Second-Class Honors Civil Engineer (GPA 3.54) and International Winner of the CSiCOL Design Quest 2024, with hands-on experience in Cost and Site Engineering across high-value commercial building (THB 1.352B) and biogas plant projects (THB 60.5M). Highly skilled in quantity take-offs, BOQ preparation, contract & VO management, progress billing, and quality-compliant site supervision for building structures, liquid, and gas piping systems. Passions lie in structural design, structural inspection, and project optimization.
Currently planning to pursue a distance-learning B.S. in Occupational Health and Safety to enhance site safety leadership and overall project delivery quality.
ประสบการณ์
Civil Engineer (Site Engineer) at Asia Biogas (Thailand) Co., Ltd. (2026-04 – Present)
- Biogas System Expansion Project (Palm Oil Mill), Nuea Khlong, Krabi | Project Value: THB 60.5 Million
- Site Supervision & Quality Control: Supervised building construction, liquid piping, and gas piping systems to ensure strict compliance with engineering standards and safety specifications.
- Project Planning & Risk Management: Managed execution schedules, conducted risk assessments, and implemented problem-solving strategies during on-site bottlenecks to meet contract deadlines.
- Financial & Material Administration: Managed subcontractor progress claims, prepared owner progress billings, and audited site deliveries of construction materials and machinery.
- Biogas System Expansion Project (Dairy Cow Farm), Phu Ruea, Loei | Project Value: THB 42.6 Million
- Substructure & Site Execution: Supervised foundation and substructure activities, including pile driving, pile head cutting, pile load testing, earthworks/excavation, and lean concrete placement to ensure full compliance with engineering standards.
- Engineering & Drawing Review: Reviewed engineering design drawings, TOR, calculations, and supporting documentation prior to construction to verify accuracy and prevent execution errors.
- Cost Estimation & BOQ: Performed precise structural Quantity Take-Offs (QTO), prepared Bills of Quantities (BOQ), and developed construction cost estimates to support budget management.
Cost Engineer at Syntec Construction Public Co., Ltd. (2025-06 – 2026-03)
- Project: Dulwich College International School Project, Prawet, Bangkok | Project Value: THB 1.352 Billion
- Cost & Contract Management: Controlled project budget for a THB 1.352 Billion development; performed quantity take-offs (Site Take-off) for bidding comparisons subcontractor selection, and operational execution.
- Financial Documentation & Audit: Audited POs and WOs against project BOQs; managed contractor payments, client billings, variation orders (VO), and contract time extension documentation.
- Tendering Support: Estimated quantities and prepared BOQs for bidding proposals across multiple off-site company projects.
การศึกษา
Bachelor of Engineering (B.Eng.) in Civil Engineering – Srinakharinwirot University (2025)