Mechanical / Automation

  • Working with VNV Engineering Sdn Bhd as Technical and Project Director major scope in Electrical /Mechanical

And Automation, to manage, lead and budgeting overall project and preparation and submission report to Managing

Director and Client.

Duration

Responsibility

2020(Jan)~Onward Technical and Project Director Electrical /Mechanical / Automation

  • Project Managing technical projects, budgets, timelines, strategies planning and leading the work of a team to achieve all project goals within the given constraints
  • Stakeholder management Budgeting, Project planning, and Delivery
  • Oversee the Projects Manager and ensure their team completes tasks on time and within budget
  • Managing schedules of Project Manager by oversee different aspects of a program, planning, managing works, timelines and including the schedule.

WORKING EXPERIENCE (10 Years) As Principal Director Electrical /Mechanical R&D and Technical Engineer

  • Working with Xair Pulsecor Sdn.Bhd as Principal Director Electrical /Mechanical R&D and Technical Consultancy

Engineer for Telco Industry. Mainly Research and Development on the Self-Power Generation green technology for the

Base Transmission System BTS for the Telecommunication and the responsibility are stated as below: -

Duration

Responsibility

2010(Jan)~2020(Jan)

As Senior Staff Electrical/Mechanical R&D Engineer & Technical Engineer.

  • Doing research on Power Generation for the Base Trans receiver Station

(BTS) Green Technology with zero emission.

  • Designing Panel and Rectifier circuit -48Vdc for the BTS system, RRU, BBU,

Microwave for (2G and 3G) configuration for Maxis and Celcom.

  • Designing protection Circuit for the BTS system, and auto resetting system.
  • BTS Installation, Integration and Setup (Huawei, Nokia Simens, Ericsson)
  • Assists and Allies in daily operations in co-ordinate with supplier and customer as well as procurement and provide training and guidance to the respective site project.

WORKING EXPERIENCE (2 1/2 Years) As Senior Project Engineer/ Manager (Electrical/Mechanical)

  • Working with Pteris Global Limited Engineering (formally knowns as Inter-Roller) Singapore-Dubai as a Senior Project

Engineer/Manager (Electrical/Mechanical) Handling Baggage System in Dubai World Center International Air Port of Jebel

Ali, Dubai Terminal 1, Terminal 2 and Terminal 3 and the responsibility are stated as below: -

Duration

Responsibility

2009(Jan) ~2010(Jan)

As Senior Project Engineer/ Manager

  • Lead and manage overall project operations
  • Plan, organize and lead to ensure smooth operations
  • Project Management, Site Co-ordination
  • Project Management Consulting - Assist clients and Allies with Consultant

Adpi (France) and Dubai Government (DCA).5. Project Management activities like project planning, attending meetings, up keeping of project records/ correspondences, project reporting,

scheduling, costs control, risks management and etc.

  • Machine/Panels Installation, Integration and Setup.
  • Documentation Engineering Change Management.
  • Involvement with Design team Auto CAD drawing and designing.
  • Schedule Planning for Installation, Materials, Progress of work and etc.

WORKING EXPERIENCE (2 Years) As R&D Sustain Electrical Hardware Design Engineer

  • Working with Xyratex Malaysia and Xyratex International Scotts Valley, California United State as R&D Sustain

Electrical Hardware Design Engineer (Developing machine for Disk Drive production) and the responsibility are stated as below: -

Duration

Responsibility

2007(Jan) ~2008(Dec)

As R&D Sustain Electrical Engineer

  • Troubleshooting the Machines and Control System
  • PLC Programming (Mitsubishi and Wonder Ware system)

3. Hardware and Software Wiring System and Interface System

  • Machine Modification and Upgrade the operation
  • Machine Integrations, Installation and Setup
  • Electrical Auto Cad Drawing and Designing.

7. Documentation On Engineering Change

Management, SAP, Palm Tree and ect.

WORKING EXPERIENCE (11 Years) As Maintenance and Automation Engineer

  • Working with Maintenance Department at Samsung SDI (Malaysia) Berhad. Seremban, Negeri Sembilan, since 6th

January 1995 until December 2006.

  • Position Level heals as Maintenance and Automation Engineer and the responsibility are stated as below:-

Duration

Responsibility

1995(Jan) ~1997(Jul)

As Electronics Maintenance

  • Troubleshooting the Electronics machines
  • Electronics PCB cards repairing.

3. Preventive Maintenance

4. Line Stop Maintenance

  • Project Work
  • Machine Modification and Upgrade
  • Training and education for down line and new employees.

