Hussam Baraki
Technical and Design Manager
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
I am a professional engineer working in construction field for more than 24 years, currently working as technical and design manager for Vinci Qatar with project value more than 900 million US Dollars.
With my balanced and blended experience, interpersonal, technical, Design and managerial skills, I should be able to manage and coordinate all technical, design and construction activities in projects from the design to operation. I can be an advisor in the field as well.
الخبرة
QDVC (Qatari Diar Vinci Construction)Starting from 10 Feb 2021 till presentProject NameDevelopment of Doha Air Base Project InformationThe Development of Doha Air Base Project – located within the boundary of the Old Doha Air Base &
• Doha International Airport (DIA)- is an expansion of the Old Doha Air Base for the use of the Qatar Emiri Air Force (QEAF), this project is classified. Position Technical &
• Design ManagerDuties
- Conduct and coordinate the detailed design, methods, workshop drawings, temporary works, for Own Works and Subcontractor works and oversee the performance of the Independent Checking Engineer (ICE).
- Coordination and liaison with the Stakeholder Manager taking into consideration the Stakeholders input data and/or regulation.
- Review technical reports related to resolution of technical issues, Value Engineering, design optimization and variations as requested by the Employer.
- Review interface progress with focus on interfaces (including those process related) in relation to technical matters, program/progress to ensure that interface issues are addressed and resolved in line with targets and expectations.
- Issues and update the change management report and notifies the Project Director and the Contract Manager on weekly basis.
- In coordination with the Project Planner, to provide weekly/monthly reporting on the status of design, interface, construction documentation (shop drawings, as- built, submittals) for Project Director's review and information.
- Coordinate and liaise with the Project Director and Construction Manager. In relation with the Construction Manager, to prepare and take into consideration the required handing over from (or back) to the Employer or any third party.
- Review and selection of the work methodologies.
- Supervise the Independent Checker performance.
- Monitor the progress of the technical team.
- Monthly reporting on the results provided by the Cost Control. Report monthly on the cost spent versus budget earned value.
- Setting-up a series of KPI for monitoring the efficiency of its sections.
- Compliance of the works activities with the QHSE and the Contract requirements.
- Key choices on design and methods organization, software, equipment, resources.
- Within the overall program, preparation and approval of the design and methods programs of deliverable.
- In liaison with the Project Director, issues the proposed budget of the Technical Department for his approval.
- Issues the subsequent follow-up versions of the budget.
- In liaison with QS control and valid monthly progress raise alert on risk, opportunities, of Design Consultants/ICE claims.
- In liaison with QC control and valid NCR, FCR, Method changes request, when the technical matters are involved.
- In liaison with HR department, prepare mobilization and demobilization of technical staff schedule.
- Regularly review and update Design and Method Staff & resources requirement.
- Initiating Engineering's value (documented by cost comparison, method drawings) and support construction cost saving or harmonization requirement.
- Approve the permanent works detailed design and the works methodologies.
- Organize and manage as built design packages.
- Keep an up-dated library of standards and regulations applicable to the contract.
• Design Manager/ Deputy Project Manager
Duties- Monitor the progress of the technical team.
- Supervise the Independent Checker performance.
- Coordination and liaison with the Stakeholders.
- Follow up all the technical and design issues and submittal with the client representative (the engineer), on daily basis or on weekly basis (technical meeting).
- Conduct and coordinate the detailed design, methods, workshop drawings, temporary works, for Own Works and Subcontractor works and oversee the performance of the Independent Checking Engineer (ICE).
- Review technical reports related to resolution of technical issues, Value Engineering, design optimization and variations as requested by the Employer.
- Issues and update the change management report and notifies the Project Director and the Contract Manager on weekly basis.
- In coordination with the Project Planner, to provide weekly/monthly reporting on the status of design, interface, construction documentation (shop drawings.
- Monthly reporting on the results provided by the Cost Control. Report monthly on the cost spent versus budget earned value.
- Setting-up a series of KPI (Key Performance Indicators) for monitoring the efficiency of its sections
- In liaison with the Project Director, issues the proposed budget of the Technical Department for his approval.
- In liaison with QS control and valid monthly progress raise alert on risk, opportunities, of Design Consultants/ICE claims.
- Initiating Engineering's value (documented by cost comparison, method drawings) and support construction cost saving or harmonization requirement.
- Organize and manage as built design packages.
• Mixed Used development project. (VB01)- The Pearl Qatar
Project Information- Viva Bahriya Development is a mixed-use development in Pearl Island on Plot # VB-01, Viva Bahriya. The project includes the following parcels:
- Parcel 1 Hospitality Component: Beach Resort (two towers 25 stories).
- Parcel 2 Residential Component: private villas 10 numbers.
- Parcel 3 Mixed Use Component: Retail, Residential Tower and Serviced Apartments Tower.
- Parcel 4 Mixed Use Component: Retail &
• Residential Tower
- Parcel 5 Hospitality Component: Floating Restaurant
- The project has approximately 272,776 m2 of BUA.
- The client: Ushaiger Holding, The Designer: AE7.
- The Project Manager: Hill International.
- Project Value is 2400 million QAR.
- Perform design reviews throughout the design process from conceptual design through schematic and detailed/contract documents and prepare the design review reports.
- Monitor the development of the overall design process from conceptual design through schematic and detailed/contract documents.
