Skip to main content

Rico Masangkay

MECHANICAL ENGINEER

Talent
Quezon, Metro ManilaMember since June 24, 2026
Project ExecutionMechanical DesignSupervisionCo-ordinationQuantity SurveyingQuality AssuranceDesignSAESSAEPSAMSSSMACNAASHRAEUPCIPCNPCNFPAASMEBSAPIHVAC systemsQuality Management SystemCAD operationAs-built drawingsFunctional testing and commissioningPredictive and preventive maintenance
·

Hire this person

Send a job offer directly to this candidate

Project ExecutionMechanical DesignSupervisionCo-ordinationQuantity Surveying

About

I have gained 20 years of experienced in different reputable companies as a mechanical engineer in the field of Building construction, Consulting and Manufacturing industries. I acquired a thorough knowledge of various aspects of Project Execution and Mechanical Design for commercial and industrial buildings. My experiences allow me to performed supervision, co-ordination, quantity surveying, quality assurance, design and correspondence; handling sub-contractors, site setup and management responsibilities within the MEP field.

I am well versed in Saudi Aramco and International standard such as SAES, SAEP, SAMSS, SMACNA, ASHRAE, UPC, IPC, NPC, NFPA, ASME, BS, API, and other projects specification.

Experience

Project Manager - Pacific Air Conditioning and General Services Inc.

(2023-02)

Altaire Building (45 Storey Office Facility)

  • Analyze the project scope of work, design, quality management and timeline project schedule.
  • Monitor the progress of construction phase base on programmed schedule and work accomplishment ensuring the work is completed on time and within budget requirement.
  • Coordinate with clients and contractors in terms of materials availability, quality system, safety requirement and program schedule, ensuring the project design and specification are being met.
  • Provide reports / update on financial status, progress billing, budget expenses, site issues and concern.
  • Monitor daily accomplishments, material availability and manpower requirement.
  • Coordinate with client and sub-contractors on work assignment, work progress and providing solutions on site issues and concern.
  • Ensure safety practices are properly implemented

Mechanical Site Supt. (Saudi Aramco PMT–OPD/Marine) - Worley Parson Engineering Consultancies Co. (Al Khobar Saudi Arabia) - Al Khobar Saudi Arabia

(2014-02 - 2020-09)

Badge# 8083618. Projects: West Pier Upgrade, Ras Tanura /Abu Ali Pier Upgrade, Jubail (Jan 2018 to Sept. 2020); Abu Ali Fish Hatchery Project, Jubail (February 2014 to December 2017). Responsible for executing tasks and producing deliverables as outlined in the project plan. Assist the Project Engineer in implementing construction plan to ensure the efficiency, quality, safety, and performance of construction in order to meet the project objectives.

  • Provide assistance and coordination to project contractors to meet the project objectives in a timely manner in terms of daily plan activities. Coordination involves to other disciplines such as Civil, Electrical, Proponents, Operations and Contractor's engineers
  • Review and provides recommendation on various submittals such as project design and specification, quality plans, schedules, method statements and material submittals.
  • Ensure all deliverables are in compliance and accordance with Saudi Aramco Standards and other applicable international standards such as NFPA, UPC, IPC, ASHRAE, SMACNA, IPC, API, ASME, BS and others.
  • Responsible for monitoring and inspection of various installation and testing of piping aboveground and under-ground for Diesel, Air, Domestic water, Drainage and Fire water lines. Including installation and testing of various pumps for Diesel, Potable water, and Fire protection.
  • Responsible for monitoring and inspection of installation and testing of HVAC systems such as PACU units, Ductworks and other accessories.
  • Ensure best practice of mechanical system installation is being executed in accordance with quality procedures, safety manuals and manufacturer's recommendation.
  • Ensure work safety environment are monitored and controlled, ensure personnel are following health and safety protocols in terms of wearing their PPEs, utilization of proper tools and equipment and housekeeping.

QA/QC Mechanical Engineer - Advance Vision Co. (SBG), (Jeddah Saudi Arabia) - Jeddah Saudi Arabia

(2011-02 - 2014-01)

Project: King Abdul-Aziz International Airport Project, Jeddah. Providing technical reference and focus for planning, implementation, administration and development of the range of processes and procedure which form the core of Quality Management System.

