Ihsan
اطلب عرض سعر بدون التزام
I wish to apply for the position of civil site engineer, this position seems an ideal opportunity for me as it matches my experience, knowledge, and career.
As you can see from my resume I have more than 10Y significant progressive experience in civil engineering projects within the construction of high-rise buildings in both structure and finishing works.
My progressive civil engineering experience has provided me with the opportunity to develop strong client relation-building skills and an ability to lead multi-disciplinary teams.
I enclosed my CV for your review and look forward to meeting you in the near future. I would welcome the opportunity to talk to you & hope that you will invite me for an interview.
Position: Civil Engineer (Parcel 1.14 & 1.11)
Company Name: Shapoorji Pallonji Mideast LLC, Riyadh, Saudi Arabia
Duration: Jan 2020 to April
Clint: KAFD development & Management Company
Project Name: king Abdullah Financial District (KAFD) Zone-1
Construction of high-rise buildings for all types of finishing works Aluminum, Glazing, Flooring finishes,
Cladding Finishes, ceiling, Painting, Landscape, Hardscape, Fire stop works, Waterproofing, Painting Works, Woodwork, Planters, CDA requirements, and ensuring that all kind of finishing work execute as per standard of construction methods, drawings, BOQ’s standards, and specifications.
Company Name: SPACCO, KSA
Duration: Feb 2016 to Jan 2020
Duration: December 2018 to Jan 2020
Consultant: Project Inspection Department (PID) ARAMCO, Riyadh, KSA
Clint: Olayan, Descon (ODICO/ODECO), KSA
Construction of VRU Raft Foundation(17m*11m*.90m) including installation of anchor bolts and base plate, Isolated foundation 12 Tower pole lights(2.5m*2.5m*1.75m) including installation of anchor bolts and base plate, 2 battery Box Simple foundation and 2 Bus Duct structure steel concrete footing & Ensuring that all activities that are being performed as per Saudi Aramco standard construction methods, drawings, BOQ’s standards and specifications.
Project Name: Painting System for Structures Viaduct Piers, Piers cap, Bearing pedestal, Viaduct Spans, Station Piers, and bottom of mezzanine, Riyadh Metro Line, Al-Riyadh, KSA
Duration: April 2018 to Dec 2018
Consultant: Riyadh Metro Transit Consultant (RMTC)
Clint: AR Riyadh New Mobility (ANM)
Surface preparation with Grander & Wash the Surface with water jet and applied the putty material filling on Via Ducts spans joints and piers joint etc. Apply the 2 coats of paint (SA 550 Part A+B) with Air less compressor machine. Check the Dry Film thickness (DFT test) conformity to 1000 micron achieved & Conduct the Pull Out Test after 7 days from the completion date of final coat wherever applicable should be more than 1.5 MPa (≥1.5MPa).
Project Name: The Project involves the Construction of a 45 km Long Double Track Line from West Depot to East Depot. The Track is mostly Super elevated, with 4 kilometer of Underground Tunnel Line, Riyadh Metro Line, Al-Riyadh, KSA.
Duration: Feb 2016 to April 2018
Consultant: Riyadh Metro Transit Consultant (RMTC)
Construction and installation of Ballast-less Double Track in Main line 45km (Gauge 1435mm) ,21 turnouts, Pocket Track and Stabling Yard Track. Jigs and its Accessories are installed every 2.5m, Fastening System is installed as per design, Stray current collection system is installed as per design, Reinforcement mesh are installed as per design, Formwork are installed as per specification and check the stability Max +/-5mm form the width of the plinths and poring the concrete.
Position: Site Inspector (Re Assistance)
Company Name: ECSP (Engineering Consultancy Service Punjab), Lahore, Pakistan
Project Name: Identification Critical GOVT Schools Building, Lahore, Pakistan
Duration: May 2015 to Nov 2015
Survey and Inspection for Punjab Province Government Schools buildings, identify critically Government School’s buildings, prepared Rough drawings and mentioned all exiting condition to preparation of estimate amount for rehabilitation of school’s buildings.
Company Name: Iftikhar & Company, Lahore, Pakistan
Duration: July 2012 to April 2015
Duration: Oct 2014 to April 2015
Consultant: Republic Engineering Corporation (PVT) Ltd (REC)
Construction of Hostel building, Academic building, Burn house Building, Fire tower building, Fir fit tower,
Swimming pool, Overhead water tank, assembly ground, Underground water supply line, Underground
Firefighting line, sewerage line, Sewerage men holes, Drain line, Jogging track, P.C.C road, Tuff tile
Footpath Boundary wall and land escaping.
Project Name: Construction of The International Tennis & Badminton Stadium at Nishter Park Sport Complex, Lahore, Pakistan
Duration: July 2012 to Oct 2014
Consultant: Communication & work Department (C&W)
Construction of the international level Tennis court building (2 stores), Teams rooms, coach rooms, Gents change rooms, Ladies change room, Staff Rooms, living rooms, 4 entrances/exit halls, toilets, stair case, sitting area, surrounding the building tuff tile floor, building sewerage line connect to main sewerage line, land escaping, boundary wall and gate installed.
Responsibilities as a civil Engineer
B. Tech Bachelor of Technology in Civil Engineering
(2013 to 2015) Superior University of Lahore campus, Pakistan
DAE Civil Diploma of Associate Engineer in Civil Engineering
(2009 to 2012) Lahore poly technique institute Lahore, Pakistan
(2007 to 2009) GOVT Muslim Model High School Shahkarghar, Pakistan
Computer Skills Auto Cad (2D), MS Office, Internet Surfing & Browsing