WORK EXPERIENCE
Project Engineer
Al Majed Technologies, May 2018 – Present Now
Project Milestones
QATAR GENERAL ELECTRICITY & WATER CORPORATION
CLIENT -KAHRAMAA
MAIN CONTRACTOR-LARSON & TUOBRO CONSULTANT-TRACTEBEL
PH13 -132/11kV OLD AIRPORT-2 SUBSTATION
PH13 -132/11kV AL WAJBAH SUBSTATION
PH13 -66/11kV DOHA INDUSTRIAL-F SUBSTATION(UPGRADE)
PH13 -132/11kV AL ASMAKH SUBSTATION
PH13 -66/11kV Al SADD-2 SUBSTATION
PH13 -132/11kV Al FROOSH-2 SUBSTATION
PH13 -132/11kV Al DAAYEN-2 SUBSTATION
PH13 -66/11kV KTS SUBSTATION
KMCC-AMI CENTER(AL-THUMAMMA)
QATAR GENERAL ELECTRICITY & WATER CORPORATION
CLIENT -KAHRAMAA
MAIN CONTRACTOR- BEST & BETAS CONSORTIUM CONSULTANT- ENERGOPROJEKT ENTEL LTD
PH13 -132/11kV OLD AIRPORT-2 SUBSTATION
PH13 -132/11kV AL WAJBAH-2 SUBSTATION
PH13 -132/11kV AL ZUBRAH SUBSTATION
ASHGAL (PUBLIC WORKS AUTHORITY)
CLIENT -ASHGAL
MAIN CONTRACTOR-BOOM GENERAL CONTRACTORS CONSULTANT-ROYAL
NEW OFFICE AND CAR PARK FOR ASSET AFFAIRS
- Develop and implement effective fire protection designs for compliance with fire codes, standards and regulations.
- Installation of fire protection systems based on the hazard and occupancy and as per the requirement of QCDD/NFPA.
- Preparation of entire BOQ for the project based on the approved Dwg
- Installation, supervision and T&C for the fire alarm systems FM200, fire detection system Deluge & sprinkler system and Fire pumps.
Resolving any unexpected technical difficulties at the project site and other problem that may raise, with the proper coordination to the concerned head.
- Attend meeting at the project site or off-site to address the concerns of architects, engineers, construction managers, and subcontractors.
- Check and verify all the installation of, materials and equipment are ready at the project site and coordinate necessary site inspections with the consultant.
- Preparing isometric and shop layout drawings for firefighting system and detection systems.
- Estimating project scope and procure the materials for the firefighting system include mechanical and electrical.
- Monitoring the daily progress and reporting to the project manager regarding execution.
- Identify and track all changes or potential changes to the project scope ensuring estimates of cost changes and schedule impact are given visibility with the client and project management.
- Preparation and review of the As-built drawings in terms of any changes in the installation
Project Engineer
Argon Global Qatar (AUG’2014- APR’2018)
Project Milestones
Al Baker Tower-Electrical Engineer
Msheireb Downtown-ELV Engineer.
Qatar University-ELV Engineer
- Responsible for installing, programming and testing/commissioning of Lighting Control system.
- Tests & Inspects Jace Box, RB 2000, Controllers, Retractive Switches & Sensors.
- Consistently attends work when scheduled and on time, follows instructions, responds to management direction and solicits feedback to improve performance.
- Attending meetings, writing reports and giving presentations to managers and client. Educating clients on the usage of various security equipment’s provided by the company.
- Complete necessary documents as per the company policy & maintain the records by documentation installation.
- Preparation of Workshop Drawing and Material submittal for consultant approval.
- Preparation of Daily & Weekly program based on one month look ahead program.
- Preparation of the detailed Site quantities requirement based on the consultants’ approved drawings.
- Troubleshoot damaged or faulty installed fire protection systems.
- Schedule all preventive maintenance for completed projects
MEP Engineer
Utility Tech International, Qatar (JUN’2013- AUG’2014)
Project-Q RAIL (Red LINE) - MEP Engineer.
- Construction Supervision of all electrical, mechanical, fire Alarm and Air conditioning works.
- Assisting the Project Manager in the Project Work from the beginning stage till the submission.
- Preparation, execution & monitoring, testing & commissioning of all MEP systems like HVAC, Plumbing & Electrical low current system as per the compliance with plan, shop drawing Specification, Standard and schedule.
- Coordinating and supervising the installation work of electrical items.
- Checking the contractors' As-built electrical drawings for adequacy.
- Monitoring and controlling the day-to-day activities of the electrical inspectors i.e., site work
- inspection as well as inspection of the materials delivered in Contractor’s store.
- Ensuring that inspections are carried out in time and quality of installation and delivered
- materials are maintained as per the relevant specifications/ standards as well as relevant local
- Authority’s regulations/ requirements
- Attending meeting on sites, project reporting, site coordination and Team supervision.
- Reviewing and reporting of the project status.
- Execution of the project engineering involving Delivery, Installation of Cast Iron Drainage Pipes, Coupling, support system, inspection &Leak testing.
Junior Engineer
BEML LTD, INDIA (JUN 2011-APR 2013)
Project-METRO RAIL PROJECT (BANGALORE METRO)
- Responsible for maintaining and repairing heavy equipment required in the day to day working.
- Analysis of machine failures & Estimation of maintenance cost.
- Maintenance of welding machine/ Maintenance of lathe machine.
· Testing and analyzing the dielectric strength of the cables used in the metro cars.
· Testing and commissioning of Electrical Equipment including Meggering.
· Participating in audits and reviews of testing, highlighting areas for improvement.
· Drawings and documentation updates & Responsible for executing test cases, documenting results and defects.
· Attending meetingson site& Preparation of Electrical procedures for installationtest & Commissioning.
- Studied and analyzed the Braking system performance of the metro cars. Electrical wiring in brake electrical control unit cubical. Checking the end-to-end continuity of equipment in Metro cars.
- Preparing Weekly schedule of BMRCL project and BMRCL progress report.