Snr. Project Manager at MetaOption LLC (Microsoft Solutions Partner) (2025-01 – 2025-12)
- Led the merging of two disparate ERP systems (MS NAV, Glovia) after a company acquisition, on-time and budget with no disruption to operations.
- Delivered a custom warehouse management system project to an apparel retail company running MS Business Central, on-time and budget, yielding a 30% increase in warehouse efficiency and shipment accuracy.
- Delivered a shipping system for an event equipment rental company which led to 60% efficiency and accuracy improvement of operations.
Snr. Project Manager at VizworX Inc. (2019-05 – 2023-11)
- Delivered custom software projects with significant AR/VR and AI components across defense, government, and private sectors, managed $6M+ budgets and achieved 100% on-time delivery.
- Led cross-functional teams of 30+ professionals, which boosted customer satisfaction by 15%.
- Enhanced productivity by 20% through Agile methodologies, which reduced project cycles by 25%.
Snr. Consulting Business Analyst and Technical Lead at Alberta Tubular Products Ltd. (2018-02 – 2019-01)
- Led the integration of ERP systems with middleware interfaces, which achieved 100% data accuracy rate and reduced integration errors by 100%.
- Conducted comprehensive current state and gap analysis as a business analyst, identified key inefficiencies and drove 20% improvement in process efficiency.
- Managed infrastructure replacement projects, oversaw virtual machine migration and reduced downtime by 40% during transitions.
- Implemented an IT outsourcing business model, which resulted in 15% cost savings and improved service delivery by 25%.
Project Manager at Long View Systems (2013-10 – 2016-12)
- Managed the implementation of data communications infrastructure for a new oil pipeline, which ensured a 100% uptime during operations.
- Coordinated the deployment of satellite, terrestrial, and RF communication systems, which reduced installation time by 20% and achieving 100% coverage across remote areas.
- Integrated SCADA systems with the communication infrastructure and improved real-time monitoring capabilities by 30% and enhanced operational efficiency.
Manager of Shared Services at Schneider Electric (2008-12 – 2013-07)
- Implemented Microsoft Project Server for PMO development, led sales implementation of Salesforce CRM, and managed corporate metrics reports, improving project tracking efficiency by 20% and achieving 100% Salesforce user adoption.
- Drafted contracts with service vendors, developed budgets, and maintained cost center control, which led to 15% operational cost reduction.
- Established and managed a VM farm, which included hardware sizing, ordering, assembly, RAID storage configuration, and hypervisor installation. This increased server efficiency by 35%.
- Identified and mitigated IT system risks, implemented security hardening measures for REACT team, and managed critical system failures, reducing incidents by 40%.
- Served as Project Technical Leader for implementing a pilot & Y2K SCADA system on the Windows NT platform, achieving a 20% increase in system reliability and Y2K compliance.
- Co-developed multiple variants of the Modbus communications protocol, enabling communication with custom RTUs as part of SCADA projects, which enabled 100% re-use of existing hardware equipment to the value of $400K.
- Managed testing and improvement efforts for the EFM (Electronic Flow Measurement) application, which led to a 30% reduction in measurement errors.
Project Automation Lead at Bantrel Co. (2004-08 – 2008-08)
- Led automation for the EnCana Christina Lake project ($110M) and the Suncor MNU project ($600M), oversaw planning and deployment of hardware and software infrastructure.
- Assigned to Suncor, a sister company, for 12 months as the Business Analyst Lead for an SAP implementation project.
- Directed a team of business analysts for gap analysis and mitigation and ensured project readiness for the new systems.
Business Analyst at Alberta Electric System Operator (2003-09 – 2004-06)
- Defined front-end business requirements for an electrical dispatching system and other software projects, created detailed specifications for design.
- Developed QA test plans and led testing which reduced post-release defects by 25% and sped up issue resolution by 30%.
Senior Software Developer at GE Capital (2001-12 – 2003-07)
- Mentored the software development team in proper software development processes and use case documentation, improving adherence to best practices by 30%.
- Coached the team through project phases, resulting in the creation of detailed use case documents by analyzing requirements and consulting with subject experts.
- Co-designed the behavior of the Graphic User Interface, contributing to a 24% improvement in user interface efficiency and usability.
- Wrote stored procedures for data manipulation in an OO database, enhancing data processing speed by 25%.
- Conducted SCADA protocol testing and modification and configured real-time SCADA databases to improve system performance and reliability.
Career Break at Unaccounted Time (2023-12 – 2024-12)
During this year I took time off to care for my aging parents.
Software Developer at Various (2001)
Software developer with extensive experience in C, SQL, Database design, Process Control, Commercial Application development.