Skip to main content
Richard Hogan

Richard Hogan

Apprenticeship/Journeyman

Talent
Bay CityMember since July 17, 2026
Conduit/GroundingProblem-SolvingExcellent Communication
·

Hire this person

Send a job offer directly to this candidate

Conduit/GroundingProblem-SolvingExcellent Communication

About

Dynamic individual with hands-on experience in conduit/grounding, wind tower installation, landscaping, and oilfield operations. Brings strong problem-solving skills and proactive approach to new tasks. Known for adaptability, creativity, and results-oriented mindset.

Committed to making meaningful contributions and advancing organizational goals. Equipped with strong problem-solving abilities, willingness to learn, and excellent communication skills. Poised to contribute to team success and achieve positive results.

Ready to tackle new challenges and advance organizational objectives with dedication and enthusiasm.

Experience

Apprenticeship/Journeyman - Mastec - Texas

(2024-04 - 2026-07)

  • Conduit/Grounding: Open a trench in middle of mat measures one side to other. Prep seats for conduit, prep rebar cut at 12 inch, 36 inch, 20 ft. Install 36 inch rebar on side trench hammered in measured 7-8ft spaced apart, set chairs, 12 inch rebar on sides of chair tied down to 36 inch rebar, install 90s to 20ft conduit, install conduit 16 20fts, tie with tie wire, install 36inch slightly bent rebars on top of chairs, install 16 20ft rebars tied to the slightly bent rebar all the way down, plac
  • Prep site with all equipment needed for the job. Wash cans inside n out, hang lugz, bars, slings. Build dancefloor, lift cans, wash bottom, fly base. Rattle inside n out. de rig. Rig next can, install bolts, tie equipment needed to go up, torque n tension all the way up, prep necell inside n out, rig beam, set tray if needed, set tag lines up, fly, blade prep, install studs, roll blades, yaw, cycle, rotate 1, fly blades. So many more details in the job its to much to list. Just a quick summary.
  • Vestas 163b/GE towers. 3 projects, 54 towers, 44 towers and 30.

Toppoff - Mastec - Texas

(2024-04 - 2026-07)

  • Prep site with all equipment needed for the job. Wash cans inside n out, hang lugz, bars, slings. Build dancefloor, lift cans, wash bottom, fly base. Rattle inside n out. de rig. Rig next can, install bolts, tie equipment needed to go up, torque n tension all the way up, prep necell inside n out, rig beam, set tray if needed, set tag lines up, fly, blade prep, install studs, roll blades, yaw, cycle, rotate 1, fly blades. So many more details in the job its to much to list. Just a quick summary.
  • Vestas 163b/GE towers. 3 projects, 54 towers, 44 towers and 30.

Solar - Mastec - Texas

Started in backfill pouring slurry into hoes, pumping water out, checking if hoes need to be redrilled, operating skidsteer pouring slurry. Install silt fence, measuring and cutting, prepping, operating skidsteer with plow, building parking lot, framing office decks for walk ways, site cleanups. 2 projects in solar.

  • Self-motivated, with a strong sense of personal responsibility.
  • Skilled at working independently and collaboratively in a team environment.
  • Proven ability to learn quickly and adapt to new situations.

Landscaping Crew Leader - Baycity

(2017-03 - 2024-04)

Fast paced work environment with safety in mind. Mow with different size mows, also push mow, weedee, edge, blow, landscape, hardscape, 12 hrs a day, 125 houses weekly with a crew of 4 people, maintain a professional attitude at all times, communicating effectively between customer and their needs. Flower beds and garden makeovers, redesign, planting plants tree trimming, cutting, pruning plants, installing sprinklers systems, digging trenches, clean ups, wood cutting etc. 6 days a week 12 hrs daily during peak season.

  • Supervised daily landscaping operations, ensuring high-quality service delivery and customer satisfaction.
  • Trained team members on equipment usage and safety protocols, enhancing overall team performance.
  • Conducted regular site assessments to identify maintenance needs and improve landscape aesthetics.
  • Developed effective communication strategies to liaise with clients regarding project updates and expectations.

Floorhand, Work Rig - Nabors Well Services - Victoria

(2013-01 - 2015-01)

Was laid off in 2015 when oilfield took a major crash. Spot well, align rig, rig up, set flow lines, pump, rig up, set beam, set floors, bopps, tongs, pull rods, didn't have rod tongs in my times before this company lol, pull tubing. Completions n recompletions. Set plugs, drill plugs, survey well, schwab to bring fluids up, wirelines, cleaning rig, greasing rig from top to bottom etc. Quick summary of job description, many more details that go into production on a daily bases.

  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Used critical thinking to break down problems, evaluate solutions, and make decisions.
  • Developed and maintained courteous and effective working relationships.
  • Assisted in rig maintenance, ensuring safety protocols were followed consistently.
  • Trained new floorhands on equipment operation and safety procedures effectively.
  • Showcased strong physical stamina throughout long shifts while remaining alert and focused on completing assigned tasks.

Education

Diploma - Metal Workshop Welding - El Campo (2003-02 - 2003-02)

Skills

Apprenticeship/Journeyman

Reviews

Related