Skip to main content
Bryan Padilla

Bryan Padilla

Production Associate

Talent
long beach,caMember since April 30, 2026
production associateQuality ControlData AnalystPackage DesignInventory ManagementTeam BuildingProblem Solvingattention to detailtime management
·

Hire this person

Send a job offer directly to this candidate

production associateQuality ControlData AnalystPackage DesignInventory Management

Experience

Saputo's cheese,

South Gate Inspected finished cheese blocks against weight and packaging specifications using calibrated scales. Operated high-speed wrapping line to package 800+ units per shift while maintaining seal integrity.Recorded sanitation checklists and corrected deviations that prevented mold contamination on production runs.Adjusted conveyor speeds and feed rates to reduce product jams and steady throughput during peak hours.Coordinated with maintenance to swap worn rollers, restoring line capacity within a single shift.Implemented batch labeling checks that caught label mismatches before palletizing, avoiding shipment rework.Trained seasonal staff on HACCP handling rules and PPE protocols to maintain compliant processing lines.Production Associate thrifty ice cream plant, Long Beach

Conducted in-process quality checks and removed defective units to maintain final inspection pass rates.Performed daily line changeovers, minimized downtime by following SOPs and quick-change kits.Adjusted machine feeds and tooling to reduce scrap on high-run orders and extend cutter life.Recorded daily production yields in spreadsheet, flagged abnormal batches for supervisor review.Conducted end-of-shift sanitation rounds following GMP checklists to pass internal audits.Verified finished-product weights with bench scales and corrected pack counts before sealing.Calibrated conveyor speeds and sensor thresholds to stabilize throughput during peak shifts.Production Associate

King Plastic inc

Adjusted machine feeds and speeds per SOPs to maintain consistent product dimensions across shifts.Logged production metrics in MES each shift to track yield, downtime, and trending defects.Performed line changeovers and trained two operators on new setup procedures to minimize downtime.Diagnosed recurring bottlenecks on assembly station and implemented a jig modification that improved cycle time.Implemented a color-coded kanban for raw sheet supply that shortened material retrieval time during changeovers.Conducted weekly line audits against SOPs and documented corrective actions for continuous compliance.Recorded shift-by-shift cycle times in Excel and flagged abnormal variance for engineering review.

Education

High school diploma polythecnic High school

Skills

production associate

Reviews

Related