- Assist the Project Director ensuring the desired project objectives are delivered
- Assist in the RFP process for prequalification of architectural/engineering services and participate in the negotiation of design contracts.
- Assist in responding to questions and queries raised during the tender period.
- Review proposals received from the vendors, evaluate content, and prepare a report for the Team Management to make recommendations to the Client.
- Monitor submittals by the design consultants to obtain approvals and permits necessary by all regulatory agencies and local authorities having jurisdiction.
- Implement the Design to Budget requirement in all appropriate RFP’s and contracts for design services.
- Monitor the dissemination of design information among the Program Team.
- Attend the design review and co-ordination meetings with other consultants appointed by the Client and prepare & distribute the minutes of meetings.
- Assist in the design change management as may be required.
- Attend weekly monthly, the design co-ordination meetings with the Client and/ design consultants appointed by the Client along with the works contractor and supplier / vendors appointed by the Client.
- Manage interdependencies and coordination across projects.
- 3 Buildings B1, B2 & B3, External Services & Landscaping.
- The client: Energy City.
- The Designer: ABS International.
- The Project Manager: Energy City Project management.
- Target LEED Rating: Gold, BIM: 3D/4D/5D Modeling.
- Project Value is 508 million QAR., Overall Built-up Area is 76854 m2.
- Manage all the technical works: (Material Submittals, Shop Drawings, RFI’s, Method Statement, etc…), in house and by subcontractors/ supplier.
- Follow up all the finishing works on the site.
- Follow up the construction progress and timing schedule.
- Starting from 21 December 2013 till 1 Dec 2017
- Main Building B+G+2 Floors, Workshop Building G+1, External Services & Landscaping.
- The Client: Qatar University.
- The Designer: MIMAR Consultant.
- The Supervision Consultant: Khatib & Alami.
- Target QSAS Rating: four stars.
- BIM: 3D/4D/5D Modeling, Prolog document control system.
- Project value is 509 million QAR.
- Overall Built-up Area is 76605 m2.
- Manage all the Technical works Material Submittals, Shop Drawings, RFI’s, Method Statement, etc…), in house and by subcontractors/ supplier.
- Follow up all the finishing works on the site.
- Follow up the construction progress and timing schedule.
- Starting 1st February 2009 till 20 December 2013
The Client: NDIA (New Doha International Airport) recently changed to HIA The Project Manager: Parsons.
The Consultant: HOK.
The project is part of new Doha International Airport Terminal (North Node , Concourse D & E) and it is joint venture with B-Six (Six Construct).
DurationFebruary 2009 till September 2010Project NameThe School of Foreign Service Project (Georgetown University)Project InformationThe Project Value: 1100 million QAR The Client: Qatar Foundation.
The Project Management: Qatar Petroleum (ASTAD Qatar)
The Consultant: KEO International.
The Designer: Legorreta & Legorreta
PositionProject Coordinator (Sr. Technical Engineer)Amana Contracting April 2005 till February 2009DurationFebruary 2008 till February 2009Project NameHigh school of Business (Qatar University)Project InformationThe Project Value 176 million QAR.
The Client: Qatar University.
The Consultant: Arab Architects
PositionSenior Project ArchitectMetra Decoration U. A. EDecember 2003-April 2005DurationDecember 2003-April 2005Project Name-Restaurants and Shops:
McDonalds Restaurants at Al-Raqa street (Dubai - UAE), Chilies at Al Ghorair Centre (Dubai - UAE), Al Tazaj Restaurant at Al khuair (Muscat- Oman), Theory & Onassis at Emirates Towers (Dubai - UAE).
ABU DAHBI Commercial Bank (Sharjah Branch).
Project InformationInterior Decoration from block works to key including MEP works. (Fit-out)PositionProject EngineerArchitectural Unit (Damascus, Syria) Designer & ArchitectsFebruary 1999 till December 2003Project Name and Information- The East Park of Damascus :( Restaurant, Cafeterias, Cafe shop Net, Cinema, Playground, Amusement, Park, Zoo ground, Rosary, Public ground and Ballpark ( 340,000) m2
– FIFA Office: (The Head Office of FIFA in Damascus SYRIA)
– Sheik-Bader Hospital: Two hundred and seventy beds (B1+G+3 floors) Tartous – Syria
- The Provision Administration Building: (2B + G + 6 Floors) (SWEIDA – SYRIA)
– The Laboratories Building of Faculty of Science for Damascus University. (2B + G + M + 7 Floors)
– The Head Office of Sports Union (B1+G+2 floors) AL-Hassakeh – Syria.
– Sports Hall :(The restoration and renovation of the sports hall of Duma, Syria)
- The Ministry of Transportation: (Second prize in the contest of the Ministry of Transportation in SYRIA) (B1+G+10 floors)
– Al Hassakeh Hospital: restoration of the hospital
PositionArchitect (Designer in The Development Team)DutiesDevelop the Design, Issue the IFC Drawings and Following up technical issues with the Client.
التعليم
BSc. Bachelor of Science in Architectural Engineering, Damascus University (SYRIA).
UPDA Grade A: Architect Engineer (Architectural Engineering) no – 8227-
Member of Syrian Engineers Syndicate
PMP, Autodesk certified Revit, Naviswork, AutoCAD, 3D Max
