Seeking a position in your esteemed company where I get an opportunity to prove my technical skills and utilize my knowledge and skills, in turn enhancing the professional growth for me and for the company.
Experience
Project Manager at IBEES INTERIORS (2024-05 – Present)
Team Leader for all the Project Supervisors. Supports and guides AIF Site Supervisor for their assigned Projects. Conducts feasibility study at site and ensures design integrity in execution and close consultation with OM, GM.
Verifies Design
Documents with Site Feasibility. Visits sites regularly for quality of execution and timeliness of execution. Ensures material specs as prescribed are used at site. Ensures timely availability of material from Sourcing/Logistics team. Troubleshooting if any issues in design and or execution come up interacting quickly with OM, GM for speedy resolution. Follow up with all execution vendor's unplanned/emergency material purchases at site, if required. Sourcing of any new material, as may be needed. Assumes the Site supervisor role for any Projects directly assigned. Maintains up-to-date-Information of each Project Site on daily basis. Ensures daily/weekly/monthly updates to both directors. Coordinate with PMC and get approval for Work execution and Final approval for completion Work. Get approval from PMC for RA Bills.
Project Manager at EPIC INC (2022-10 – 2024-04)
Team Leader for all Project Supervisors. Supports and guides AIF Site Supervisor for their assigned Projects. Conducts feasibility study at site and ensures design integrity in execution, I in close consultation with OM, GM.
Verifies Design
Documents with Site Feasibility. Visits sites regularly for quality of execution and timeliness of execution. Ensures material specs as prescribed are used at site. Ensures timely availability of material from Sourcing/Logistics team. Troubleshooting if any issues in design and or execution come up interacting quickly with OM, GM for speedy resolution. Follow up with all execution vendor's unplanned/emergency material purchases at site, if required. Sourcing of any new material, as may be needed. Assumes the Site supervisor role for any Projects directly assigned. Maintains up-to-date-Information of each Project Site on daily basis. Ensures daily/weekly/monthly updates to both directors.
Senior Project Engineer at INTEX SPACE SOLUIONS PVT LTD (2017-10 – 2022-09)
- Preparing Estimation of Civil and Interior Work
- BOQ Preparation for all Works
- Execution for all the Works as per approved Specifications in BOQ
- Finalization of Vendor and Labour for all works as approved rates
- Preparation of RA bills for client checking
- Preparation of bills for labours and vendors
- Ensure all the works in schedule
Project Engineer at RMS CONSTRUCTION (2015-10 – 2017-09)
- Executing the site related work as per the issued "Good For Construction" drawing
- Checking bills for Sub Contractors for the work done during the period
- Checking and Submitting the Daily Progress Reports
- Preparing Weekly Progress Report for the project review meetings in every month
- Check and track the work as per the Programme schedule
- Submission of RA Bills to client
- Mobilization of Manpower for site related works
- Checking the indent and Material received vouchers and issue to client
- Allotting works to the contractors and preparing schedules for the works
Project Engineer at INDU HOUSING DEVELOPMENT (CHENNAI) PRIVATE LIMITED (2013-04 – 2015-09)
Three Blocks (RukumaniSaroja&Kuppurangam) Total 82 Flats. One Block (Akshara) Total 14 Flats. Residential Apartment at Baby nagar (Stilt parking + 4 floors).
- Preparing bills of Contractors for the work done during the period
- Preparing and Submitting the Daily Progress Reports and Progress photos of work done to Head Office
- Preparing Weekly Progress Report for the project review meetings in every week
- All flats Wood Work Making & Fixing (Cup boards, Loft & Modular Kitchens)
- Preparing of Final Snag list in all work items and Finally Key Handing Over
Senior Site Engineer at KG Foundations (2010-03 – 2013-03)
- Tracking the progress of various works
- Coordinating with the contractors in order to make the work to progress as per the schedule
- Checking and preparing bills of Contractors for the work done
- Preparing Daily Progress Reports of work done
- Preparing Weekly Progress Report for the project review meetings
- Allotting works to the contractors and preparing schedules for the works
- Preparing of Snag list in all work items
- Preparing and maintaining the registers of the cube test in 7 and 28 days
- Clearing obstructions for the works to the contractors and ensuring the progress
Site Engineer at Elite Engineers (1999-05 – 2010-02)
- Checking the quality of various works executed at the site as per drawing
- Verifying the reinforcements and shuttering of various RCC members With the GFC drawings and concreting
- Preparing measurements and checklist for the work done as per drawing
- Coordination and allocation of the sites and monitoring the activities of the Junior Engineers
- Checking the bills submitted by the sub contractors as per the drawings
Education
B.E in Civil Engineering – Anna University (2005-06 – 2009-04)
D.C.E (1996-06 – 1999-04)
Secondary School leaving Certificate (1995-06 – 1996-04)