Punit Raval
Sr.Manager | Reliability Engineer | Extra High Voltage
Hire this person
Send a job offer directly to this candidate
About
B.Tech (Electrical) with 12 years of experience in Power Plant and Refinery maintenance activities encompassing project planning, finalization of schedules and monitoring progress or erection & commissioning activities. Proficient in identifying & resolving problems, ramping up project activities with on time deliverables and maximizing productivity. Excellent in planning & implementing the preventive, predictive & breakdown maintenance schedules for improving overall reliability-ty and safety of plant equipment & machinery.
Sound understanding of PM (Preventive Maintenance), Corrective Action and Preventive Action (CAPA), BM (Breakdown Maintenance), CBM (Condition Base Maintenance) and all Routine Maintenance of Electrical Equipment. Expertise in managing project activities to facilitate smooth maintenance process, enhance productivity and reduce cost. Possess technical knowledge of Erection, Commissioning and Testing of Generator, Power Transformer, Circuit Breaker, MCC, PMCC and other Electrical Equipment.
An effective communicator with excellent relationship building, strong analytical and problem-solving skills.
Experience
Sr.Manager, Electrical Relaibility Engg. - Reliance industries ltd. - Jamnagar, Gujarat
(2023-04)
Providing support for Power System Design engineering review, installation, and commissioning of EHV system.
Provide Engineering
Support, engineering assessment, engineering design, troubleshoot, to EHV Power system for safe and reliable operation. Provide engineering support for Factory acceptance testing and inspections, site acceptance test of EHV system electrical equipment. Support to construction/PMT for Statutory and Regulatory compliance during project phase. Actively participating in Pre commissioning and commissioning activity like, erection as per GA drawing, cold loop checks of control and protection scheme, reliability improvement initiative, testing and run test. Responsible for overall Selection & Standardization of best practices specific to site electrical equipment during Pre-commissioning/commissioning/Steady State. Implementation of COE for recommendations on improvements in reliability from construction stage. Conducting inspections and verification tests during Preventive/Corrective maintenance, encompassing Insulation Resistance, Winding Resistance, Polarize Index, Bus Resistance, and Hi-pot tests (Dielectric Strength Test). Managing the Operation and Mainten
- Erection and Commissioning of T155 type 400kV GIS GE make first time in history of Reliance
- Erection and Commissioning of 220kV,33kV GE and Siemens make GIS , 500MVA , 315MVA,174 MVA transformer
- 220kV underground and overhead cable jointing and Testing
- Spearheading project commissioning at the New Renewable Energy GIGA complex.
- Erection, Testing, Maintenance and Commissioning 400kv, 220kvand 33kv equipment like CT, PT, LA, Circuit breaker & HT/LT Cable
- 400 kV,220kV 33kV GIS HV Test, PD measurement, Breaker DCRM, Time Test ETC
Sr. Engineer - KOREA ELECTRIC POWER CORPORATION (KEPCO, KPS) - Bhavnagar, Gujarat
(2015-07 - 2023-04)
250*2 MW Bhavnagar lignite thermal power station (BLTPS) @ village Padva, Bhavnagar, Gujarat, India.
- 295 MVA Genearator,315 MVA (220kV/16.9kV), 50 MVA (16.9 kV/6.6kV) & 174 MVA (220kV/33kV) Transformer, DAVR, HT/LT Motor Testing & Commissioning
- Erection and commissioning of ABB make VSD Drive (ACS800, ACS 880) Allen Bradley Power Flex (550, 750)
- Experience in PM, CM, & CBM of Major Electrical Equipment's like Generator, Power Transformer, Distribution Exposure in Generator Transformer HV Bushing & IPBD CT Replacement, Generator Circuit Breaker Single Pole Replacement, Transformer, EHV Switchgears, VFD, DC System
- Handled Planned Shutdown, Emergency Breakdown, Partial and Full Black out condition
- setting of relay co-ordination with respect to system stability
- Handled Electrical Testing, Stability Testing of Generator, Transformer, Unit & Station Auxiliary Transformers
- Having Exposure in HT Motors (Up to 4.9 MW) & LT Motor Maintenance
- Having Experience in Material Management, Manpower Management, Spare Management, Service Management
- Exposed to emergency scenario in switchyard leading to replacement of LA, PT, Post Insulator, Rubber string Insulators
- Exposure to Best Maintenance Practices for Power Plants across
Assistant engineer - KOREA ELECTRIC POWER CORPORATION (KEPCO, KPS) - Kutch, Gujarat, India
(2013-02 - 2015-07)
125*2 MW Akri mota thermal power station (ATPS) @ Nani Chher, Kutch, Gujarat, India.
Engineer - Jayesh Cables - Ahmedabad, Gujarat
(2011-08 - 2013-01)
Manufacturer of Submersible Pump Winding Wires
- Testing of manufactured winding wire of submersible pump
- Supervision during cable manufactured
Education
Bachlor Of Engineering - Electrical - Shrinathji Institute OF Tech and Engg (2008 - 2011)
Diploma - Electrical Engg - Technical Examination Board, Gandhinagar (2007 - 2007)
Secondary School Certificate - Gandhinagar (2004 - 2004)
