Irfan Ismail
Piping Engineer
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
I have over 14 years of experience in Piping Design, Piping Stress Analysis, and Piping Material, with strong technical skills and expertise in project coordination. I am deeply motivated by my work in FEED and Detailed Engineering Design across Wellhead and Topside Platforms Offshore, LNG Plants, Oil & Gas Plants, and Petrochemical Plants. Proficient with international piping codes and standards such as API, ANSI, ASME, DIN, etc., I excel in delivering high-quality engineering solutions.
الخبرة
Piping Engineer at PT. JGC Indonesia (2025 – Present)
Detailed Engineering for Piping Stress Analysis, Loading Data to Structure, Pipe Supports for LNG Tangguh UCC Plant at Papua, Indonesia. The Piping Stress Calculation for Piping Layout area are
- Air Cooler Heat Exchanger
- PSV's of K O Drum Vent
- PSV's of STG (steam Turbine Gas)
- CO2 Compressor
- To Piping Stress Calculation point of view due to Static (thermal, pressure, seismic displacement), Slug flow, Surge Flow, Two phase flow, Piping Vibration assessment and Piping Stress Calculation due to Transportation case
Piping Engineer at PT. Meindo Elang Indah (2023 – 2025)
- Created Detailed Engineering for Piping Stress Analysis, Piping Loading Data, Pipe Supports for Wellhead Platform Offshore such as Jacket and Topside Platform for six new platforms consist of WPS4, WPS5, WPS6, WPN5, WPN6, WPN7 and WPN8 as host Platform in Sisi Nubi, Kalimantan, Indonesia.
- Flowline, Production and Test Manifold, MPFM Stress Analysis.
- Fuel Gas System and Fuel Gas Distribution Stress Analysis.
- Vent/Closed Drain Pump Stress Analysis.
- Fire water system Stress Analysis.
- Develop AIV and FIV Analysis at Piping system due to X-mass tree of wellhead displacement.
- Created Finite Element Analysis for Jack Screw Flange by Ansys.
Piping Engineer at PT. Enviromate Technology International (2021 – 2023)
- Develop Plot plan, Piping layout, Data sheet and Piping Stress Analysis for TPPI Olefin Complex Development Project owned by PT. Kilang Pertamina Internasional.
- Assisted Sea Water Intake Design and Piping Stress Analysis.
- Piping Stress Analysis and Design for N2 package, Interconnecting Lines and Tank Farm area.
Piping Engineer at PT. Inti Karya Persada Tehnik (2019 – 2021)
LUMUT BALAI GEOTHERMAL PROJECTS
- Develop Plot plan, Piping layout, Data sheet and Piping Material for Lumut Balai Project which Fluid Collection Reinjection System (FCRS) with the net capacity voltage terminals of 55 MW owned by PT. Pertamina Geothermal Energy
- Assisted Piping layout to prepare MTO, BOQ, Requisition and Technical Bid Evaluation Piping Fluid Collection Reinjection System (FCRS)
Piping Engineer at PT. Inti Karya Persada Tehnik (2017 – 2019)
SYNTHETIC RUBBER INDONESIA PLANT PROJECTS
- Develop Piping layout meet requirement of safety process (HAZOP).
- Perform Piping loading data info to Civil Structures.
- Create Piping Stress Calculation Report at Tanks Farm, Compressor, Pump.
- Perform Piping Data Sheet such as Spring hanger, strainer, Flexible Joint, etc.
Piping Engineer at PT. Inti Karya Persada Tehnik (2015 – 2017)
SUBAN COMPRESSION PROJECTS
- Develop Plot plan, Piping layout, Piping Supports, Data sheet and Piping Material for Suban Compression Project which two Condensate Stabilization Trains (Stabilization Train1 and Train 2) owned by Conoco Phillips.
- Assisted the Piping loading data and Piping Stress Analysis.
Piping Engineer at PT. Petrofac IKPT International (2013 – 2015)
BANYU URIP PIPELINE PROJECTS
- Develop Pipeline along 72 kilometers at Banyu Urip Project which export pipeline slurry to CPP Plant owned by Exxon Mobile Inc.
- Created Piping Layout, Piping Supports, Loading Data, Piping Stress Report, Estimation MTO and BOQ, Data Sheet, Material Requisition, Technical Bid evaluation for the Export Slurry Piping of approximately 72 kilometers of NPS 20 inches.
Piping Engineer at PT. Petrofac IKPT International (2011 – 2013)
TURKMENGAS PLANT PROJECTS
- Develop Plot plan, Piping layout, Piping Supports, Data sheet, Piping Material and Piping Stress Analysis for Turkmengas Plant.
- To Reviewing the Design Sizing for Boiler Area including impacted of the Design Change Notice. Checking Material Data Sheet in PDS including reporting Material Status for Modelling 30%, 60% and 90% review.
Piping Engineer at PT. Petrofac IKPT International (2010 – 2011)
EL-MERK REFINERY PLANT PROJECTS
- Develop Plot plan, Piping layout, Piping Supports, Data sheet, Piping Material and Piping Stress Analysis for Central Processing Facility El-Merk Project owned by Sonatrach Petroleum Company.
- Assisted the Piping Layout, Piping Support standard.
التعليم
B.Sc. in Mechanical Engineering – Institute of Technology Sepuluh Nopember (1992 – 1992)