تخطي إلى المحتوى الرئيسي
Abdul Gafoor

Abdul Gafoor

Electrical Engineer

كفاءة
Doha, بَلَدِيَّة اَلدَّوْحَة0عضو منذ ٢٨ مارس ٢٠٢٢
·

وظّف هذا الشخص

أرسل عرض عمل مباشرة لهذا المرشح

نبذة

I am a qualified trained and experienced QCCD, MMUP/UPDA & Kahramaa LOA Certified Electrical Engineer who has got more than 10 years of rich & extensive experience in various Construction Projects of different Sectors viz., Kahramaa Substations(Loss Prevention), QRail & High Rise Building, etc in Qatar and India

الخبرة

WORK EXPERIENCE

Project Engineer

 Al Majed Technologies, May 2018 – Present Now

Project Milestones

QATAR GENERAL ELECTRICITY & WATER CORPORATION

CLIENT -KAHRAMAA

MAIN CONTRACTOR-LARSON & TUOBRO CONSULTANT-TRACTEBEL

PH13 -132/11kV OLD AIRPORT-2 SUBSTATION

PH13 -132/11kV AL WAJBAH SUBSTATION

PH13 -66/11kV DOHA INDUSTRIAL-F SUBSTATION(UPGRADE)

PH13 -132/11kV AL ASMAKH SUBSTATION

PH13 -66/11kV Al SADD-2 SUBSTATION

PH13 -132/11kV Al FROOSH-2 SUBSTATION

PH13 -132/11kV Al DAAYEN-2 SUBSTATION

PH13 -66/11kV KTS SUBSTATION

KMCC-AMI CENTER(AL-THUMAMMA)

QATAR GENERAL ELECTRICITY & WATER CORPORATION

CLIENT -KAHRAMAA

MAIN CONTRACTOR- BEST & BETAS CONSORTIUM CONSULTANT- ENERGOPROJEKT ENTEL LTD

PH13 -132/11kV OLD AIRPORT-2 SUBSTATION

PH13 -132/11kV AL WAJBAH-2 SUBSTATION

PH13 -132/11kV AL ZUBRAH SUBSTATION

ASHGAL (PUBLIC WORKS AUTHORITY)

CLIENT -ASHGAL

MAIN CONTRACTOR-BOOM GENERAL CONTRACTORS CONSULTANT-ROYAL

NEW OFFICE AND CAR PARK FOR ASSET AFFAIRS

  • Develop and implement effective fire protection designs for compliance with fire codes, standards and regulations.
  • Installation of fire protection systems based on the hazard and occupancy and as per the requirement of QCDD/NFPA.
  • Preparation of entire BOQ for the project based on the approved Dwg 
  • Installation, supervision and T&C for the fire alarm systems FM200, fire detection system Deluge & sprinkler system and Fire pumps.
Resolving any unexpected technical difficulties at the project site and other problem that may raise, with the proper coordination to the concerned head.
  • Attend meeting at the project site or off-site to address the concerns of architects, engineers, construction managers, and subcontractors.
  • Check and verify all the installation of, materials and equipment are ready at the project site and coordinate necessary site inspections with the consultant.
  • Preparing isometric and shop layout drawings for firefighting system and detection systems.
  • Estimating project scope and procure the materials for the firefighting system include mechanical and electrical.
  • Monitoring the daily progress and reporting to the project manager regarding execution.
  • Identify and track all changes or potential changes to the project scope ensuring estimates of cost changes and schedule impact are given visibility with the client and project management.
    • Preparation and review of the As-built drawings in terms of any changes in the installation

Project Engineer

Argon Global Qatar (AUG’2014- APR’2018)

Project Milestones

Al Baker Tower-Electrical Engineer

Msheireb Downtown-ELV Engineer.

Qatar University-ELV Engineer

  • Responsible for installing, programming and testing/commissioning of Lighting Control system.
  • Tests & Inspects Jace Box, RB 2000, Controllers, Retractive Switches & Sensors.
  • Consistently attends work when scheduled and on time, follows instructions, responds to management direction and solicits feedback to improve performance.
  •  Attending meetings, writing reports and giving presentations to managers and client. Educating clients on the usage of various security equipment’s provided by the company.
  • Complete necessary documents as per the company policy & maintain the records by documentation installation.
  • Preparation of Workshop Drawing and Material submittal for consultant approval.
  • Preparation of Daily & Weekly program based on one month look ahead program.
  • Preparation of the detailed Site quantities requirement based on the consultants’ approved drawings.
  • Troubleshoot damaged or faulty installed fire protection systems.
  • Schedule all preventive maintenance for completed projects

MEP Engineer

Utility Tech International, Qatar (JUN’2013- AUG’2014)

Project-Q RAIL (Red LINE) - MEP Engineer.

  • Construction Supervision of all electrical, mechanical, fire Alarm and Air conditioning works.
  • Assisting the Project Manager in the Project Work from the beginning stage till the submission.
  • Preparation, execution & monitoring, testing & commissioning of all MEP systems like HVAC, Plumbing & Electrical low current system as per the compliance with plan, shop drawing Specification, Standard and schedule.
  • Coordinating and supervising the installation work of electrical items.
  • Checking the contractors' As-built electrical drawings for adequacy.
  • Monitoring and controlling the day-to-day activities of the electrical inspectors i.e., site work 
  •  inspection as well as inspection of the materials delivered in Contractor’s store.
  • Ensuring that inspections are carried out in time and quality of installation and delivered 
  • materials are maintained as per the relevant specifications/ standards as well as relevant local
  • Authority’s regulations/ requirements
  • Attending meeting on sites, project reporting, site coordination and Team supervision.
  • Reviewing and reporting of the project status.
  • Execution of the project engineering involving Delivery, Installation of Cast Iron Drainage Pipes, Coupling, support system, inspection &Leak testing.

Junior Engineer

BEML LTD, INDIA (JUN 2011-APR 2013)

Project-METRO RAIL PROJECT (BANGALORE METRO) 

  • Responsible for maintaining and repairing heavy equipment required in the day to day working.
  • Analysis of machine failures & Estimation of maintenance cost.
  • Maintenance of welding machine/ Maintenance of lathe machine.
· Testing and analyzing the dielectric strength of the cables used in the metro cars.

· Testing and commissioning of Electrical Equipment including Meggering.

· Participating in audits and reviews of testing, highlighting areas for improvement.

· Drawings and documentation updates & Responsible for executing test cases, documenting results and defects.

· Attending meetingson site& Preparation of Electrical procedures for installationtest & Commissioning.

  • Studied and analyzed the Braking system performance of the metro cars. Electrical wiring in brake electrical control unit cubical. Checking the end-to-end continuity of equipment in Metro cars.
  • Preparing Weekly schedule of BMRCL project and BMRCL progress report.

التعليم

Anna University 

BE in ELECTRICAL & ELECTRONICS ENGINEERING Graduated First Class

2011

Diploma in Electrical CAD

UPDA accredited Engineer (License No:10824) from Ministry of Municipality and Urban Planning.

Qatar Civil Defense, QCCD certified Engineer with Fire Alarm as Major.

Kahramaa Approved LOA Holder in Substation Loss Prevention System.

التقييمات

ذات صلة