Supervisor Construction - Foster Wheeler (Thailand) Limited - Thai Oil Refinery Sriracha, Thailand
(2025-10)
Construction division supervisor for Thai Oil Clean Fuel Project (CFP.)
- Give safety briefing / toolbox talks before starting work
- Daily discussions with sub-contractor supervisors for daily progress updates
- Resolving production related issues due to engineering or site clashes
- Plan and execute construction sequence and drive site installation as per planned construction sequence
- coordinate site activities between different trades to achieve structural completion as per planned construction sequence
- Monitor and control material management on site so as to ensure proper storage and unnecessary wastage
- Interact and resolve issues with client's site supervision daily
- Review Test Pack and sign off to Approved
- Providing 3D model views as necessary to aid the Constructions Team
- Planning and Coordinator with subcontractor & owner Control & monitor piping & Tie-in works
- Coordinate with owner operation TOP/PMC and contractor
- Site surveying & detail Tie-in point with engineering team before issue Engineering work package
- Coordinate with construction team
- Coordinate with engineering team & OA/QC team
- Progress status control, and document engineering for construction work
- Expedite erection piping & Tie-ins work and Reinstatement keep work before release to owner
- Maintains strict adherence to welding program and project requirements to achieve quality and safety standards requirement
Sr. Supervisor Construction - UJV work for Petrofac Southeast Asia Pte.Ltd - Thai Oil Refinery Sriracha, Thailand
(2021-03 - 2025-03)
Construction division senior supervisor for Thai Oil Clean Fuel Project (CFP.)
- Give safety briefing / toolbox talks before starting work
- Daily discussions with sub-contractor supervisors for daily progress updates
- Resolving production related issues due to engineering or site clashes
- Plan and execute construction sequence and drive site installation as per planned construction sequence
- coordinate site activities between different trades to achieve structural completion as per planned construction sequence
- Monitor and control material management on site so as to ensure proper storage and unnecessary wastage
- Interact and resolve issues with client's site supervision daily
- Scoping P&ID separate test package boundaries and assign test pack numbering to register for the Turnover team to record
- Preparation for the Master P&ID Mark-Up
- Review Test Pack and sign off to Approved
- Providing 3D model views as necessary to aid the Constructions Team
- Planning and Coordinator with subcontractor & owner Control & monitor piping & Tie-in works
- Coordinate with owner operation TOP/PMC and subcontractor
- Site surveying & detail Tie-in point with engineering team before issue Engineering work package
- Coordinate with construction team
- Coordinate with engineering team & OA/QC team
- Progress status control, and document engineering for construction work
- Expedite erection piping & Tie-ins work and Reinstatement keep work before release to owner
- Maintains strict adherence to welding program and project requirements to achieve quality and safety standards requirement
Project Engineer - STP&I Public Company Limited - Laem Chabang Module Assembly yard, Thailand
(2020-03 - 2021-03)
Pre-Commissioning division engineer for Chemicals and Refining Integrated Singapore Project
- Scoping P&ID separate test package boundaries and assign test pack number
- Preparation Test Pack for Testing Team. (MFY)
- Preparation Test Pack Register for TOSTR Group
- Preparation Procedure Hydro Test, Flushing & Blowing, Drying and Preservation
- Preparation the Work Method Statement for Pressure Testing
- Preparation Material for Fabrication Temporary Piping Spool
- Preparation Tool and Equipment for Pressure Testing
- Control Schedule for Pressure Testing and Internal Cleaning
- Preparation Document for Pressure Testing and Internal Cleaning
- Preparation for the Master P&ID Mark-Up
- Review Test Pack for Submit to Main Contractors Approved
- Updating work packages with the latest document revisions
- Providing 3D model views is necessary to aid Constructions and Testing Team
- Maintains strict adherence to welding program and project requirements to achieve quality and safety standards requirement
Mechanical, Piping & Testing Field Engineer Lead - CB&I (Thailand) Limited & McDermott International Ltd. - 145 Moo 8 Takuan - Had Saithong Road, T. Maptaphut, A. Muang, Rayong 21150, Thailand
(2019-06 - 2020-01)
SPRC Shutdown & Turnaround 2019 division field engineer lead
Fabrication Engineer Lead - CB&I (Thailand) Limited - 119/82 Moo 4, T. Plutaluang, Sattahip, Chonburi 20180, Thailand
(2015-09 - 2019-06)
Fabrication division engineer lead for multiple projects including RAPID SCC Heater Project, SHINTECH ETHANE CRACKER Heater Project, DUPONT Heater Project, CLEAN FUELS KNPC Heater Project, LACC EP 1000 KTA ETHYLENE PLANT Heater Project, ORPIC LIWA Heater Project, AFIPSKY REFORMER Heater Project, SPHERE/DWT/FBT TANKS JG SUMMIT PROJECT, TOTAL US ETHANE CRACKER PROJECT, PTTGC ORP NAPHTHA CRACKER PROJECT, and NEW FUEL OIL TANKS PROJECT
- Fabrication Heater, Boiler, Pressure Vessel, Tanks, Structure & Piping
- Review the Shop Drawing to Consistent Design Drawing as requirement
- Review best line Schedule and 3 weeks look ahead for fabrication to schedule on time
- Review Procedure and ITP Conformed follow up as Project Specification requirement
- Review Receiving Inspection Report (RIR) of Material as Project Specification Requirement
- KOM before Start Fabrication
- Preparation Work Pack and Issues to fabrication team
- Provide Weekly Work Plan to fabrication forecast
- Review Daily Welding Report (DWR) and Daily Fabrication Report (DFR)
- Preparation RFI, PCN & TQ to Engineering Team, if cannot to fabricate follow drawing
- Coordinate