Eng Mohamed Ghonim
Chief Surveyor
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
Results-driven Chief Surveyor with 16+ years of experience in engineering surveying, infrastructure projects, sewage networks, quantity surveying, and technical team leadership. Proven track record across Saudi Arabia and Egypt with leading firms including Al-Qudra Company, AFG (British), Orascom Construction, and Arab Contractors. Expert in AutoCAD, Civil 3D, Arc GIS, Total Station, and GPS systems.
Adept at managing full project lifecycles, leading surveying teams, ensuring compliance with engineering standards, and delivering projects on time and within budget.
الخبرة
Chief Surveyor – Sewage Networks at Al-Qudra Company (2025-03 – Present)
Project: Design and implementation of a pumping station and transmission line from Jeddah Airport Pumping Station to the Eastern Forest – Hadi Al-Sham Road, Jeddah.
- Lead GIS specialist responsible for all geospatial data collection, mapping, and analysis related to sewage network design and implementation.
- Manage and supervise all on-site surveying crews, overseeing their daily operations, task assignments, and quality of deliverables.
- Responsible for preparing, reviewing, and submitting all surveying deliverables to the consultant, ensuring full compliance with project specifications.
- Coordinate between surveying teams, design engineers, and the consultant to ensure accurate and timely implementation of the transmission line and pumping station works.
- Utilize Arc GIS to produce detailed infrastructure maps and spatial analysis reports supporting project decision-making and consultant approvals.
Chief Surveyor at AFG British Company (2023-03 – 2025-03)
- Lead and manage surveying and quantity estimation operations for large-scale infrastructure projects.
- Analyze and review engineering drawings and plans to accurately estimate material and labor requirements.
- Prepare bills of quantities (BOQ), technical reports, and financial proposals for project bidding.
- Collaborate with design and engineering teams to ensure accuracy and compliance with specifications.
- Monitor project costs against planned budgets to maintain financial control and reporting.
Chief Surveyor / Surveyor at Shabl Al-Gharahid Engineering Works Office (2021-02 – 2023-03)
- Supervised full project implementation in accordance with approved engineering plans and specifications.
- Prepared and submitted periodic technical reports to clients and senior management.
- Coordinated with clients and field teams to ensure accurate and timely execution of works.
- Evaluated and maintained engineering structures and infrastructure to ensure quality standards.
- Provided technical consultations and on-site problem-solving to overcome project challenges.
Quantity Surveyor at Al-Wasat Engineering Contracting Company (2019-11 – 2021-02)
- Prepared comprehensive bills of quantities for materials and equipment across multiple projects.
- Reviewed and calculated project costs to ensure alignment with approved budgets.
- Coordinated with suppliers and subcontractors to secure and schedule project resources.
- Analyzed engineering data using specialized software to manage and report quantities.
- Delivered accurate financial reports to management to support decision-making.
Surveyor at Arab Consulting Engineers (Moharram Bakhoum) (2017-01 – 2019-10)
- Conducted topographic measurements and accurate field surveys for civil and infrastructure projects.
- Prepared topographic maps and engineering drawings using AutoCAD and Civil 3D.
- Operated modern surveying devices including Total Stations and GPS equipment.
- Supervised ground level adjustments and quality control of all surveying works.
- Submitted regular progress reports to project management.
Quantity Surveyor at Al-Haqbani General Contracting Company (2015-05 – 2017-01)
- Prepared quantity estimates and cost analyses for diverse construction projects.
- Developed cost-saving solutions within approved project frameworks.
- Used engineering design software to analyze project data and quantities.
- Reviewed work plans to ensure availability of materials and resources.
- Produced comparative reports between planned and executed quantities.
Surveyor at Arab Contractors Company (2014-12 – 2015-04)
- Executed ground surveys for civil, infrastructure, and construction projects.
- Prepared precise surveying reports for boundary adjustments and level control.
- Coordinated with construction teams to ensure works were consistent with approved plans.
- Provided technical support and guidance to site contractors.
Surveyor at Orascom Construction Company (2013-12 – 2014-12)
- Prepared and uploaded survey plans for lands and development projects.
- Used modern technologies for point determination and distance calibration.
- Monitored field implementation in accordance with survey data and project requirements.
- Submitted field reports to management on accuracy and quality of surveying works.
- Supervised safety instruction compliance during all surveying operations.
Surveyor at Power Contracting Company (2012-11 – 2013-12)
- Implemented surveying works to determine land boundaries, levels, and topography.
- Prepared topographic drawings and digital maps using AutoCAD.
- Monitored and adjusted site measurements using modern surveying equipment.
- Trained junior technicians on the proper use of surveying instruments.
التعليم
Diploma in Surveying – Irrigation and Drainage Department (2010)