1997(Jul) ~1999(Sept)

As Electrical and Mechanical Maintenance

As Electrical Maintenance

  • Troubleshooting the Machines and Control System

2. Preventive Maintenance

3. Line Stop Maintenance

  • Breakdown Maintenance (Repairing)
  • PLC Programming (Sharp, Samsung, Keyence, Koyo)

6. Hardware and Software Wiring System and Interface System.

  • Machine Modification and Upgrade the operation

8. Control Panel Fabrication and Installations

  • Training and Education for down line and new employees.

As Mechanical Maintenance

1. Troubleshooting on Pneumatics and Hydraulics System

  • Servicing Pumps and Value

3. Preventive Maintenance

4. Line Stop Maintenance

  • Breakdown Maintenance (repairing)
  • Modification and Project work for Upgrade the Machine1999(Sept) ~ 2006(Dec)

As Project Leader for Maintenance Technology Team

  • Project Implementation

2. Designing

3. Fabrication Work

  • Installation /Commissioning and Setup Work
  • Handling Motorman Robots (ERC, MRC, XRC, UP-6, 50 & 60)

6. On Call for Emergency Purpose.

  • Machine Breakdown Analysis

8. Preventive Planning

9. Providing Technical Training for Technician and Engineers

  • Providing Six Sigma Training Green Belt for Engineer and Technician level

POSITION HEAL WHILE IN THE MAINTENANCE DEPARTMENT

1996(Jan) ~1997(Dec) As Electronics Supervisor

Job Scope

  • Supervise the maintenance Technician
  • Updating the daily machine breakdown history records and reports
  • Spare parts control and inventory

4. Records the performance of the technicians’ base on the MTBF and MTTR

  • Prepare the SAP R3 in the system for preventive maintenance
  • Prepare the work order and material request
  • Prepare monthly trend of machine breakdown and analysis

1997(Jan) ~1999(Sept) As Electrical and Mechanical Superintendence

Job Scope

  • Supervise the maintenance Technician and Supervisor
  • Manpower control and arrangement
  • Record the performance of the Technician and Supervisor base on the MTBF and MTTR
  • Planning for machine improvement base on frequency of breakdowns
  • Cost saving and Autonomous activity (5s)
  • Prepare proposal and reports for machines improvements
  • Project work and upgrade the machine efficiency

8. Prepare reports and data base on the Failure Mode Effect Analysis (FMEA) and Root Cause Failure Analysis

(RCFA)

1999(Sept) ~ 2006(Dec) As Team Leader for Maintenance Technology (Project Team)

Job Scope

  • Manage a group of Junior Engineers and Engineers to achieve the target of quality product and minimize the machine breakdown.

2. Reporting to the manager and planning for upgrade the machine efficiency and increases the Production direct yield.

  • Develop, Setup and Improvement the machine according to the need of production
  • Provide Six Sigma training GB for Technicians and Engineers level
  • Analysis, Improve and minimize the machine breakdowns base on (FMEA and RCFA)
  • Project work rationalization of manpower thru Low-Cost Investment Automation (LCIA)
  • Spare parts control, inventory and budget planning for each factory

Pendidikan

EDUCATION AND QULIFICATION

Qualification

: Bachelor's Degree

Field of Study : Engineering (Electronics and Communication)

Major

: Electronics and Communication Engineering (EC)

Institute/Uni. : Kensington University US (Oversea council exam center, Malaysia)

Grade

: 3.5 CGPA

Graduation

: 2001

Qualification

: Diploma Engineering

Field of Study : Engineering (Electrical/Electronic)

Major

: Electrical and Electronics Engineering (3E)

Institute/Uni. : Midas College Seremban, Malaysia

Grade

: 2nd Class Upper

Graduation

: 1997

Qualification : Diploma Engineering

Field of Study : Industrial Electronics Engineering

Major

: Industrial Electronics (IE)

Institute/Uni. : Tafe College Seremban, Malaysia

Grade

: Grade B

Graduation

: 1994

Qualification : Technician Diploma

Field of Study : Industrial Electronics Engineering

Major

: Industrial Electronics (IE)

Institute/Uni. : Tafe College Seremban, Malaysia

Grade

: Grade B

Graduation

: 1994

Qualification : Certificate Sijil Kemahiran Malaysia

Field of Study : Electronics and Electrical Instrumentation

Major

: Industrial Electronics (IE)

Institute/Uni. : Putra Jaya, Malaysia

Grade

: Level 1 until 3

Graduation

: 2000

Ulasan