Office Engineer at Chai Chan Chang Co., Ltd. (2025-09 – Present)
- Material procurement and contractor procurement documents.
- Payment contractors, BOQ, CBOQ
- Take off the material quantity of Architecture works.
Office Engineer at Jeerathana Engineering Co., Ltd. (2023-10 – 2025-08)
Project: Dcondo Air Ladkrabang, Escent Bangna
- Document Weekly report, Master Plan Project, S-CURVE Schedule
- Payment contractors, BOQ, VO,Contractor procurement documents.
- Take off the material quantity of structural works.
- Control the work according to the plan.,Material Approved.
- Check first pile to match the geological data in ShopDrawing and check the work about bored pile.
- Core log obtained from boreholes for confirm of concreting.
- Document photo slag samples for payments.
Office Engineer at KAYUN KRAN KIET Co.,Ltd (2023-02 – 2023-09)
- Document daily report and request report.
- Document Monthly report and Weekly report.
- Payment contractors
- Contractor procurement documents.
- Take off the material quantity of structural works.
Geological Engineer at CHINA RAILWAY 11 BUREAU GROUP (THAILAND) CO., LTD. (2022-06 – 2023-01)
- Check first pile to match the geological data in ShopDrawing and check the work about bored pile.
- Core log obtained from boreholes for confirm of concreting.
- Document photo slag samples for payments.