CMP Lead (North Bengal) - Technocon Services - Siliguri
Presently working at Technocon Services as service provider of Reliance JIO.
- Working at as Service Provider Reliance JIO at Siliguri CMP looking Siliguri Plains & Hills.
- Maintaining total faults under Siliguri CMP taking responsibilities of maintaining the Utility/ Fiber/ ISP.
- Deputing and planning with vendors/ Fiber repair Teams - FRTs / Fiber route patrollers / In-House FRT teams / Utility/ ISP team.
- Prepare important MIS of fiber /Utility / ISP able to analyses various reports and take necessary preventive / corrective action apart from timely submission of selected desired reports to the concerned.
- Planning with management for improvement of business stability and improvement of project.
- Maintain the materials in SAP.
- Project handover from Vendor by proper method.
- Planning for route new route survey
- Preparing RCA
CMP Lead (North Bengal) - Narula Infrastructure Pvt. Ltd - North Bengal
(2022-10-05 - 2026-01-14)
Worked at Narula Infrastructure Pvt. Ltd as Service provider of Airtel Project.
- Working on airtel fiber 5G project in LM & BB
- Coordinate with customer for project delivery time.
- Deputing and planning with vendors/customer / following up the survey with our project engg.
- Planning for survey of new nodes
- Maintain DPR /
- Planning for new survey
- Coordinate with team members for achieve the project delivery in time.
- Looking the Airtel 5G fiber project south Bengal.
- Continuous Follow-up with project engg for site delivery
- Managing manpower and Planning
- Managing the project of Data center.
- Liaising with Authority
Cluster Lead (South Bengal & Kolkata) - TCTS Pvt. Ltd - South Bengal & Kolkata
(2021-09-15 - 2022-09-21)
Worked on TCTS pvt. Ltd as Service provider of Vodafone idea.
- Looking TCTS MP all Vodafone fiber.
- Maintaining fiber KPIs on Faults/1000Km (FTKM) and Mean time to repair of fiber faults through his In house teams.
- Deputing and planning with vendors/ Fiber repair Teams – FRTs / Fiber route patrollers / FRT teams Consisting of Fibre splicers and labours
- Prepare important MIS of fiber performance, able to analyses various reports and take necessary preventive / corrective action apart from timely submission of selected desired reports to the concerned.
- Project handover from Vendor by proper method.
- Planning for customer connectivity, BLRO, small scale industries
TL Dooars (North Bengal) - Technocon Services pvt Ltd - North Bengal
(2021-01-02 - 2021-10-30)
Worked at Technocon Services pvt Ltd as Service provider of Reliance Jio.
- Looking Asansol MP all jio fiber maintaining 07 FRT.
- Maintaining fiber KPIs on Faults/1000Km (FTKM) and Mean time to repair of fiber faults through his In house teams.
- Deputing and planning with vendors/ Fiber repair Teams - FRTs / Fiber route patrollers / In-House FRT teams Consisting of Fiber splicers and labours
- Prepare important MIS of fiber performance, able to analyses various reports and take necessary preventive / corrective action apart from timely submission of selected desired reports to the concerned.
- Project handover from Vendor by proper method.
- Planning for route new route survey
- Preparing RCA for fiber cut
Area Manager (Asansol CMP) - Frontline NCR Business solution PVT Ltd - Burdwan, West Bengal
(2017-10-12 - 2020-12-30)
Worked at Frontline NCR Business solution PVT Ltd under direct pay role.
- Looking Burdwan/Arambagh MP all RCOM and JIO leased fiber.
- Maintaining fiber KPIs on Faults/1000Km (FTKM) and Mean time to repair of fiber faults through his In house teams.
- Deputing and planning with vendors/ Fiber repair Teams - FRTs / Fiber route patrollers / In-House FRT teams Consisting of Fiber splicers and labours
- Prepare important MIS of fiber performance, able to analyses various reports and take necessary preventive / corrective action apart from timely submission of selected desired reports to the concerned.
