SHE MANAGER at TERRAGRO FERTILIZER CO.,LTD (2025-09 – 2025-10)
Terragro Fertilizer Co.,Ltd is the chemical fertilizer production plant in Nakhon Luang District, Phra Nakhon Si Ayutthaya Province.
- Setup the budget for safety health and environmental activities in 2026.
- Review permit to work system and procedure for improvement.
- Meeting, advice and inspection the contractor's safety performance during the construction of the project.
- Advice and repair fire water pipe and fire alarm system to normal condition.
- Coordinate with government agencies to facilitate inspections of the port and air pollution control systems.
SHE MANAGER at GULF JP NS CO., LTD (2017-07 – 2025-08)
Gulf JP NS Co., Ltd is the thermal power plant, Capacity 1,600 MW (IPP) by natural gas or diesel oil.
- Create and follow up annual safety, health and environmental action plan.
- Set up and control the budget for safety health and environmental activities.
- Arrange and conduct proper training on safety, health and environmental rule, procedure or issues for employees and contractor.
- Set up and implement safety culture program.
- Conduct regular inspections and audits to identify and address safety risks and environmental aspects in normal operation and maintenance outage period.
- Coordinate the third party for environmental monitoring and mitigation measure follow EIA regulation and lender's requirements. Make and send the EIA monitoring report to related government agencies.
- Develop and manage programs to industrial waste management, air pollution control for compliance with the legal and other requirement.
- EMR and leader for implementation of ISO14001 and ISO45001.
- Monitor and prepare a Greenhouse gas emission report by Carbon Footprint for Organization (CFO).
- Security guard management and asset control.
- Control and renewal of permits, licenses and reports of power plant.
- CSR activities with communities within 5 km radius around power plant and related government agencies.
- Community Participation Committee and Environmental Audit Committee meeting every 3 months.
- Prepare related document for EIA amendment to install Ultrafiltration system at Water treatment unit and install Solar Farm capacity 1.5 MW.
ASSISTANCE EHS MANAGER at MAGOTTEAUX CO., LTD (2010-07 – 2017-06)
Magotteaux Co., Ltd is the metal foundry industry, production of grinding ball and vertical roller mill part for cement and mining industries.
- Prepare related document and coordinate with consultant for EIA report of new factory producing grinding ball at Sao Hai District, Saraburi.
- Prepare related document for EIA amendment of factory expansion to producing Vertical roller mill part at Bua Loy Subdistrict, Nong Kae District, Saraburi.
- Coordinate the third party for environmental monitoring and mitigation measure follow EIA regulation and submit the report to related government agencies every six months.
- Industrial waste management, air and water pollution control.
- EMR and leader for implementation of ISO14001, OHSAS18001, SA8000 and to be a committee of ISO9001 and ISO50001.
- Arrange and conduct proper training on safety, health and environmental rule, safety risk, environmental assessment for employees and contractor.
- Community satisfaction survey once time/year.
ENVIRONMENTAL OFFICER at NATIONAL POWER SUPPLY CO., LTD (2005-05 – 2010-06)
National Power Supply Co., Ltd is the small power plant (SPP), Capacity 164 MW by Coal and Biomass.
- Coordinate the third party for environmental monitoring and mitigation measure follow EIA regulation and submit the report to related government agencies every six months.
- Industrial waste management, air and water pollution control.
- Conduct regular inspections and audits to identify and address safety risks and environmental aspects in normal operation and maintenance outage period.
- Leader for implementation of ISO14001, OHSAS18001 and to be a committee of ISO9001.
- EMR and leader for implementation of ISO14001 and ISO45001.
- Monitor and prepare a Greenhouse gas emission report by Carbon Footprint for Organization (CFO).
- Security guard management and asset control.
- Control and renewal of permits, licenses and reports of power plant.
- CSR activities with communities within 5 km radius around power plant and related government agencies.
- Community Participation Committee and Environmental Audit Committee meeting every 3 months.
- Prepare related document for EIA amendment to install Ultrafiltration system at Water treatment unit and install Solar Farm capacity 1.5 MW.