Instrument Engineering Works, Construction works
Send a job offer directly to this candidate
Has over 26 years of extensive Instrument Engineering Works, Construction works, Quality Construction Works, Mechanical Completion Works, SAT Loop test, Function Test, Pre-commissioning work, and Commissioning work experience and knowledge in diverse activities for Off-Shore, On Shore, Oil & Gas, Power Plant, Pharmaceutical Plant, and Petrochemical Plant, including the engineering design verification and reviews on Instrumentation Control System, DCS, PLC, SIS, ESD, F&G Systems, PAGA and SCADA systems, Field Instrument design, cause-effect (C&E), Instrument Datasheet, Instrument Process Hook-up, and Typical Installation Details and, Material Take Off, RFQ and Technical Bid Evaluation (TBE)
Engineering Work such as developing design work as a minimum with the following, specifications, requisition, datasheets, hook-up drawings, loop drawing, block diagrams, instrument list, I/O list and etc. and to ensure that all related deliverables are in compliance with the applicable codes, standards, project, and corporate requirements and procedures. Coordinate all Engineering team member’s activities and related engineering disciplines and ensure they are produced to the correct level of quality and in accordance with the contract requirements and approved project plans. Coordinate external engineering companies for Instrument engineering activities; liaison information between engineering team members, vendors, and engineering companies. Support the technical bid evaluation, and evaluate vendor quotations and specifications. Consider QA/QC Ensure that design integrity is maintained through fabrication with correct handling of site queries and proper application of QA/QC procedures.
Health, Safety & Environment Ensure continuous improvements are made to all activities with the engineering department with respect to HSE.
Construction work & Quality Control, MC Work and Commissioning work Expediting and inspection and Performs work of Instruments System and field-installation. Executes the specific inspections on materials, equipment, and construction/installation activities on site. Issues the relevant Quality Records and, when necessary, writes and sends to QC Manager Non-conformances reports.
Witness & Check cable laying and cable identification. Performs visual inspections, dimensional tests, Witness & checks rating and material for connection. Witness & check the pneumatic signal connection.
Checks fiber optic cable, communication cable, etc. Witness the tests, controls, and inspections carried out. Performs tests of continuity, and insulation resistance. Performs punch-listing operations.
Performs tests of functional instruments.
Participate in MC verification of equipment and packages ready for commissioning. Witness all MC Activity relating to Instrument scope joint walks down participate in punch out of offered MC Package and assist with completion of all handover documents and certification Punch out of offered MC and commissioning package. Review commissioning procedures and Perform commissioning activities during all phases to smooth and safe.
Follow up punch work in the Feld and punch list document and clearance all. Check and confirm all documents & Drawings marked up with change during commissioning.
Period of Assignment April 2022 –Present
Position: E&I ConstructionEngineer; Thaworn Engineering and Construction.
Project: TOA Sunrise II Project
Description of Project: TOA Sunrise II Project, TTCL Public Company Limited
Responsibilities: Responsible for Manage and work sites for E&I Site construction works coordinating site activities and assuring that all disciplines directly involved in the project are in phase with the project goals and objectives Liaise between engineers and others working on the project. Prepare and manage estimates, budgets, timetables, and resources.
Period of AssignmentSeptember 2021 – March 2022Position:QC Engineer Instrument / Automation; SPCC Joint Venture.Project: PTT LNG Receiving Terminal Description of Project:PTT LNG Nong Fab LNG Receiving Terminal ProjectResponsibilities:Responsible for Reviews design, and testing documentation. Coordinates and performs inspections of raw materials and finished works, applying appropriate quality assurance testing models. Identifies the root cause of quality problems, and coordinates modifications or other corrective actions.
Review, Support MC Work and Commissioning work.
Period of AssignmentApril 2021 – July 2021Position:Project Engineer; Pro-En Technologies Ltd.Project: The Shell Company Limited. Description of Project:Countrywide Ethanol Flame Detector installation
CNS B100 Ethanol Unloading Facility Installation
CNS Barge Loading Accolade Replacement
Responsibilities:Responsible for Coordinate the work of project Team, carry out site visit to confirm construction Scope of work cost estimate and budgetary and progress, join to resolve problems and issues during site survey, Review Manage monitoring & control the construction Scope of work.