- Planning for spare fiber rectification at NLS routes.
- Planning for customer connectivity, BLRO, small scale industries
- RCA analysis for fiber fault
Area Manager (Burdwan /Arambagh MP) - Essjay Ericsson India Pvt Ltd - Durgapur, West Bengal
(2014-12-01 - 2017-10-11)
Worked at Essjay Ericsson India Pvt Ltd under direct pay-roll.
- Fiber Splicing OTDR Testing Fiber Maintenance
- Working on SAP
- Looking MSC BSC IS location
- Managing manpower and Planning given for site visit Co-ordination with Vendor for site Support/maintenance
- Deputing and planning with vendors/ Fiber repair Teams - FRTs / Fiber route patrollers / In-House FRT teams Consisting of Fibre splicers and labours
- Worked and experience on various TMIs such as OTDR Machine, Splicing Machines / LSPM.
- Fair knowledge on locating Fibre routes with the help of Cable locator
- Prepare important MIS of fiber performance, able to analyses various reports and take necessary preventive / corrective action apart from timely submission of selected desired reports to the concerned.
- Interact with peer teams of Transport, MEN, and NNOC in handling FTs and getting them closed
- Experience in Fibre Project
Senior Manager (Durgapur MP) - ALCATEL-LUCENT MANAGED SOLUTIONS (I) PVT LTD - Durgapur, West Bengal
(2013-04 - 2014-12)
Worked under direct pay-roll.
- NOC Visibility & Acceptance Test
- Stock & material maintenance
- Operation & Maintenance of Sites
- Fiber Splicing OTDR Testing Fiber Maintenance
- Working on SAP
- Looking MSC BSC IS location
- Managing manpower and Planning given for site visit Co-ordination with Vendor for site Support/maintenance
- Worked and experience on various TMIs such as OTDR Machine, Splicing Machines / LSPM.
- Fair knowledge on locating Fibre routes with the help of Cable locator
- Interact with peer teams of Transport, MEN, and NNOC in handling FTs and getting them closed
- Experience in Fibre Project and O&M
Project Engg & Operation Support Engg (Durgapur Cluster) - RELIANCE COMMUNICATIONS LTD - Durgapur, West Bengal
(2008-01 - 2013-03)
Worked under direct pay-roll.
- Installation & Commissioning of Microwave Antenna
- Configuration of NEC Radio SDH & PDH
- Configuration of Router E1 testing & E1 Extension
- Installation & Commissioning of UBR
- NOC Visibility & Acceptance Test
- Operation & Maintenance of Sites all utilities of site
- Fibcom Installation & Commissioning
- Fiber Splicing OTDR Testing Fiber Maintenance
- Working on SAP for stock maintenance
- Looking MSC BSC IS location
- Managing manpower and Planning given for site visit Co-ordination with Vendor for site Support/maintenance
Project Engg & Operation Support Engg (Durgapur Cluster) - Valere Power India Pvt Ltd - East Zone
(2006-11 - 2008-01)
Worked as Customer support engg in east Zone.
- Technical operation of SMPS
- Solving the Circuitry problem
- Software loading in Alarm Controller.
- Giving customer on line support for solving the problems.
- Software up gradation in supervisory controller
Sr. Manager (East Zone) - HBL NIFE POWER SYSTEM LTD - Eastern Zone
(2004-03 - 2006-11)
Worked as a Sales and Service engg in Eastern Zone under Dedicated Sales & Service for Reliance.
- Installation & Commissioning of VRLA ,NI- Cad Battery Bank
- Technical support to the Customer.
- Battery Health Testing
- Preventive maintenance work in BTS , IS POI,MCN
- Installation & Commissioning Battery banks at Industries, Railway
- Checking the battery configuration
- Supervising the battery installation at MCN, PO1,IS
- Planning with the customer for site installation