Field Technician / Unit Supervisor at Superheat FGH (2016-10 – Present)
- Execute heat treatment and stress analysis monitoring, ensuring precise control of heat cycles.
- Interpret complex blueprints and ISO drawings to guide project execution.
- Manage site-wide safety compliance, including the signing and oversight of all unit permits.
- Perform preheat, bake-out, and insulation of piping systems.
- Utilize SmartView software to monitor heat cycles and maintain real-time communication with control centers.
- Maintain accurate technical documentation and spec sheets.
- Operate forklifts and company vehicles for equipment repair and material delivery, maintaining an excellent driving record.
Electrician at Tracy Electric (2015-09 – 2016-10)
- Installed electrical infrastructure, including trenching and underground conduit piping.
- Managed material logistics, including loading/unloading and inventory handling.
- Pulled wire and installed various electrical devices and terminals.
- Identified, cut, bent, and threaded conduit; performed precise wire dressing and termination.
- Identified various cable types (Cat5, fiber optic, ethernet, coaxial) and motor specifications.
Heat Treat Technician at TEAM Industrial Services (2008-05 – 2015-09)
- Monitored and analyzed heat cycles and stress levels for industrial piping.
- Managed isolation procedures and permit authorization for unit maintenance.
- Executed preheat, bake-out, and stress-relieving processes; installed thermocouples (T/C) and insulation.
- Utilized SmartHeat systems to ensure project specifications were met.
Environmental Technician at Global Pollutions Service (2005-11 – 2008-04)
- Served on a 24-hour emergency response team for major chemical spill remediation.
- Conducted site demolition and cleanup following natural disasters, including Hurricane Katrina.
Mud Analyst / Logging Sampler at Geo Search Logging (2004-08 – 2005-10)
- Performed 24-hour continuous sampling and analysis of mud circulating through active drilling wells.
- Analyzed geological data, water quality, soil, and chemical compositions to determine petroleum and mineral content.
- Documented all findings and collaborated with engineers to interpret physical and geological conditions.
Level 2 Technician at HTS Ameritech TX (2001-02 – 2004-07)
- Executed specialized cable system design and installation.
- Performed stress analysis, preheat, and post-weld heat treatment (HT) under technical supervision.
- Tasks included thermocouple installation, Brinell hardness testing, and blueprint interpretation.