
Mohamed Saeed
Chief Surveyor
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
Results-oriented Surveyor with expertise in LAND surveys. Knowledgeable about applicable codes and regulations and able to operate well in both team and self-directed capacities. Excellent communication, problem-solving and planning skills.
Driven
Surveyor with experience managing varied project portfolios to cost, quality and timescale targets. Coordinates client and contractor communications to facilitate project momentum. Proactive and self-motivated for positive independent and team working.
Seasoned
Surveyor with 21 years in land surveying. Utilized GPS and GIS technologies and laser scanners to gather measurements and prepare maps and reports on legal boundaries and topographical characteristics of lots. Focused on providing complete and accurate information, offering interpretations and helping guide professionals to optimal development applications.
الخبرة
Chief Surveyor at RPCO (2023-01 – Present)
- Project Name / (Project W)
- Client / D.D.C
- Consultant / JASSARA / MEINHARDT
- Project Items (Roads / Earth Works / Fences / Golf course / Culverts/Tunnels / Infra/ bridges)
- Coordination with design team for the regen of design
- Control for survey department more than twenty surveyors and Q.S department
- Supervising subcontractors and supporting them for data
- Prepare the monthly invoices for subcontractors
- Coordinate with other departments like contract and procurement
- Support the project management by daily updating for project layout and tracking all activities progress
- Project Name / (Jabel El-Nour -Jabel Throw fencing)
- Client / RCMC
- Consultant / SETES
- Project Items (excavation - walls - gates - culverts)
Chief Surveyor at EL AMAR FOR CONSTRACTION (2015-01 – 2022-12)
- Project Name / (KRIR Lagoon & BELAA MERA RESORT) SALEM 3 TOWER
- Projects Locations / NORTH COAST -ALEXANDRIA -EGYPT
- Client / EL AMAR GROUP
- Projects Items. (Earth works / Roads / Infra Structural / land Scape / Budlings /Swimming Pools)
- Road work, underground utilities, Budlings shop drawings
- QS for earth
- Preparing Sketches for Site works
- Preparing Road Model and grading in Civil 3D
- Designing for road alignments, plan, and profile, assemblies & corridors
- Preparing X-Sections to calculate Earthwork cut & fill quantities
- Preparation of Site Modification as per Work Inspection Requests (WIR)
- Assist filed Engineers and Superintendents in verifying and counter checking of the site works when the problem arises
Senior surveyor at AL AMAR CONSTRACTION (2011-01 – 2017-01)
- Project Name / (MARINA GARDENS MARINA SUNSHINE & MARINA FLOWERS RESORT) SALEM 2 TOWER
- Projects Locations / NORTH COAST -ALEXANDRIA -EGYPT
- Client / EL AMAR GROUP
- Projects Items. (Earth works / Roads / Infra Structural / land Scape / Budlings /Swimming Pools)
- Follow up with surveyors on site
- Preparing design survey data
- Road Intersection designing and modelling
- Roundabout designing and modelling
- Preparing road sections with volume
- Preparing X-Sections to calculate Earthwork cut & fill
- Preparing AS BUILT sheets for all construction items
- Preparing WIR
Site surveyor at AL AMAR CONSTRACTION (2007-09 – 2011-01)
- Project Name / (CRBINO &VENUS 2 RESORT)
- Projects Locations / NORTH COAST -ALEXANDRIA -EGYPT
- Client / EL AMAR GROUP
- Projects Items. (Earth works / Roads / Infra Structural / land Scape / Budlings /Swimming Pools)
- Preparing survey data
- Making TOPO survey and AS BUILT
- Marking survey points
- Equipment follow-up
Site surveyor at EL MADAIN FOR FOUNDATION (2007-01 – 2007-09)
SITE SURVEYOR FOR FOUNDATIONS PROJECTS CAIRO UNDER GROUND, EL MARG WATER STATION
Site surveyor at ALEX FOR CONTRACTION (TALAT MOUSTFA) (2006-05 – 2007-01)
SITE SURVEYOR AT TULEB HOTEL PROJECT
التعليم
BA in SURVEYING AND MAPS – GOOD UNIVIRSY OF ALEXANDRIA (2002-09 – 2006-05)
Diploma in GEOGRAPHIC INFORMATION SYSTEM – ARAB ACADMY FOR SCIENCE AND TECNOLOGY (2005-08 – 2006-10)
