Abdalla Ali
IFM Facilities Manager
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
IFM Facilities Manager with over 24 years of experience in Facilities Management, MEP, Asset Management, Landscape & Irrigation & Smart Irrigation and Mega Projects Operations. Highly experienced in managing Integrated Facilities Management (IFM) services including Hardscape, Landscape, Irrigation, CAFM / CMMS, and full Asset Lifecycle Management. Strong leader and decision-maker with a proven record in SLA, KPI, HSE, sustainability, contract compliance, and operational excellence.
الخبرة
IFM Facilities Manager at MAG (2024-10 – Present)
Project of Visitor Pavilions - King Salman Park/ Riyadh
- Strong decision-maker with managerial skills, as well as trouble shooter and implement practical solutions
- Lead all Integrated Facilities Management activities in line with client and contract requirements.
- Manage MEP, Landscape, Hardscape, Irrigation, Security, and ELV systems across the Visitor Pavilion facilities.
- Operate and optimize Smart Irrigation Systems to ensure efficient water usage, zero leakage, and healthy landscaping
- Manage Hardscape elements such as walkways, pavements, planters, and external structures, ensuring safety, durability, and compliance.
- Sustainability & Water Optimization
- Enhanced site appearance and client satisfaction through proactive landscape management.
- Develop and execute preventive and corrective maintenance plans for all assets and for irrigation and land scaping.
- Manage Asset Register, Asset Tagging, Condition Monitoring, and full Asset Lifecycle Management.
- Monitor and enforce SLA, KPI, HSE, and environmental compliance for all contractors.
- Conduct regular inspections, close snags, and maintain high operational standards and prepare technical, operational, and performance reports for management and clients.
- Support budget planning, cost control, and contract optimization.
- Enforced company policies and guidelines for all employees.
- Motivated management and staff teams to consistently deliver high quality, customer-focused service.
- Oversaw facility maintenance and allocated needed resources to meet standards.
Project Manager / Mobilization Manager at Safari (2019-10 – 2024-10)
A- Project of Sportage Boulevard Foundation (SPF) / Riyadh B- Project of Crown Prince Farm (BO5) Dariya / Riyadh C- Project of King Abdalla Palace / Riyadh D- Project of King Fasil Hospitality Palace / Jeddah
- Managed testing, commissioning, and handover of all MEP, irrigation systems
- Prepared detailed commissioning reports, to ensure operational efficiency, reliability, and readiness of all systems before project handover.
- Developed Asset Registers, CAFM data, and FM mobilization plans for operational readiness.
- Implemented preventive maintenance strategies across all disciplines including irrigation and landscaping
- Manage MEP, Landscape, Hardscape, Irrigation and ELV systems across all projects
- Sustainability & Water Optimization
- Managed teams and subcontractors to maintain high service quality and client satisfaction.
- has extensive experience with all mechanical and electrical systems, as well as security and safety systems, and irrigation and landscaping.
- Evaluated staff performance, implementing training and development programs to maintain exceptional service levels
- Motivated management and staff teams to consistently deliver high quality, customer-focused service
- Oversaw facility maintenance and allocated needed resources to meet standards
- Enforced health, safety, and COVID-19 precautionary measures
Project Manager at Arabian service (2018-11 – 2019-10)
A- Project of Ministry of Education / Riyadh B- Project of Maternity and Children Hospital/ Hafer Al-Batten
- Led handover and FM mobilization for Maternity & Children Hospital.
- Studied contracts, appointed subcontractors, prepared snag lists, and calculated consumables and operational requirements.
- implementing maintenance plans & schedules for periodic preventive maintenance for all departments of the project of Ministry of Education.
- Used project management tools and techniques for positive, successful outcomes.
- Organized continuous facilities cleaning, minimizing risk and maintaining professional appearance.
Site Manager at Zahran (2010-12 – 2018-12)
A- Project of King Khalid Eye Specialist Hospital / Riyadh. B- Project of King Saud Medical City / Riyadh
- Oversaw facility maintenance and allocated needed resources to meet standards.
- Led and managed administrative staff to maintain smooth daily operations.
- Manage MEP, Landscape, Hardscape, Irrigation and ELV systems across all projects
- Sustainability & Water Optimization
- Maintenance of all machines and Diesel Generators (MTU16V4000G81, Perkins, Duets, Kohler, Cummins), Operation & troubleshooting (Mechanical, electrical), Periodic preventive maintenance schedules
- Applied and following the CABHI and NFPA standard.
- Supervising the implementation and receipt of the new project at the site:
- 1- Air conditioning projects where the installation of 15 chillers 80 tons,1267 fan coil unit, size (467 cfm, 568 cfm) and replacing old chillers with 10 Trane chillers with a capacity of 400 tons and 3 secondary pumps 75 kw,6 primary pumps 15 kW for the pump and 67 air handling units.
- 2- The project of sewage plant capacity of 600 m3 and water storage tank 900m3
- 3- The project of Al Rajhi Diabetic Building and all related systems.
- 4- The project for fire extinguishing alarm was the Installation of a fire station of 2fire pump capacity 1500 gpm-150 psi and Jockey pump capacity 50 gpm-150 psi,10000 wireless smoke detectors,12 escape ladders, 30 firehouses cabinet and 5 fire hydrants
- 5- The project of replacement and renewal of medical gas network of the hospital where the installation of 2 vacuum machine each machine 2 pump and 2 screw compressor and installation of Oxygen Manifold and Nitrous Oxide Manifold as backup and test for the all-medical gas network in as per CBAHI requirements.
- 6- The project of replacement and renewal of steam boilers where the installation of2 steam boiler Viessman 2,3 ton\h - 18,5 bar Germany-water tube - diesel burner and the implementation of accessories of water treatment system and diesel pumps.
- 7- The project for the renovation of the central sterilization department as per CBAHI and diesel pumps.
- 8- Review the drawings of future projects with 100,000,000 riyals for the establishment of 35 villas, garden and industrial lake and 2 buildings of 2 bedrooms and 2 buildings of 3 bedrooms and 4 backup generators
Electro-Mechanical Engineer at Set core group (2001-10 – 2010-11)
- Supervising the installation of the yarn production line in all different stages according to the approved plans and schedules according to the international code
- Supervising the installation of 3 gas generators (Waukesha VHP) with main ATS station.
- Establish maintenance and operation schedules for utilities of the factory as the maintenance catalogues of every machine-like air-conditioning station and main and sub power stations as well as backup gas generators (Waukesha VHP).
- Inspecting and repairing daily problems resulting from operation and replacement of damaged spare parts in a correct and approved way.
- Request spare parts and consumables for all machines of all departments of the factory
- implementing maintenance plans & schedules for periodic preventive maintenance for all departments of the factory
- Hydraulic and pneumatic circuits, hydraulic presses and Hydraulic machines, Compressors, troubleshooting, Periodic preventive maintenance schedules.
التعليم
Mechanical Power Engineer in Mechanical Power Engineering – El-Menoufia University (2001)