  • Provide quality procedure for installation and testing of piping (carbon steel, ductile iron, pvc, cpvc), equipment (PACU units, Pumps for Fire water and domestic water supply) and other accessories, Inspection and test plan (ITP), Installation checklist, O&M manuals and other QA/QC documents required in the project.
  • Conduct inspection and preparation of quality documents for the installation of fire protection, potable water supply, chilled water piping, sewer and drainage lines, at Passenger terminal buildings, Radio tower and Mosque including air handling units, ductworks and other accessories.
  • Record and prepare technical document references and monthly report statuses of work inspection, non-conformance, corrective and preventive action, ensure documentation filing is properly provided.
  • Supervise and monitor mechanical site activities such as Installation of FCU's, Air Handling Units, Exhaust fans, Chilled water pump, Ductworks, piping installation and other accessories.
  • Implements project HSE program, see to it that the workers are following safety act and condition while working in their respective workplaces.

Mechanical Site Engineer - Advance Vision Co. (SBG), (Riyadh Saudi Arabia) - Riyadh Saudi Arabia

(2010-07 - 2011-01)

Project: Princess Noura University Project, Riyadh.

Mechanical Site Engineer - Conspel Qatar WLL - Doha Qatar

(2008-04 - 2010-03)

Project: Al Wakra Hospital Project, Doha Qatar.

  • Reviews and checked construction plans and project specifications, design drawing, and quality plan.
  • Prepare shop drawings, coordination drawings and as-built drawings.
  • Supervise and monitor the installation of piping for Plumbing, Fire Fighting and HVAC system.
  • Ensure quality of works is being implemented in accordance with quality standard and procedure.
  • Prepare material take-off and requisition of materials and tools required on site.
  • Supervised and monitor the installation of different equipment such as Chillers (6 x 1000tons), AHU's, FCU's, Exhaust Fans, Chilled water pumps, Boilers, Fuel system, Oxygen generators, located at Service building. Including water pumping station, Water filtration system, Fire water system and other related accessories at the Water tank building.
  • Prepare program of works, 3 weeks look ahead schedule and daily/weekly accomplishment report.
  • Conduct coordination meeting with sub-contractor, civil and other related groups in concerned with the mechanical and plumbing work activities on site.
  • Perform functional testing and commissioning of mechanical equipment and other services.
  • Ensure safety practices are properly implemented.

Mechanical Site Engineer - SKI Construction Group, Inc. - Philippines

(2006-01 - 2007-07)

Project: North Triangle Commercial Center Project-TRINOMA. Directly responsible for the efficient and timely implementation of Mechanical / Plumbing / Fire Protection works. Coordinate with the MEPF Superintendent on proper sequencing of work in relation to Civil/Architectural Works.

  • Review project design drawings, specifications and other standard documents.
  • Support the project management in terms of schedules, cost estimating, and reporting.
  • Responsible for the preparation of material submittals, material estimates and requisition.
  • Supervise effective and implementation of work. See to it that work is meeting the schedule.
  • Regularly interfaces with other engineering disciplines such as architectural, structural, electrical, and subcontractor.
  • Checking the design load calculation for HVAC and including pipe sizing calculation.
  • Perform CAD operation for duct and piping design layout, and provide equipment selection within required specification.
  • Inspect contractor's piping installation, materials deliveries, ensure it is compliance with design, specifications and standards requirements.
  • Perform functional testing and commissioning.
  • Implement safety protocol as required in the project.

Service Engineer - Tams Technology Co., LTD - Iwate Ken Japan

(1998-01 - 1998-08)

Project: Automation Semiconductor (Assembly Dept.) – Iwate Ken Japan.

  • Involved hands-on training on the assembly of auto-molding systems for plastic packaging of I.C.'s.
  • Familiarizes in system operation, overhauling, mechanical adjustments and trouble-shooting of auto molding equipment.
  • Service work assignments involved setting-up auto-molding systems at clients/makers manufacturing site and evaluating equipment performance which is essential for buy-out approvals

Equipment Engineer - Analog Devices Phillippines, Inc. - Sucat Paranaque

(1996-02 - 1997-12)

Project: Automation Semiconductor (Maintenance Dept.) – Sucat Paranaque.

  • Supervised equipment line operation process at end of line DTFS for plastic packaging I.C.'s.
  • Works involved close supervision and coordination with line maintenance operators, vendors, purchasing department, production supervisors, and managers.
  • Responsible for the documentation and monitoring of all critical tooling, availability of spare parts, weekly review of tooling consumption, predictive and preventive maintenance schedule, tooling regrinding operation

Skills

MECHANICAL ENGINEER

Reviews

Related