Period of AssignmentSeptember 2018 – January 2021Position:E&I Construction Engineer
• Thaworn Engineering and Construction.Project: MITR PHOL AMNATCHAROEN CO., LTDDescription of Project:Sugar Plant &
• Power Plant MTR Amnat- Charoen ProvinceResponsibilities:Responsible for Electrical&
• Instrument Construction WorkPeriod of AssignmentOct 2017 – Sep 2018Position:Lead Instrument Engineer
• Worley Parsons, Thailand.Project: PTT Exploration and Production Public Company Limited. ProjectDescription of Project:Engineering For Arthit AWP-39 Wellhead Platform Project BasicResponsibilities:Responsible for Lead engineering for Engineering work & design Period of AssignmentNov 2015 – Oct 2017Position:E&I Construction Lead Engineer: Thaworn Engineering and Construction.Project: PTG Energy Plublic Copany Limited ProjectDescription of Project:PT Surin Tank Farm Surin ProvinceResponsibilities:Responsible for Electrical&
• Instrument Construction Work, MC Work and Commissioning work
Period of AssignmentJan 2009 – Oct 2015Position:Lead Instrument Engineer: Worley Parsons, ThailandProject: CHEVRON THAILAND EXPLORATION PRODUCTION. Project
CTEP_SGWB Facilities Modification for New Platform SGWC
CTEP_Pipeline Conversion for Erawan Water Injection
CTEP_Topside Modification on ERWR and ERWB for New PL ERPLR2
CTEP_B8 32 Remote Start BC Function
B8/32 Benchamas Field Gas Lift Project.
C-HESS BULAN B-WP10WHP Project
CTEP_ Cambodia Block A Detail design Project
PEARL ENERGY (PEARL OIL THAILAND) Ltd. Project
Pearl Provision of Periodic Engineering Support & Service.
BYA 4 Additional Flow Lines & 2 Injection Project.
Jasmine A Add New Degasser & Vent gas Scrubber Project.
Diesel Generator Dual-Fuel Upgrade Detailed Eng. Project.
WPB Modification to Increase Diesel Storage Tank Project.
6 WPC and 4BYA Additional Flow lines Project.
Sea Water Cooled Heat Exchanger Detail Design Project.
PTT Exploration and Production Public Company Limited. Project
PTTEP BONGKOT_ MAXIMIZING FSO2 & QP ACCOMODATION North
PTTEP ARTHIT WELLHEAD PLATFORM PHASE 1C (AWP11, 12, 13, 14), GREEN FIELD PROJECT.
Responsibilities:Responsible for Lead Engineering for Engineering work & design Work and Procurement support. Period of AssignmentJan 2008 – Dec 2008Position:Senior Instrument Engineer; Technip Engineering (Thailand) Ltd.Project: CHEVRON THAILAND EXPLORATION PRODUCTION. Project
PTT Exploration and Production Public Company Limited. Project
Responsibilities:Responsible for working on Engineering work & design procurement support as instrument engineering
Period of AssignmentMay 2006 – Dec 2007Position:Senior Project & Instrument Engineer; Smart Engineering Service Co., Ltd.Project: CUEL Limited.
Pearl Jasmine B Wellhead Platform
Pearl Jasmine B 2 Platform
Pearl Jasmine C Wellhead Platform
Pearl Jasmine D Wellhead Platform
Pearl Ban Yen A Wellhead Platform
Responsibilities:Responsible for working on Engineering work & design procurement support as instrument engineering. Period of AssignmentFeb 2004 – Mar 2006Position:Senior Electrical & Instrument Engineer, M+W Zander (Thai) LtdProject: BETTER PHAMA PROJECT, BETAGO
Description of Project:BETAGRO PUBLIC COMPANY LIMITED
Responsibilities:Responsible for working Electrical& Instrument Construction Work, MC Work and Commissioning work Period of AssignmentJan 2003 – Jan 2004Position:Sr. Project & Instrument Engineer – The Shell Company Limited. As Global Engineering Solution Co., Ltd.Project: The Shell Company Limited. Thailand
Bitumen Plan Laos Project The Shell Chong- nonsi Oil Tank alarm Upgrade The Shell Chong- nonsi PMB Plant Upgrade
Responsibilities:Responsible for working Electrical& Instrument Construction Work, MC Work and Commissioning work Period of AssignmentJuly 2000 – April 2003Position:Instrument Engineer, Toyo-Thai Corporation, Ltd.
Project: TLP Cogeneration Co., Ltd.
117 MW TLP COGEN. RAYONG POWER PLANT PROJECT
GE Toshiba Silicones (Thailand) Limited
NEW SILICONES FINISHING PLANT PROJECT
Eastern Chemical Co., Ltd.
Responsibilities:Responsible for working Electrical& Instrument Construction Work, MC Work and Commissioning work Period of AssignmentFeb 1998 – Apr 2000 Position:Maintenance Manager, MBK Laundry Co., Ltd.Responsibilities:Management & control to maintenance and repair automatic Laundry machines factory utility equipment, air compressor, Steam Boiler, Waste water Treatment and factory electrical power.
Period of AssignmentOctober 1995 – Jan 1998Position:E&I Engineer, German-Thai Boiler Engineering Cooperation LtdResponsibilities:Engineering design work Site construction work Installation, Loop test Function test and Pre-commissioning & Commission work
Education: Bachelor Degree of Instrumentation Engineering from King Mongkut's Institute of Technology Ladkrabang, Thailand, Year 1995. Thai – Mother Tongue
English - Good