Ana içeriğe geç
Şevval Hasanoğlu

Şevval Hasanoğlu

Industrial Engineering senior student at Bursa Technical University, graduating in July 2026

Yetenek
BursaÜyelik tarihi 31 Ağustos 2026
Dinamo ERPStatistical Process Control (SPC)
·

Bu kişiyi işe al

Bu adaya doğrudan iş teklifi gönderin

Dinamo ERPStatistical Process Control (SPC)

Hakkında

Industrial Engineering senior student at Bursa Technical University, graduating in July 2026. Possess practical hands-on experience in the automotive supply chain and industrial refrigeration sectors through long-term internships, actively taking engineering responsibilities in New Product Introduction (NPI), production planning, and data analytics. Highly skilled in deploying Multi-Criteria Decision Making (MCDM) techniques (AHP, TOPSIS) for real-world industrial problems, data visualization with Power BI, SQL/MySQL database querying, and Bill of Materials (BOM)/routing design in ERP systems.

Committed to optimizing operational workflows using data-driven methodologies and contributing to corporate digital transformation journeys.

Deneyim

Long-Term R&D Intern at Ibras Kaucuk Otomotiv Yan Sanayi A.S. (2024-10 – 2025-01)

  • Assumed active engineering responsibility in the product selection, testing, and implementation phases of 25 new automotive hoses to be introduced to the production line.
  • Integrated AHP and TOPSIS methods for multi-criteria product evaluations, establishing a data-driven decision infrastructure for New Product Introduction (NPI) processes.
  • Participated in carbon footprint calculation, Kaizen continuous improvement studies, and supplier performance analysis aligned with corporate sustainability targets.

Management Intern - Digitalization & Technology at Kaplanlar Sogutma A.S. (2024-07 – 2024-08)

  • Designed interactive Power BI dashboards tracking over 15 production KPIs, downtime records, and OEE data to completely eliminate manual management reporting workflows.
  • Extensively utilized MySQL queries to extract and analyze over 5,000 rows of daily production database logs to enhance data reliability in operational decisions, conducting bottleneck analyses to maximize assembly line throughput.

Production Intern at Ucel Kaucuk A.S. (Rubber to Metal Expert) (2023-07 – 2023-08)

  • Conducted 20+ time and motion studies on assembly lines, delivering process improvement proposals that achieved an 8% cycle time reduction.
  • Monitored quality processes using Statistical Process Control (SPC) on the shop floor, contributing to a 5% decrease in daily defect rates.

Eğitim

B.S. in Industrial Engineering – Bursa Technical University (2021-09 – 2026-07)

Beceriler

graduating in July 2026

Değerlendirmeler