تخطي إلى المحتوى الرئيسي
Abdelmonem Kheder

Abdelmonem Kheder

ELECTRICAL CONSTRUCTION ENGINEER

كفاءة
Riyadh, منطقة الرياض‎عضو منذ ٩ فبراير ٢٠٢٦
·

وظّف هذا الشخص

أرسل عرض عمل مباشرة لهذا المرشح

نبذة

HAVE GOOD EXPERIENCE IN ELECTRICAL WORK

الخبرة

) ( BLACK GOLD MUSEUM BGM PROJECT)

  • Review drawings
  • Lead the supervisors and foreman for site work
  • Materials takeoff for all site work activities as per the approved materials
  • Construction site work for (LIGHTING CONTROL LCP ,CBS )
  • Construction site work for (FIRE ALARM , VOICE EVACUATION )
  • Construction site work for (TELECOM )
  • Construction site work for (ACCESS DOORS , CAMERA )
  • Construction site work for (BMS )
  • Coordinate with QC for inspections
  • Following the procurement to deliver materials
  • Use the available resources to achieve the target
  • Coordinate with all disciplines ongoing work

2- Gulf co-operation symbol (GCS) since (11/3/2014 ) up to (1/5/2022)As

Senior Site Electrical construction Engineer ( KSA)

  • 10 Schools Dammam project Superintendent Engineer (Feb 2022 up to now )

TBC Client

  • Approval for Drawings
  • Approval for Materials
  • Lead and Coordinate with subcontractors for ongoing activities
  • Reporting the ongoing activities
  • Submitting invoices to Client
  • Coordinate with testing and commissioning teams
  • Work progress reporting
  • Lead and Coordinate with Engineers at site
  • Planning for the site work
  • Managing the manpower
  • Following up with supplier the delivery for materials
  • Revising BOQ
  • As built drawings
  • MARJAN PROJECT (TCF PROJECT our client tecnicas reunidas TR

)Aramco site

1- Managing manpower and materials

2- Lead the team in site to achieve our target

3- Coordinate with client the work progress

4- Following the procurement to deliver materials

5- Following the suppliers to deliver the materials

6- Use the available resources to achieve the target

  • HARADH PROJECT Aramco site :

1- Temporary facilities (11 GCP sites offices + camp + laydown)

under TR company

2- Loads calculations design for panel board, cables and generators

3- calculations for voltage drop

4- Generators synchronization

5- Fire alarm work in all temporary facilities

6- Electrical quantities surveying

7- Requesting the materials and follow up with vendors the delivery

8- Manage Electrical team in site to complete all related electrical work

9- Coordinate Electromechanical work in site

FADHILI project

  • Temporary facilities (sites offices + camp + laydown) under TR company
  • Pre engineering Building project
  • Materials Submittal and approval
  • Engineering work
  • Construction site work
  • Lighting and power work
  • Fire alarm work
  • Grounding and lightning work
  • PETROFAC PROJECT
  • (SUBSTATION, PIB, LAB ,OME) precast buildings under Aramco
  • Lighting and power work
  • Fire alarm work
  • Grounding and lightning work
  • Transformers installation
  • Power Cable trays installation
  • SADARA project :
  • Materials Submittal and approval
  • Engineering work
  • Construction site work
  • Lighting and power work
  • Fire alarm work
  • Grounding and lightning work
  • Shop drawings red line modifications and technical quires
  • Mcc substation buildings
  • Control buildings
  • Team buildings
  • Operating buildings
  • Generator building

3- Mobarak Merai Al-salomi in KSA company (Site Engineer )

  • (street lighting) in Alahsa – Alhofof (from 9/8/2011 to 6/10/2012)
  • Projects sites(Al-taraf alganoby - Morietba - Al-sieh – Al-Uqair)
  • Design street lighting work and
  • Quantities surveying
  • Following projects with municipalities and electric company

(SCECO).

  • Streets lighting (lighting poles - cables – lakes - Electrical

)distribution boards

4- The Egyptian Company for Engineering consulting ( Infra Group)

El-ean Elsokhna (from 9/8/2009 to 1/8/2011)

  • Reviewing Electrical Designs relating to site works.
  • Executing Electrical works (Buildings – Shops- Health Club –

Treatment Station – Landscape)

  • Executing Networks (Low Voltage – Medium Voltage – Low

Current)

  • Installation Electrical Units (Boards – Transformers – RMU)

5- Elmotaheda for Contracting &Technology in Hurgada from (1/3/2009 to 1/5/2009)

  • Executing Electrical works in Site (Lighting – Power – low current )
  • Making Extracts and Quantity Tables.
  • Quotations for Electrical units.

التعليم

SUEZ CANAL UNIVERSITY

FACULTY OF ELECTRICAL ENGINEERING

التقييمات