Skip to main content
Simon Hall

Simon Hall

Ground Worker with 20 years construction experience

Talent
BirminghamMember since September 25, 2026
GroundworkerSlab layingConcrete finishingTarmac layingPipe layingDrainageKerb layingManual handling
·

Hire this person

Send a job offer directly to this candidate

GroundworkerSlab layingConcrete finishingTarmac layingPipe laying

About

Hard working, punctual, disciplined, polite, respectful. Can work as individual or part of team. Worked in construction since 2002, beginning as a labourer, with 8 years as a skilled worker/Groundworker.

Experience

Ground Worker/operative - Barhale plc - Walsall

(2022-05)

  • Pipe laying
  • Drainage (shallow -600 ml)
  • Deep drainage (3-4 metres limited roles)
  • Installing man hole rings & benching
  • Concrete finishing (float & brush finish)
  • Dumper & roller operator

Ground Worker - D.H.C - Smethwick

(2021-10 - 2022-04)

Predominantly slab laying for the entire estate (8 houses & multi roomed apartment complex) mainly doing it alone, screeding beds to set levels & laying 450x450x 30 ml patterned slabs around the entire mini estate, approximately 1000 slabs laid, majority single handedly.

Groundworker - J.M.C Green builders (return) - Evesham

(2021-01 - 2021-10)

Contracted work for local council authority (Dudley) repairing paths & walls on council properties.

  • Slab laying
  • Concrete finishing

Ground Worker - M.j building & civil engineerig - Birmingham

(2019-10 - 2021-01)

Working on highways expansion in the Selly oak area of Birmingham.

  • Kerb/edging laying
  • Installing 'iron work' (gulley lids)
  • Man hole benching

Ground Worker - POD Point - London

(2018-09 - 2019-10)

Commercial & domestic groundworks for installing power points for electric vehicles, various locations, house gardens/Driveways, commercial car parks, business verges. Would have to identify most convenient areas to trench dig or block pave remove & re-instate, install ducting for underground cables & build concrete bases for stands for charge points if asked for. Working all over country, in teams of 2 where I was lead.

Would receive work off provided tablets & depending on where I was working where regularly would have to work self sufficient, identifying equipment required, finding local building suppliers & purchasing them to complete jobs.

Ground Worker - K W Bell Group - Gloucester

(2018-03 - 2018-09)

Working on New build housing estate. Spent months on installing a walkway through woodland backing onto the new housing estate, using timber panels & wooden stakes as edgings to a set width from beginning to end (almost 1 mile) & using a weather residual fine stoning to use as the path base.

  • Pipe laying/shallow drainage (600 mml)
  • 'Block & beam' installing

Ground Worker - J..M.C Green Builders - Evesham

(2017-09 - 2018-03)

Worked on various water treatment plants across the Midlands, replacing sections of old metal piping (600 ml dia.); re-instating dugout areas & compacting ground using 'whacker plates'.

  • Concrete finishing

Ground Worker - Colas Ltd - Birmingham

(2017-06 - 2017-09)

  • Pipe laying
  • Drainage (shallow)
  • Kerb laying
  • Tarmac laying
  • Concrete finishing (float)

Ground Worker - Keavman contractors - Birmingham

(2017-01 - 2017-06)

Part of team doing groundworks for a large size warehouse/unit owned by Western union power where heat/power source ran from a state of art furnace that worked from using recycled timber/pallets, etc, mainly constructed & partly designed by company I worked for at time.

  • Pipe laying
  • Drainage (shallow -600 ml)
  • Deep drainage (septic tank 4 m deep)
  • Concrete finishing (rough & float finish)
  • Steel fixing

Ground Worker - Team xero - Warwick

(2014-03 - 2016-12)

  • Pipe/duct laying
  • Drainage/gulley pots/inspection chambers (shallow-600ml -1 metre)
  • Kerb laying
  • Cable feeding/pulling
  • Installing 'iron work' (man hole /gulley lids)
  • Dumper & roller operating

Education

B-tec level 3 - Building studies - Mons Hill college (2007-09 - 2008-06)

GCSE - English, History, Geography, Electrical Science - Thorns School & Community College (1982-09 - 1986-07)

B-tec level 3 - Health & safety, Environmental Awareness, Technical Drawing (CAD), The Science of materials used in construction, Graphical Detailing in Construction, Surveying - Present

Reviews