Prem Raj
Graduate Civil Engineer
Sewa orang ini
Hantar tawaran kerja terus kepada calon ini
Tentang
I am Premraj Ganesan,completed my Bachelor in Civil Engineering at University Tenaga Nasional (UNITEN). I am a passionate and self-motivated Fresh Graduate seeking an opportunity in the Civil engineering field. During my academic journey, I developed a solid foundation in civil engineering principles, with a focus on structural analysis, geotechnical designs, transportation systems, and project management.
Also, I have gained practical experience through internship and various projects. My previous endeavors and experience demonstrate my attention to detail, multitasking capabilities, individuality, and ability to work in a team-based environment. As a recent graduate, I am keen to learn about the work experience I will get and how I will overcome the challenges that this new exposure will bring.
Pengalaman
Civil engineering Internship Medic & Comm Services, Kelana Jaya, Selangor 06/2022-09/2022 • Verified details in construction drawing in accordance with project specifications.
- Prepared ghant chart/schedule for construction activities.
- Arranged tower setting template collection and prepared schedule for tower collection in accordance with tower construction timeline.
- Monitored closely with Civil and Structural team and updating supervisor and client about the submission to Local council.
- Site acquisition for 3-legged tower construction • Prepared bar bending schedules for tower foundation.
- Coordinated/Arranged materials supply to site.
- Found supplier for the materials listed in bill of quantity for 60m and 76m tower.
- Coordinated land survey and soil investigation to the site.
- Designed foundation for 60m/76m tower. (Manual calculation for 76m tower to countercheck with the design provided by consultant) • Prepared weekly progress report of overall project progress.
Pendidikan
UNIVERSITY TENAGA NASIONAL (UNITEN) May 2019-2023 Bachelor’s in Civil Engineering (Hons.) Current CGPA :3.32 ➢ Final Year Project (FYP) on implementation of Building Information Modelling (BIM) to reduce variation order (VO) in Malaysian construction industry ➢ Structural modelling for integrated design project on designing double storey shoplot

