Flange management inspector - IKM Testing Thailand co.,ltd.
(2024-11)
- Bacalhau FPSO (Singapore) - Mo Dec International Inc. - Flange facing re-machine, Flange management
- CRISP Project - ExxonMobil - Flange facing re-machine, Bolt talk
- T/A2025 - Dow Chemical Co., ltd - Flange inspector
- Cadinal, Pluto T1 - STP & I PCL - Flange facing re-machine, Pipe Cold cutting
- GPSC (GSRC) Shutdown - Dexon - Bolt talk
- ZAWTIKA Project - CUEL Co., ltd - Hydro Static testing, Air flashing, Bolt torque
Package test Engineer - Sarcon (TH) co., ltd.
(2024-09 - 2024-10)
Clean Fuel project (Thai oil plant)
- Discussion with owners for Hydrostatics test work packages
- Estimation tools and equipment for Hydrostatics testing and Pneumatic testing
- Preparation tools and equipment Hydrostatics testing and Pneumatic testing
- Follow-up procedures piping testing
- Keep value to testing input the reports
- Inspections for reinstate before send to approved
- Provided send to client for testing Hydrostatics testing and Pneumatic testing
Service Engineer - ALPHA Group co., ltd.
(2022-03 - 2024-08)
- Design clamp for on-line leak sealing
- Site survey On-line leak sealing work
- Worker of on-line leak sealing work
- Make report of on-line leak sealing work
- Worker of tightening torque bolt work
- Make report of tightening torque bolt work
Mechanical & piping Engineer - Absolute power (chiangmai) company ltd.
(2021-05 - 2022-03)
Bio diesel plant - Circular energy
- Witness and approved piping line check, Hydrostatic testing, cleaning & flushing, painting, insulation, tie-in point, Pipe Reinstate
- Witness and approved equipment Position Orientation, Level check, Center check, inspection equipment before insulation
- Witness and approved installation insulation & demister internal
- Witness and approved painting inspection for piping, structure steel & equipment
- Review and approved daily & progress report for piping
Production Engineer - BJC Heavy Industries Public company limited.
(2021-01 - 2021-04)
Koodaideri - Cape lam bert
- Check material receive for liner chute
- Control process of producing structure steel
- Control progress following schedule plan
- Check products for final inspection and transfer to paint and
- Check drawing revise and specification following Production
Mechanical & piping Engineer - Absolute power (chiangmai) company ltd.
(2020-05 - 2020-12)
Pure glycerine plant - Bangchak bio fuel
- Witness and approved piping line check, Hydrostatic testing, cleaning & flushing, painting, insulation, tie-in point, Pipe Reinstate
- Witness and approved equipment Position Orientation, Level check, Center check, inspection equipment before insulation
- Witness and approved installation insulation & demister internal
- Witness and approved painting inspection for piping, structure steel & equipment
- Review and approved daily & progress report for piping
Sr. Service Engineer - ALPHA Group co., ltd.
(2017-01 - 2020-01)
- Design clamp for on-line leak sealing
- Site survey On-line leak sealing work
- Worker of on-line leak sealing work
- Make report of on-line leak sealing work
- Worker of tightening torque bolt work
- Make report of tightening torque bolt work
Project Engineer - RPL Best supply & service ltd part.
(2016-06 - 2016-12)
TUPI BV. (BJC heavy industries public company limited.)
- Control welder manpower
- Coordinator vessel work of project
- Quality control of welding pressure vessel
- Drawing control for revise drawing
- Preparation welder qualify test
- Monitoring work follow project specification
- Make pay roll payment of welder
- Invoice for pay roll of monthly
Mechanical & piping Engineer - Absolute power (Chiangmai) company ltd.
(2016-01 - 2016-06)
Bangchak Bio Fuel Plant 2
- Witness and approved piping line check, Hydrostatic testing, cleaning & flushing, painting, insulation, tie-in point, Pipe Reinstate, Final coupling
- Witness and approved equipment Position Orientation, Level check, Center check, inspection equipment before insulation
- Witness and approved installation insulation & demister internal
- Witness and approved alignment plummet for structure steel
- Witness and approved painting inspection for piping, structure steel & equipment
- Review and approved NDE. report, pipe package, MDR., & other report
QC Inspector - CB&I Thailand.
(2015-08 - 2016-01)
RAPID HDD Project, Shintech Project
- Fit-up piping according with specification B31.1,B31.3&Project spect
- Record daily record piping
QC Inspector Welding - Mc Connell Dowell Constructor Thai Co.,LTD.
(2015-01 - 2015-06)
The Fourth Transmission Pipeline
- Document control for handover to completion
- Monitoring Fabrication in process Fit-up and Welding according with specification B31.3, B31.8., ASME Sec.XI
- Record data all inspection structure steel & piping
- Inspection Painting Process
- Review history sheet, NDE Report, Preheat & Post weld heat treatment Report, painting Report
QC Inspector, QC Engineer - BJC Heavy Industries PCL.
(2012-12 - 2015-01)
APLNG, Cape Lambert, Petrobras
- Monitoring Fabrication in process Fit-up and Welding according with specification AWS D1.1, AS 4100, AS 1554.1
- Record data all inspection structure steel
- Check Fit-Up, visual welding, fabrication structure steel
- Review history sheet & report NDE
- Welder qualify test control referent AS 3992
Draft Engineer - Global Seal Co., Ltd.
(2012-06 - 2012-12)
- Draft & Design pneumatic, hydraulic cylinder
- Service & install pneumatic, hydraulic cylinder