Construction Manager - Menasco Contracting Company - Riyadh, KSA
(2025-07)
Project: Qiddiya Speed Park Buildings (Entertainment City Mega-Development)
- Overseeing all onsite and offsite construction activities from commencement to completion on one of KSA's flagship Vision 2030 entertainment assets.
- Leading MEP coordination across multi-trade subcontractors and vendors, aligning all disciplines to the master project schedule.
- Reviewing and enforcing compliance with KSA building and safety regulations; representing the company before owners, architects, consultants, and government authorities.
- Managing procurement schedules, scopes of work, subcontractor packages, purchase orders, and insurance compliance across all trade contracts.
- Chairing and attending all MEP management meetings; maintaining manpower histograms, labour budgets, and project milestone trackers.
Construction Manager - GISCO - Abu Dhabi, UAE
(2023-05 - 2025-06)
Project: The Royal Stables, Sector 52-2, Plot P35
- Directed all construction activities from mobilization through handover on a high-profile equestrian facility, coordinating MEP, civil, and architectural trades simultaneously.
- Controlled labor budgets and project milestones; managed subcontractor and vendor relationships to maintain programmer integrity.
- Enforced compliance with UAE building and safety regulations across all onsite operations; represented the company before owners, consultants, and government authorities.
- Administered full procurement cycle: purchase orders, subcontractor scopes of work, contract riders, and insurance compliance.
MEP Coordinator - Ultra Max General Contracting - Abu Dhabi, UAE
(2019-11 - 2023-04)
Projects: AWADH ALMENHALI Commercial Building | ABDULLAH ALMANSOORI Commercial Building | CMW-19207 C001, Zayed Military City
- Coordinated MEP works across three concurrent commercial and military-grade projects, managing sequencing, subcontractor allocation, and site logistics.
- Recruited, onboarded, and supervised the MEP coordination and maintenance team; conducted site walks, inspections, system testing, and fault diagnosis.
- Prepared project timelines, daily and monthly progress reports, and cash-flow forecasts; tracked market pricing and prepared subcontractor and client invoices.
- Drove organizational process improvements that increased quality, productivity, and cost efficiency across the portfolio.
Senior Electrical Engineer - Alkaline Electromechanical LLC - Abu Dhabi, UAE
(2018-05 - 2019-10)
Projects: KHALIFA ALDAHERI Commercial Building (E-14, C-27) | RASHID ALMANSOORI Commercial Building (W13-01, C8)
- Led all electrical works implementation, ensuring full compliance with project specifications, approved drawings, and ADDC regulations.
- Prepared electrical design calculations, drawings, method statements, and material approvals; managed authority submissions to ADDC, ETISALAT, ADCD, and ADMCC.
- Coordinated testing and commissioning for all electrical systems; managed closeout documentation and formal handover to consultant and client.
- Prepared variation orders, cost-saving studies, and value engineering proposals; analysed tenders and compiled BOQ quotations.
Senior Electrical Engineer - Commodore Contracting Company - Abu Dhabi, UAE
(2017-01 - 2018-04)
Project: Wafra Tower, Plot C5, Al-Reem Island, Abu Dhabi
- Managed all electrical works on a high-rise residential tower, overseeing team performance and submitting inspection requests to the consultant.
- Prepared ADDC-compliant electrical design calculations and drawings; coordinated authority approvals and managed supplier relationships for materials pricing and submittals.
- Conducted full testing and commissioning; led closeout documentation and formal project handover activities.
Senior Electrical Engineer - THERMO LLC - Abu Dhabi, UAE
(2014-07 - 2016-12)
Project: Etisalat Data Center Phase II, Khalifa City
- Delivered all electrical works on a mission-critical data center for Etisalat, including HV/LV distribution, UPS integration, and precision power systems — to full ADDC and authority standards.
- Ensured strict adherence to project quality plan, specifications, and scheduling targets; monitored the engineering team and managed inspection submissions to the consultant.
- Prepared method statements, material approvals, variation orders, and BOQ analysis for this technically complex, high-stakes facility.
Senior Electrical Engineer - Three Pyramids Electrical Contracting EST. - Abu Dhabi, UAE
(2011-08 - 2014-06)
Projects: Al Bustan Poultry Farms (Sweihan) | Abu Dhabi University Extension (CD39, 5C) | SAEED ALSHOBOSI Commercial Building
- Delivered electrical works across agricultural, institutional, and commercial project types, developing broad systems experience including LV distribution, low-current, and authority compliance.
- Prepared electrical calculations and drawings per ADDC regulations; managed testing and commissioning and led project handover and closeout activities.
- Built and coached site teams; coordinated MEP interfaces and subcontractor activities across all projects.
Project Electrical Engineer - Illumination Zone EST. - Abu Dhabi, UAE
(2007-01 - 2011-07)
Projects: Afghanistan Embassy (Embassies District) | Al Utaiba Mosque (Al Zaab) | Royal Hotel (Mariam Al Rmaithy) | Commercial Buildings x2
- Managed daily, weekly, and monthly electrical activity programmers aligned to construction schedules; directly supervised site teams on LV, low-current, and commissioning works.
- Coordinated electrical, mechanical, and civil works interfaces and subcontractor activities; maintained safety, health, and environment compliance to minimize risk.
- Conducted executed work surveys, measurement sheets, work inspections, insulation testing, and final testing and commissioning.