Skip to main content
Soe Moe Htoo

Soe Moe Htoo

Mechanical Project Engineer with 12 years of experience

Talent
AucklandMember since August 18, 2026
Transfer PumpsSump Pump SystemsContractor CoordinationSubcontractor CoordinationShop DrawingSchematic DrawingIsometric DrawingAs-built DrawingDocumentationProgress MonitoringAutoCAD
·

Hire this person

Send a job offer directly to this candidate

Transfer PumpsSump Pump SystemsContractor CoordinationSubcontractor CoordinationShop Drawing

About

Mechanical Project Engineer with 12 years of experience delivering large-scale residential, commercial and mixed-use M&E projects in Singapore. Experienced across the full project lifecycle including design coordination, mechanical services installation, Piping systems, Fire systems, HVCA systems, QA/QC, testing & commissioning, technical submissions, contractor coordination, progress monitoring and project handover. Recently completed a Master of Engineering Project Management at Auckland University of Technology (AUT) and now seeking opportunities in New Zealand as a Mechanical Engineer, Building Services Engineer, Project Engineer, Maintenance Engineer or MEP Coordinator.

Experience

Senior Project Engineer at Great Resources M&E Contractor Pte Ltd (2015-08 – 2025-06)

  • Managed the delivery of mechanical and piping systems, including transfer pumps, booster pump systems, and water storage tanks from design coordination through installation, testing, commissioning, and final handover.
  • Responsible for engineering coordination and delivery of sanitary sewer, wastewater ejector and sump pump systems.
  • Produced and coordinated P&IDs, sanitary sewer layouts, inspection chamber (IC) drawings, domestic water tank layouts, water supply drawings, shop drawings, schematic drawings, isometric drawings, and as-built drawings using AutoCAD to support construction, authority submissions, and project delivery.
  • Prepared material submissions, method statements, technical submissions, and engineering documentation for consultant, client, and authority approvals.
  • Coordinated with consultants, architects, project managers, subcontractors and suppliers to resolve technical issues and maintain progress.
  • Reviewed engineering drawings and specifications to improve constructability and minimize design conflicts.
  • Supervised site installation works to ensure compliance with approved drawings, QA/QC requirements and HSE standards.
  • Prepared inspection requests, commissioning records, as-built drawings and project handover documentation.
  • Supported project planning, monthly progress reporting, contract administration and stakeholder communication.
  • Key Project: Coco Palms (944 units) (2015 - 2018), Stirling Residences (1,259 units) (2018 - 2022), Canninghill Piers (mixed-use residential & hotel development) (2022 – 2025)

Project Engineer at D'Ray Construction Pte Ltd (2013-10 – 2015-07)

  • Coordinated M&E works for redevelopment and building projects
  • Produced shop drawings, MOS, risk assessments and technical submissions
  • Managed subcontractor coordination, project cost monitoring and contract administration support
  • Prepared tender documentation including BOQs, quotations and technical proposals
  • Prepared and verified as-built documentation before project handover
  • Key Project: JEN Singapore Orchardgateway

Education

Master of Engineering Project Management in Engineering Project Management – Auckland University of Technology (2026-07)

Specialist Diploma in M&E Coordination in M&E Coordination – BCA Academy (2016-11)

Bachelor of Mechanical Engineering in Mechanical Engineering – Yangon Technological University (2011-11)

Recognition - Level 7 Mechanical Engineering in Mechanical Engineering – NZQA (2026-03)

Reviews